A modified PSO algorithm for minimizing the total costs of resources in MRCPSP

Author keywords

[No Author keywords available]

Indexed keywords

DUE DATES; LOCAL SEARCH METHOD; META HEURISTIC ALGORITHM; MODIFIED PARTICLE SWARM OPTIMIZATION; MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; PENALTY COST; PRECEDENCE RELATIONS; PRIORITIZATION; PROJECT ACTIVITIES; PSO ALGORITHMS; RENEWABLE AND NON-RENEWABLE RESOURCES; RENEWABLE RESOURCE; TARDINESS PENALTIES; TOTAL COSTS;

EID: 84859767957     PISSN: 1024123X     EISSN: 15635147     Source Type: Journal    
DOI: 10.1155/2012/365697     Document Type: Article
Times cited : (15)

References (29)
  • 2
    • 82755177956 scopus 로고    scopus 로고
    • An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem
    • Ranjbar M., Khalilzadeh M., Kianfar F., Etminani K., An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem Computers and Industrial Engineering 2012 62 1 264 270
    • (2012) Computers and Industrial Engineering , vol.62 , Issue.1 , pp. 264-270
    • Ranjbar, M.1    Khalilzadeh, M.2    Kianfar, F.3    Etminani, K.4
  • 3
    • 0037448273 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
    • DOI 10.1016/S0377-2217(02)00136-4, PII S0377221702001364
    • Heilmann R., A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags European Journal of Operational Research 2003 144 2 348 365 (Pubitemid 35214208)
    • (2003) European Journal of Operational Research , vol.144 , Issue.2 , pp. 348-365
    • Heilmann, R.1
  • 4
    • 33748521972 scopus 로고    scopus 로고
    • A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
    • DOI 10.1287/ijoc.1040.0121
    • Zhu G., Bard J. F., Yu G., A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem INFORMS Journal on Computing 2006 18 3 377 390 (Pubitemid 44371778)
    • (2006) INFORMS Journal on Computing , vol.18 , Issue.3 , pp. 377-390
    • Zhu, G.1    Bard, J.F.2    Yu, G.3
  • 6
    • 33845522461 scopus 로고    scopus 로고
    • Multi-mode resource constrained project scheduling: Scheduling schemes, priority rules and mode selection rules
    • Lova A., Tormos P., Barber F., Multi-mode resource constrained project scheduling: scheduling schemes, priority rules and mode selection rules Inteligencia Artificial 2006 10 30 69 86 (Pubitemid 44925544)
    • (2006) Inteligencia Artificial , vol.10 , Issue.30 , pp. 69-86
    • Lova, A.1    Tormos, P.2    Barber, F.3
  • 7
    • 58949096631 scopus 로고    scopus 로고
    • An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    • Lova A., Tormos P., Cervantes M., Barber F., An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes International Journal of Production Economics 2009 117 2 302 316
    • (2009) International Journal of Production Economics , vol.117 , Issue.2 , pp. 302-316
    • Lova, A.1    Tormos, P.2    Cervantes, M.3    Barber, F.4
  • 8
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • DOI 10.1016/j.amc.2007.04.096, PII S009630030700553X
    • Jarboui B., Damak N., Siarry P., Rebai A., A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems Applied Mathematics and Computation 2008 195 1 299 308 (Pubitemid 350213083)
    • (2008) Applied Mathematics and Computation , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 9
    • 52049097838 scopus 로고    scopus 로고
    • A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
    • Ranjbar M., De Reyck B., Kianfar F., A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling European Journal of Operational Research 2009 193 1 35 48
    • (2009) European Journal of Operational Research , vol.193 , Issue.1 , pp. 35-48
    • Ranjbar, M.1    De Reyck, B.2    Kianfar, F.3
  • 10
    • 70349276753 scopus 로고    scopus 로고
    • A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
    • Van Peteghem V., Vanhoucke M., A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem European Journal of Operational Research 2010 201 2 409 418
    • (2010) European Journal of Operational Research , vol.201 , Issue.2 , pp. 409-418
    • Van Peteghem, V.1    Vanhoucke, M.2
  • 11
    • 84859736809 scopus 로고    scopus 로고
    • Solving a multi-objective multi-mode resource-constrained project scheduling problem with particle swarm optimization
    • Kazemi F. S., Tavakkoli-Moghaddam R., Solving a multi-objective multi-mode resource-constrained project scheduling problem with particle swarm optimization International Journal of Academic Research 2011 3 1 103 110
    • (2011) International Journal of Academic Research , vol.3 , Issue.1 , pp. 103-110
    • Kazemi, F.S.1    Tavakkoli-Moghaddam, R.2
  • 12
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • Baewicz J., Lenstra J. K., Rinnooy Kan A. H. G., Scheduling subject to resource constraints: classification and complexity Discrete Applied Mathematics 1983 5 1 11 24
    • (1983) Discrete Applied Mathematics , vol.5 , Issue.1 , pp. 11-24
    • Baewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 14
    • 69249217757 scopus 로고    scopus 로고
    • Particle swarm optimization: A study of particle displacement for solving continuous and combinatorial optimization problems
    • K. Tchomté S., Gourgand M., Particle swarm optimization: a study of particle displacement for solving continuous and combinatorial optimization problems International Journal of Production Economics 2009 121 1 57 67
    • (2009) International Journal of Production Economics , vol.121 , Issue.1 , pp. 57-67
    • Tchomté S, K.1    Gourgand, M.2
  • 18
    • 46849083916 scopus 로고    scopus 로고
    • A multiple objective particle swarm optimization approach for inventory classification
    • Tsai C. Y., Yeh S. W., A multiple objective particle swarm optimization approach for inventory classification International Journal of Production Economics 2008 114 2 656 666
    • (2008) International Journal of Production Economics , vol.114 , Issue.2 , pp. 656-666
    • Tsai, C.Y.1    Yeh, S.W.2
  • 19
  • 21
    • 6344245064 scopus 로고    scopus 로고
    • Discrete particle swarm optimization
    • Onwubolu G. C. Babu B. V. Berlin, Germany Springer
    • Clerc M., Onwubolu G. C., Babu B. V., Discrete particle swarm optimization New Optimization Techniques in Engineering 2004 Berlin, Germany Springer 204 219
    • (2004) New Optimization Techniques in Engineering , pp. 204-219
    • Clerc, M.1
  • 23
    • 0012442549 scopus 로고    scopus 로고
    • Tabu search
    • Du D.-Z. Pardalos P. M. Boston, Mass, USA Kluwer Academic
    • Glover F., Laguna M., Du D.-Z., Pardalos P. M., Tabu search Handbook of Combinatorial Optimization 1998 3 Boston, Mass, USA Kluwer Academic 621 757
    • (1998) Handbook of Combinatorial Optimization , vol.3 , pp. 621-757
    • Glover, F.1    Laguna, M.2
  • 24
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • Sprecher A., Hartmann S., Drexl A., An exact algorithm for project scheduling with multiple modes OR Spektrum 1997 19 3 195 203
    • (1997) OR Spektrum , vol.19 , Issue.3 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 25
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • Hartmann S., Briskorn D., A survey of variants and extensions of the resource-constrained project scheduling problem European Journal of Operational Research 2010 207 1 1 14
    • (2010) European Journal of Operational Research , vol.207 , Issue.1 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 26
    • 70449527542 scopus 로고    scopus 로고
    • Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB
    • Chen R. M., Wu C. L., Wang C. M., Lo S. T., Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB Expert Systems with Applications 2010 37 3 1899 1910
    • (2010) Expert Systems with Applications , vol.37 , Issue.3 , pp. 1899-1910
    • Chen, R.M.1    Wu, C.L.2    Wang, C.M.3    Lo, S.T.4
  • 27
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling problem library
    • PII S0377221796001701
    • Kolisch R., Sprecher A., PSPLIBa project scheduling problem library European Journal of Operational Research 1997 96 1 205 216 (Pubitemid 127415922)
    • (1997) European Journal of Operational Research , vol.96 , Issue.1 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 28
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch R., Sprecher A., Drexl A., Characterization and generation of a general class of resource-constrained project scheduling problems Management Science 1995 41 693 1703
    • (1995) Management Science , vol.41 , pp. 693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 29
    • 79957682368 scopus 로고    scopus 로고
    • A Scatter Search Algorithm for RCPSP with discounted weighted earliness-tardiness costs
    • Khalilzadeh M., Kianfar F., Ranjbar M., A Scatter Search Algorithm for RCPSP with discounted weighted earliness-tardiness costs Life Science Journal 2011 8 2 634 640
    • (2011) Life Science Journal , vol.8 , Issue.2 , pp. 634-640
    • Khalilzadeh, M.1    Kianfar, F.2    Ranjbar, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.