메뉴 건너뛰기




Volumn , Issue , 2010, Pages 442-446

Using Fuzzy-Delphi technique to determine the concession period in BOT projects

Author keywords

BOT; Component; Concession period; Fuzzy delphi technique; Risk management

Indexed keywords

AGGREGATED VALUES; BOT; BOT PROJECT; COMPONENT; CONCESSION PERIOD; DELPHI TECHNIQUE; FUZZY APPROACH; INPUT PARAMETER; RISKS AND UNCERTAINTIES; UNCERTAIN FACTORS;

EID: 78650264454     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICIFE.2010.5609396     Document Type: Conference Paper
Times cited : (16)

References (14)
  • 1
    • 12144277401 scopus 로고    scopus 로고
    • Alternative concession model for build operate transfer contract projects
    • Shen, L. Y., Li, H., and Li, Q. M. (2002). "Alternative concession model for build operate transfer contract projects." J. Constr. Eng. Manage., vol.128 (4) pp. 326-330.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 326-330
    • Shen, L.Y.1    Li, H.2    Li, Q.M.3
  • 2
    • 37249056991 scopus 로고    scopus 로고
    • Automated approach to negotiations of BOT contracts with the consideration of project risk
    • Liou. Fen-May. and Huang. Chih-Pin. (2008). "Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk." J. Constr. Eng. Manage., vol.134 (1), pp. 18-24.
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.1 , pp. 18-24
    • Liou, F.-M.1    Huang, C.-P.2
  • 3
    • 1942457777 scopus 로고    scopus 로고
    • Build-operatetransfer- type procurement in Asian Mega projects
    • Kumaraswamy, M. M., and Morris, D. A. (2002). "Build- operatetransfer- type procurement in Asian Mega projects." J. Constr. Eng. Manage.,vol. 128(2), pp. 93-102.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 93-102
    • Kumaraswamy, M.M.1    Morris, D.A.2
  • 4
    • 0041622910 scopus 로고    scopus 로고
    • The effect of concession period design on completion risk management of BOT projects
    • Ye .S, Tiong .R.L.K, (2003)." The effect of concession period design on completion risk management of BOT projects". j. Construction Management and Economics 21 (5), 471-482.
    • (2003) J. Construction Management and Economics , vol.21 , Issue.5 , pp. 471-482
    • Ye, S.1    Tiong, R.L.K.2
  • 5
    • 12744271519 scopus 로고    scopus 로고
    • Risk concession model for build operate transfer contract projects
    • Shen, L. Y., and Wu, Y. Z. (2005). "Risk concession model for build operate transfer contract projects."J. Constr. Eng. Manage.,vol. 131(2) ,pp.211-220.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.2 , pp. 211-220
    • Shen, L.Y.1    Wu, Y.Z.2
  • 6
    • 36049036883 scopus 로고    scopus 로고
    • A simulation model for optimizing the concession period of public private partnerships schemes
    • Thomas .S. Ng., Xie. J. Z, Cheung., Y. K, and Jefferies. M,. ( 2007). "A simulation model for optimizing the concession period of public private partnerships schemes," International Journal of Project Management., vol. 25, pp. 791-798.
    • (2007) International Journal of Project Management , vol.25 , pp. 791-798
    • Ng., T.S.1    Xie., J.Z.2    Cheung, Y.K.3    Jefferies, M.4
  • 7
    • 34547728279 scopus 로고    scopus 로고
    • A fuzzy simulation model for evaluating the concession items of public private partnership schemes
    • Thomas ,S. Ng., Xie. J. Z, Skitmore. M, and Cheung. Y. K, ( 2007). "A fuzzy simulation model for evaluating the concession items of public private partnership schemes," j. Automation in construction., vol. 17, pp. 22-29.
    • (2007) J. Automation in Construction , vol.17 , pp. 22-29
    • Ng., T.S.1    Xie, J.Z.2    Skitmore, M.3    Cheung, Y.K.4
  • 8
    • 34247222582 scopus 로고    scopus 로고
    • Using bargaining-game theory for negotiating concession period for BOT-type contract
    • Shen, L. Y., Bao, H. j., Wu.y. z.,and Lu, w. s. (2007). "Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract." J. Constr. Eng. Manage.,vol.133(5)pp. 385-392.
    • (2007) J. Constr. Eng. Manage , vol.133 , Issue.5 , pp. 385-392
    • Shen, L.Y.1    Bao, H.J.2    Wu, Y.Z.3    Lu, W.S.4
  • 9
    • 78650258684 scopus 로고    scopus 로고
    • Win-win concession period determination methodology
    • Zhang. Xueqing, (2009). "Win-Win Concession Period Determination Methodology", J. Constr. Eng. Manage., Vol. 135(6), pp550-558.
    • (2009) J. Constr. Eng. Manage , vol.135 , Issue.6 , pp. 550-558
    • Zhang, X.1
  • 11
  • 14
    • 16444375607 scopus 로고
    • Fuzzy weighted averages and implementation of the extension principle
    • Dong.w.m and Wong .f .s (1987). "Fuzzy weighted averages and implementation of the extension principle." j.fuzzy sets and system., vol .21, pp. 183-199.
    • (1987) J.Fuzzy Sets and System , vol.21 , pp. 183-199
    • Dong, W.M.1    Wong, F.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.