Systemic risk assessment: A case study
-
Ackermann, F., Eden, C., Williams, T. and Howick, S. (2007) Systemic risk assessment: A case study. Journal of the Operational Research Society, 58, pp. 39-51.
-
(2007)
Journal of the Operational Research Society
, vol.58
, pp. 39-51
-
-
Ackermann, F.1
Eden, C.2
Williams, T.3
Howick, S.4
-
3
-
-
24944495550
-
Managing owner's risk of contractor default
-
Al-Sobiei, O. S., Arditi, D. and Polat, G. (2005) Managing owner's risk of contractor default. ASCE Journal of Construction Engineering and Management, 131:9, pp. 973-978.
-
(2005)
ASCE Journal of Construction Engineering and Management
, vol.131
, Issue.9
, pp. 973-978
-
-
Al-Sobiei, O.S.1
Arditi, D.2
Polat, G.3
-
5
-
-
84992974815
-
Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling
-
Chritamara, S., Ogunlana, S. O. and Bach, N. L. (2001) Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling. Engineering, Construction and Architectural Management, 8:56, pp. 381-392.
-
(2001)
Engineering, Construction and Architectural Management
, vol.8
, Issue.56
, pp. 381-392
-
-
Chritamara, S.1
Ogunlana, S.O.2
Bach, N.L.3
-
6
-
-
84992974814
-
System dynamics modeling of design and build construction projects
-
Chritamara, S., Ogunlana, S. O. and Bach, N. L. (2002) System dynamics modeling of design and build construction projects. Construction Innovation, 2:4, pp. 269-295.
-
(2002)
Construction Innovation
, vol.2
, Issue.4
, pp. 269-295
-
-
Chritamara, S.1
Ogunlana, S.O.2
Bach, N.L.3
-
9
-
-
16444375607
-
Fuzzy weighted averages and implementation of the extension principle
-
Dong, W. and Wong, F. (1987) Fuzzy weighted averages and implementation of the extension principle. Fuzzy Sets and Systems, 211, pp. 83-199.
-
(1987)
Fuzzy Sets and Systems
, vol.211
, pp. 83-199
-
-
Dong, W.1
Wong, F.2
-
10
-
-
0033888428
-
The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects
-
Eden, C., Williams, T., Ackermann, F. and Howick, S. (2000) The role of feedback dynamics in disruption and delay on the nature of disruption and delay (D&D) in major projects. Journal of the Operational Research Society, 51, pp. 291-300.
-
(2000)
Journal of the Operational Research Society
, vol.51
, pp. 291-300
-
-
Eden, C.1
Williams, T.2
Ackermann, F.3
Howick, S.4
-
12
-
-
0002132859
-
Dynamic modeling of product development processes
-
Ford, D. and Sterman, D. (1998) Dynamic modeling of product development processes. System Dynamics Review, 14, pp. 31-68.
-
(1998)
System Dynamics Review
, vol.14
, pp. 31-68
-
-
Ford, D.1
Sterman, D.2
-
13
-
-
13944265622
-
Managing constructability reviews to reduce highway project durations
-
Ford, D., Anderson, S. and Darmon, J. (2004) Managing constructability reviews to reduce highway project durations. ASCE Journal of Construction Engineering and Management, 130, pp. 33-42.
-
(2004)
ASCE Journal of Construction Engineering and Management
, vol.130
, pp. 33-42
-
-
Ford, D.1
Anderson, S.2
Darmon, J.3
-
14
-
-
3943069302
-
Achieving multiple project objectives through contingency management
-
Ford, D. N. (2002) Achieving multiple project objectives through contingency management. ASCE Journal of Construction Engineering and Management, 128:1, pp. 30-39.
-
(2002)
ASCE Journal of Construction Engineering and Management
, vol.128
, Issue.1
, pp. 30-39
-
-
Ford, D.N.1
-
16
-
-
0001203149
-
A parametric representation of fuzzy numbers and their arithmetic operators
-
Giachetti, R. and Young, R. (1997) A parametric representation of fuzzy numbers and their arithmetic operators. Fuzzy Sets and Systems, 91, pp. 185-202.
-
(1997)
Fuzzy Sets and Systems
, vol.91
, pp. 185-202
-
-
Giachetti, R.1
Young, R.2
-
17
-
-
0034830442
-
The impact of disruption and delay when compressing large projects: Going for incentives
-
Howick, S. and Eden, C. (2001) The impact of disruption and delay when compressing large projects: Going for incentives. Journal of the Operational Research Society, 52, pp. 26-34.
-
(2001)
Journal of the Operational Research Society
, vol.52
, pp. 26-34
-
-
Howick, S.1
Eden, C.2
-
19
-
-
0037201114
-
Application of system dynamics and fuzzy logic to forecasting of municipal solid waste
-
Karavezyris, V., Timpe, K. and Marzi, R. (2002) Application of system dynamics and fuzzy logic to forecasting of municipal solid waste. Mathematics and Computers in Simulation, 60, pp. 149-158.
-
(2002)
Mathematics and Computers in Simulation
, vol.60
, pp. 149-158
-
-
Karavezyris, V.1
Timpe, K.2
Marzi, R.3
-
23
-
-
25444435990
-
Quality and change management model for large scale concurrent design and construction projects
-
Lee, S., Pena-Mora, F. and Park, M. (2005) Quality and change management model for large scale concurrent design and construction projects. ASCE Journal of Construction Engineering and Management, 131:8, pp. 890-902.
-
(2005)
ASCE Journal of Construction Engineering and Management
, vol.131
, Issue.8
, pp. 890-902
-
-
Lee, S.1
Pena-Mora, F.2
Park, M.3
-
24
-
-
34248586649
-
Contractors' opportunistic bidding behavior and equilibrium price level in the construction market
-
Lo, W., Lin, L. and Yan, R. (2007) Contractors' opportunistic bidding behavior and equilibrium price level in the construction market. ASCE Journal of Construction Engineering and Management, 133:6, pp. 409-416.
-
(2007)
ASCE Journal of Construction Engineering and Management
, vol.133
, Issue.6
, pp. 409-416
-
-
Lo, W.1
Lin, L.2
Yan, R.3
-
25
-
-
0343826814
-
Using risk analysis to determine construction project contingencies
-
Mak, S. and Picken, D. (2000) Using risk analysis to determine construction project contingencies. ASCE Journal of Construction Engineering and Management, 126:2, pp. 130-136.
-
(2000)
ASCE Journal of Construction Engineering and Management
, vol.126
, Issue.2
, pp. 130-136
-
-
Mak, S.1
Picken, D.2
-
26
-
-
0016451032
-
An experiment in linguistic synthesis with a fuzzy logic controller
-
Mamdani, E. H. and Assilian, S. (1975) An experiment in linguistic synthesis with a fuzzy logic controller. International Journal of Man-Machine Studies, 7:1, pp. 1-13.
-
(1975)
International Journal of Man-Machine Studies
, vol.7
, Issue.1
, pp. 1-13
-
-
Mamdani, E.H.1
Assilian, S.2
-
28
-
-
33748796372
-
Stimulating construction innovation in singapore through the national system of innovation
-
Na, L., Ofori, G. and Park, M. (2006) Stimulating construction innovation in singapore through the national system of innovation. ASCE Journal of Construction Engineering and Management, 133:10, pp. 1069-1082.
-
(2006)
ASCE Journal of Construction Engineering and Management
, vol.133
, Issue.10
, pp. 1069-1082
-
-
Na, L.1
Ofori, G.2
Park, M.3
-
29
-
-
49249131832
-
Dynamic risk analysis in construction projects
-
Nasirzadeh, F., Afshar, A. and Khanzadi, M. (2008) Dynamic risk analysis in construction projects. Canadian Journal of Civil Engineering, 35, pp. 820-831.
-
(2008)
Canadian Journal of Civil Engineering
, vol.35
, pp. 820-831
-
-
Nasirzadeh, F.1
Afshar, A.2
Khanzadi, M.3
-
30
-
-
13944250288
-
System dynamics approach to exploring performance enhancement in a construction organization
-
Ogunlana, S., Li, H. and Sukera, F. A. (2003) System dynamics approach to exploring performance enhancement in a construction organization. ASCE Journal of Construction Engineering and Management, 129, pp. 528-536.
-
(2003)
ASCE Journal of Construction Engineering and Management
, vol.129
, pp. 528-536
-
-
Ogunlana, S.1
Li, H.2
Sukera, F.A.3
-
31
-
-
0027805069
-
Pricing construction risks: Fuzzy set application
-
Paek, J. H., Lee, Y. W. and Ock, J. H. (1993) Pricing construction risks: Fuzzy set application. ASCE Journal of Construction Engineering and Management, 119:4, pp. 743-756.
-
(1993)
ASCE Journal of Construction Engineering and Management
, vol.119
, Issue.4
, pp. 743-756
-
-
Paek, J.H.1
Lee, Y.W.2
Ock, J.H.3
-
32
-
-
0142025004
-
Dynamic change management for construction
-
Park, M. and Pena-Mora, F. (2003) Dynamic change management for construction. System Dynamics Review, 19:3, pp. 213-242.
-
(2003)
System Dynamics Review
, vol.19
, Issue.3
, pp. 213-242
-
-
Park, M.1
Pena-Mora, F.2
-
33
-
-
17244362051
-
Dynamic planning and control methodology for design/build fast track construction projects
-
Pena-Mora, F. and Li, M. (2001) Dynamic planning and control methodology for design/build fast track construction projects. ASCE Journal of Construction Engineering and Management, 127:1, pp. 1-17.
-
(2001)
ASCE Journal of Construction Engineering and Management
, vol.127
, Issue.1
, pp. 1-17
-
-
Pena-Mora, F.1
Li, M.2
-
36
-
-
0036532643
-
Comparison of fuzzy and crisp systems via system dynamics simulation
-
Polat, S. and Bozdag, C. E. (2002) Comparison of fuzzy and crisp systems via system dynamics simulation. European Journal of Operational Research, 138, pp. 178-190.
-
(2002)
European Journal of Operational Research
, vol.138
, pp. 178-190
-
-
Polat, S.1
Bozdag, C.E.2
-
37
-
-
33947408713
-
Fuzzy numbers in cost range estimating
-
Shaheen, A., Fayek, A. and AbouRizk, S. (2007) Fuzzy numbers in cost range estimating. ASCE Journal of Construction Engineering and Management, 133:4, pp. 325-334.
-
(2007)
ASCE Journal of Construction Engineering and Management
, vol.133
, Issue.4
, pp. 325-334
-
-
Shaheen, A.1
Fayek, A.2
AbouRizk, S.3
-
40
-
-
0008563034
-
NPV at risk method in infrastructure project investment evaluation
-
Ye, S. and Tiong, L. (2000) NPV at risk method in infrastructure project investment evaluation. ASCE Journal of Construction Engineering and Management, 126:3, pp. 227-233.
-
(2000)
ASCE Journal of Construction Engineering and Management
, vol.126
, Issue.3
, pp. 227-233
-
-
Ye, S.1
Tiong, L.2
-
42
-
-
0003791192
-
-
4th edn, Kluwer Academic Publishers, Boston, Drodrecht and London
-
Zimmermann, H. J. (2001) Fuzzy Set Theory and its Application, 4th edn, Kluwer Academic Publishers, Boston, Drodrecht and London
-
(2001)
Fuzzy Set Theory and Its Application
-
-
Zimmermann, H.J.1
|