메뉴 건너뛰기




Volumn 186, Issue 2, 2008, Pages 720-734

Incremental analysis for MCDM with an application to group TOPSIS

Author keywords

Benefit cost ratio; Engineering economy; Incremental analysis; Multi criteria analysis; Preference aggregation; Ratio scale; TOPSIS

Indexed keywords

DECISION MAKING; INDUSTRIAL ENGINEERING; MATHEMATICAL MODELS;

EID: 35348950938     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2007.02.012     Document Type: Article
Times cited : (144)

References (26)
  • 1
    • 0004804145 scopus 로고
    • Some problems in using benefit/cost ratios with the analytic hierarchy process
    • Bernhard R.H., and Canada J.R. Some problems in using benefit/cost ratios with the analytic hierarchy process. The Engineering Economist 36 1 (1990) 56-65
    • (1990) The Engineering Economist , vol.36 , Issue.1 , pp. 56-65
    • Bernhard, R.H.1    Canada, J.R.2
  • 4
    • 0004232519 scopus 로고
    • Ellis Horwood, Chichester, West Sussex, England
    • French S. Decision Theory (1988), Ellis Horwood, Chichester, West Sussex, England
    • (1988) Decision Theory
    • French, S.1
  • 9
    • 35348975406 scopus 로고    scopus 로고
    • MacCrimmon, K.R., 1968. Decisionmaking among Multiple-attribute Alternatives: A Survey and Consolidated Approach. Memorandum RM-4823-ARPA, Rand Corp., Santa Monica, CA.
  • 10
    • 35349003987 scopus 로고    scopus 로고
    • The cutoff benefit-cost ratio should be exceed one
    • Miller E.M. The cutoff benefit-cost ratio should be exceed one. The Engineering Economist 46 4 (2001) 312-319
    • (2001) The Engineering Economist , vol.46 , Issue.4 , pp. 312-319
    • Miller, E.M.1
  • 12
  • 13
    • 0031275949 scopus 로고    scopus 로고
    • On the equivalence of operational performance measurement and multiple attribute decision making
    • Parkan C., and Wu M.L. On the equivalence of operational performance measurement and multiple attribute decision making. International Journal of Production Research 35 11 (1997) 2963-2988
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 2963-2988
    • Parkan, C.1    Wu, M.L.2
  • 15
    • 35348966671 scopus 로고
    • Tutorial: Incremental analysis in capital budgeting
    • Rose A. Tutorial: Incremental analysis in capital budgeting. Cost Engineering 30 10 (1988) 13-15
    • (1988) Cost Engineering , vol.30 , Issue.10 , pp. 13-15
    • Rose, A.1
  • 18
    • 0034755692 scopus 로고    scopus 로고
    • The decision by the US Congress on China's trade Status: A multicriteria analysis
    • Saaty T.L., and Cho Y. The decision by the US Congress on China's trade Status: A multicriteria analysis. Social-Economic Planning Sciences 35 (2001) 243-252
    • (2001) Social-Economic Planning Sciences , vol.35 , pp. 243-252
    • Saaty, T.L.1    Cho, Y.2
  • 25


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.