메뉴 건너뛰기




Volumn 134, Issue 1, 2008, Pages 18-24

Automated approach to negotiations of BOT contracts with the consideration of project risk

Author keywords

Automation; Build operate transfer; Contracts; Monte Carlo method; Project management; Regression models

Indexed keywords

AUTOMATION; CONTRACTS; MONTE CARLO METHODS; PROJECT MANAGEMENT; REGRESSION ANALYSIS; RISK ASSESSMENT;

EID: 37249056991     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2008)134:1(18)     Document Type: Article
Times cited : (63)

References (23)
  • 1
    • 0029532895 scopus 로고
    • Debt capacity and optimal capital structure for privately financed infrastructure projects
    • Dias, A., Jr., and Ioannou, P. G. (1995). " Debt capacity and optimal capital structure for privately financed infrastructure projects.. " J. Constr. Eng. Manage., 121 (4), 404-414.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 404-414
    • Dias Jr., A.1    Ioannou, P.G.2
  • 2
    • 0001972371 scopus 로고
    • Risk analysis in capital investment
    • Hertz, D. B. (1964). " Risk analysis in capital investment.. " Harvard Bus. Rev., 42, 95-106.
    • (1964) Harvard Bus. Rev. , vol.42 , pp. 95-106
    • Hertz, D.B.1
  • 4
    • 1942457777 scopus 로고    scopus 로고
    • Build-operate-transfer-type procurement in Asian Mega projects
    • Kumaraswamy, M. M., and Morris, D. A. (2002). " Build-operate- transfer-type procurement in Asian Mega projects.. " J. Constr. Eng. Manage., 128 (2), 93-102.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 93-102
    • Kumaraswamy, M.M.1    Morris, D.A.2
  • 5
    • 22144480927 scopus 로고    scopus 로고
    • Critical success factors for PPP/PFI projects in the UK construction industry
    • Li, B., Akintoye, A., Edwards, P. J., and Hardcastle, C. (2005). " Critical success factors for PPP/PFI projects in the UK construction industry.. " Constr. Manage. Econom., 23, 459-471.
    • (2005) Constr. Manage. Econom. , vol.23 , pp. 459-471
    • Li, B.1    Akintoye, A.2    Edwards, P.J.3    Hardcastle, C.4
  • 6
    • 0031147440 scopus 로고    scopus 로고
    • Privatization decision and civil engineering projects
    • Liddle, B. T. (1997). " Privatization decision and civil engineering projects.. " J. Manage. Eng., 13 (3), 73-78.
    • (1997) J. Manage. Eng. , vol.13 , Issue.3 , pp. 73-78
    • Liddle, B.T.1
  • 7
    • 0032630817 scopus 로고    scopus 로고
    • Build operate transfer municipal bridge projects in India
    • Malini, E. (1999). " Build operate transfer municipal bridge projects in India.. " J. Manage. Eng., 15 (4), 51-58.
    • (1999) J. Manage. Eng. , vol.15 , Issue.4 , pp. 51-58
    • Malini, E.1
  • 8
    • 0032695416 scopus 로고    scopus 로고
    • Private sector participation in infrastructure projects: A methodology to analyse viability of BOT
    • Malik, R. (1999). " Private sector participation in infrastructure projects: a methodology to analyse viability of BOT.. " Constr. Manage. Econom., 17, 613-623.
    • (1999) Constr. Manage. Econom. , vol.17 , pp. 613-623
    • Malik, R.1
  • 10
    • 0031121951 scopus 로고    scopus 로고
    • Automated approach to negotiation of BOT contracts
    • Ngee, L., Tiong, R. L. K., and Alum, J. (1997). " Automated approach to negotiation of BOT contracts.. " J. Comput. Civ. Eng., 11 (2), 121-128.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.2 , pp. 121-128
    • Ngee, L.1    Tiong, R.L.K.2    Alum, J.3
  • 13
    • 0345371036 scopus 로고
    • Risk analysis in investment appraisal
    • Savvakis, C. S. (1994). " Risk analysis in investment appraisal.. " Proj. Appraisal J., 9 (1), 3-18.
    • (1994) Proj. Appraisal J. , vol.9 , Issue.1 , pp. 3-18
    • Savvakis, C.S.1
  • 14
    • 13944255097 scopus 로고    scopus 로고
    • Case study: Izmit domestic and industrial water supply build-operate-transfer project
    • Senturk, H. A., Yazici, G., and Kaplanoglu, S. B. (2004). " Case study: Izmit domestic and industrial water supply build-operate-transfer project.. " J. Constr. Eng. Manage., 130 (3), 449-454.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.3 , pp. 449-454
    • Senturk, H.A.1    Yazici, G.2    Kaplanoglu, S.B.3
  • 15
    • 12144277401 scopus 로고    scopus 로고
    • Alternative concession model for build/operate/transfer contract projects
    • Shen, L. Y., Li, H., and Li, Q. M. (2002). " Alternative concession model for build/operate/transfer contract projects.. " J. Constr. Eng. Manage., 128 (4), 326-330.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 326-330
    • Shen, L.Y.1    Li, H.2    Li, Q.M.3
  • 16
    • 12744271519 scopus 로고    scopus 로고
    • Risk concession model for build/operate/transfer contract projects
    • Shen, L. Y., and Wu, Y. Z. (2005). " Risk concession model for build/operate/transfer contract projects.. " J. Constr. Eng. Manage., 131 (2), 211-220.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.2 , pp. 211-220
    • Shen, L.Y.1    Wu, Y.Z.2
  • 17
    • 0000592836 scopus 로고
    • BOT projects: Risks and securities
    • Tiong, R. L. K. (1990). " BOT projects: Risks and securities.. " Constr. Manage. Econom., 8, 315-328.
    • (1990) Constr. Manage. Econom. , vol.8 , pp. 315-328
    • Tiong, R.L.K.1
  • 18
    • 0029361064 scopus 로고
    • Competitive advantage of equity in BOT tender
    • Tiong, R. L. K. (1995a). " Competitive advantage of equity in BOT tender.. " J. Constr. Eng. Manage., 121 (3), 282-289.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 282-289
    • Tiong, R.L.K.1
  • 19
    • 0029361061 scopus 로고
    • Impact of financial package versus technical solution in a BOT tender
    • Tiong, R. L. K. (1995b). " Impact of financial package versus technical solution in a BOT tender.. " J. Constr. Eng. Manage., 121 (3), 304-311.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 304-311
    • Tiong, R.L.K.1
  • 20
    • 85001576951 scopus 로고    scopus 로고
    • CSFs in competitive tendering and negotiation model for BOT projects
    • Tiong, R. L. K. (1996). " CSFs in competitive tendering and negotiation model for BOT projects.. " J. Constr. Eng. Manage., 122 (3), 205-211.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.3 , pp. 205-211
    • Tiong, R.L.K.1
  • 21
    • 0002528013 scopus 로고    scopus 로고
    • Final negotiation in competitive BOT tender
    • Tiong, R. L. K., and Alum, J. (1997). " Final negotiation in competitive BOT tender.. " J. Constr. Eng. Manage., 123 (1), 6-10.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 6-10
    • Tiong, R.L.K.1    Alum, J.2
  • 23
    • 33846060774 scopus 로고    scopus 로고
    • Wittwer, J. W. (2004). " Monte Carlo simulation basics.. " Vertex 42.com, 〈 http://vertex42.com/ExcelArticles/mc/MonteCarloSimulation. html 〉 (Jun. 1, 2004).
    • (2004) Monte Carlo Simulation Basics
    • Wittwer, J.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.