메뉴 건너뛰기




Volumn 59, Issue 1, 2012, Pages 52-64

Managing risks in just-in-sequence supply networks: Exploratory evidence from automakers

Author keywords

Automotive; case study research; just in sequence (JIS); supply chain risk; supply networks (SNs)

Indexed keywords

AUTOMOTIVE; BUYER-SUPPLIER RELATIONSHIPS; COST PRESSURES; GERMANY; JUST-IN-SEQUENCE (JIS); OUTSOURCE; RISK EXPOSURE; SHORT REACTION TIME; SUPPLY CHAIN RISK; SUPPLY NETWORKS; TIGHTLY-COUPLED; TIME DEPENDENCY; VALUE CREATION;

EID: 84856486159     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2010.2087762     Document Type: Article
Times cited : (42)

References (70)
  • 2
    • 0034259462 scopus 로고    scopus 로고
    • Coopetition in business networks-to cooperate and compete simultaneously
    • Sep.
    • M. Bengston and S. Kock, "Coopetition in business networks-To cooperate and compete simultaneously," Ind. Marketing Manage., vol. 29, no. 5, pp. 411-426, Sep. 2000.
    • (2000) Ind. Marketing Manage. , vol.29 , Issue.5 , pp. 411-426
    • Bengston, M.1    Kock, S.2
  • 3
    • 84856459525 scopus 로고    scopus 로고
    • Toyota stockpiles parts as precaution
    • April 27
    • L. Chappell and D. Sedgwick, "Toyota stockpiles parts as precaution," Automotive News, April 27, 2009.
    • (2009) Automotive News
    • Chappell, L.1    Sedgwick, D.2
  • 4
    • 0035342309 scopus 로고    scopus 로고
    • Supply networks and complex adaptive systems: Control versus emergence
    • DOI 10.1016/S0272-6963(00)00068-1, PII S0272696300000681
    • T. Y. Choi, K. J. Dooley, and M. Rungtusanatham, "Supply networks and complex adaptive systems: Control versus emergence," J. Oper. Manage., vol. 19, no. 3, pp. 351-366, May 2001. (Pubitemid 32284804)
    • (2001) Journal of Operations Management , vol.19 , Issue.3 , pp. 351-366
    • Choi, T.Y.1    Dooley, K.J.2    Rungtusanatham, M.3
  • 5
    • 0036722585 scopus 로고    scopus 로고
    • Unveiling the structure of supply networks: Case studies in Honda, Acura, and DaimlerChrysler
    • DOI 10.1016/S0272-6963(02)00025-6, PII S0272696302000256
    • T. Y. Choi and Y. Hong, "Unveiling the structure of supply networks: Case studies in Honda, Acura and Daimler Chrysler," J. Oper. Manage., vol. 20, no. 5, pp. 469-493, Sep. 2002. (Pubitemid 34813932)
    • (2002) Journal of Operations Management , vol.20 , Issue.5 , pp. 469-493
    • Choi, T.Y.1    Hong, Y.2
  • 6
    • 53149153565 scopus 로고    scopus 로고
    • Structural embeddedness and supplier management: A network perspective
    • Sep.
    • T. Y. Choi and Y. Kim, "Structural embeddedness and supplier management: A network perspective," J. Supply Chain Manage., vol. 44, no. 4, pp. 5-13, Sep. 2008.
    • (2008) J. Supply Chain Manage. , vol.44 , Issue.4 , pp. 5-13
    • Choi, T.Y.1    Kim, Y.2
  • 7
    • 33747891996 scopus 로고    scopus 로고
    • The supply base and its complexity: Implications for transaction costs, risks, responsiveness, and innovation
    • DOI 10.1016/j.jom.2005.07.002, PII S0272696305001233
    • T. Y. Choi and D. R. Krause, "The supply base and its complexity: Implications for transaction costs, risks, responsiveness, and innovation," J. Oper. Manage., vol. 24, no. 5, pp. 637-652, Sep. 2006. (Pubitemid 44291858)
    • (2006) Journal of Operations Management , vol.24 , Issue.5 , pp. 637-652
    • Choi, T.Y.1    Krause, D.R.2
  • 8
    • 0036563774 scopus 로고    scopus 로고
    • Supplier-supplier relationships and their implications for buyer-supplier relationships
    • DOI 10.1109/TEM.2002.1010880, PII S0018939102051310
    • T. Y. Choi, Z. Wu, L. M. Ellram, and B. R. Koka, "Supplier-supplier relationships and their implications for buyer-supplier relationships," IEEE Trans. Eng. Manage., vol. 49, no. 2, pp. 119-130, May 2002. (Pubitemid 34798799)
    • (2002) IEEE Transactions on Engineering Management , vol.49 , Issue.2 , pp. 119-130
    • Choi, T.Y.1    Wu, Z.2    Ellram, L.3    Koka, B.R.4
  • 9
    • 2442545456 scopus 로고    scopus 로고
    • The impact of justintime implementation and ISO 9000 certification on total quality management
    • May
    • L. P. Dreyfus, S. L. Ahire, and M. Ebrahimpour, "The impact of justintime implementation and ISO 9000 certification on total quality management," IEEE Trans. Eng. Manage., vol. 51, no. 2, pp. 125-141, May 2004.
    • (2004) IEEE Trans. Eng. Manage. , vol.51 , Issue.2 , pp. 125-141
    • Dreyfus, L.P.1    Ahire, S.L.2    Ebrahimpour, M.3
  • 10
    • 0001073758 scopus 로고
    • Building theories from case study research
    • Oct.
    • K. Eisenhardt, "Building theories from case study research," Acad. Manage. Rev., vol. 14, no. 4, pp. 532-550, Oct. 1989.
    • (1989) Acad. Manage. Rev. , vol.14 , Issue.4 , pp. 532-550
    • Eisenhardt, K.1
  • 11
    • 0032648150 scopus 로고    scopus 로고
    • The impact of product variety on automobile assembly operations: Empirical evidence and simulation analysis
    • Jun.
    • M. L. Fisher and C. D. Ittner, "The impact of product variety on automobile assembly operations: Empirical evidence and simulation analysis," Manage. Sci., vol. 45, no. 6, pp. 771-786, Jun. 1999.
    • (1999) Manage. Sci. , vol.45 , Issue.6 , pp. 771-786
    • Fisher, M.L.1    Ittner, C.D.2
  • 12
    • 0026137976 scopus 로고
    • The just-in-time philosophy: A literature review
    • Apr.
    • D. Y. Golhar and C. L. Stamm, "The just-in-time philosophy: A literature review," Int. J. Prod. Res., vol. 29, no. 4, pp. 657-676, Apr. 1991.
    • (1991) Int. J. Prod. Res. , vol.29 , Issue.4 , pp. 657-676
    • Golhar, D.Y.1    Stamm, C.L.2
  • 13
    • 77952577154 scopus 로고    scopus 로고
    • Innovative logistics is a vital part of transformable factories in the automotive industry
    • A. I. Dashchenko, Ed. Berlin, Germany: Springer
    • H. Graf, "Innovative logistics is a vital part of transformable factories in the automotive industry," in Reconfigurable Manufacturing Systems and Transformable Factories, A. I. Dashchenko, Ed. Berlin, Germany: Springer, 2007, pp. 423-457.
    • (2007) Reconfigurable Manufacturing Systems and Transformable Factories , pp. 423-457
    • Graf, H.1
  • 14
    • 79960928030 scopus 로고    scopus 로고
    • Daimler Chrysler: Integrated sourcing networks
    • "Daimler Chrysler: Integrierte Beschaffungsnetzwerke, ", in Supply Chain Management erfolgreich umsetzen, D. Corsten and C. Gabriel, Eds., 2nd ed. Berlin, Germany: Springer
    • H. Graf and S. Putzlocher, "Daimler Chrysler: Integrierte Beschaffungsnetzwerke [Daimler Chrysler: Integrated sourcing networks]," in Supply Chain Management erfolgreich umsetzen [Successful implementation of supply chain management], D. Corsten and C. Gabriel, Eds., 2nd ed. Berlin, Germany: Springer, 2004, pp. 55-71.
    • (2004) Successful Implementation of Supply Chain Management , pp. 55-71
    • Graf, H.1    Putzlocher, S.2
  • 16
    • 0011730987 scopus 로고    scopus 로고
    • How should companies interact in business networks?
    • Feb.
    • H. Håkansson and D. Ford, "How should companies interact in business networks?," J. Bus. Res., vol. 55, no. 2, pp. 82-111, Feb. 2002.
    • (2002) J. Bus. Res. , vol.55 , Issue.2 , pp. 82-111
    • Håkansson, H.1    Ford, D.2
  • 17
    • 0027654849 scopus 로고
    • A resource dependence perspective of just-in-time purchasing
    • Sep.
    • R. B. Handfield, "A resource dependence perspective of just-in-time purchasing," J. Oper. Manage., vol. 11, no. 3, pp. 289-311, Sep. 1993.
    • (1993) J. Oper. Manage. , vol.11 , Issue.3 , pp. 289-311
    • Handfield, R.B.1
  • 19
    • 84993043386 scopus 로고    scopus 로고
    • An investigation of the impact of schedule stability on supplier responsiveness
    • A. Harrison, "An investigation of the impact of schedule stability on supplier responsiveness," Int. J. Logistics Manage., vol. 7, no. 1, pp. 83-91.
    • Int. J. Logistics Manage. , vol.7 , Issue.1 , pp. 83-91
    • Harrison, A.1
  • 20
    • 0002537975 scopus 로고
    • How much has really changed between U. S. automakers and their suppliers?
    • Summer
    • S. Helper, "How much has really changed between U. S. automakers and their suppliers?," Sloan Manage. Rev., vol. 32, no. 4, pp. 15-28, Summer 1991.
    • (1991) Sloan Manage. Rev. , vol.32 , Issue.4 , pp. 15-28
    • Helper, S.1
  • 21
    • 0000402203 scopus 로고    scopus 로고
    • Creating value through mutual commitment to business network relationships
    • D. B. Holm, K. Eriksson, and J. Johanson, "Creating value through mutual commitment to business network relationships," Strateg. Manage. J. vol. 20, no. 5, pp. 467-486.
    • Strateg. Manage. J. , vol.20 , Issue.5 , pp. 467-486
    • Holm, D.B.1    Eriksson, K.2    Johanson, J.3
  • 22
    • 79960148042 scopus 로고    scopus 로고
    • The evolution of competition in the automotive industry
    • G. C. Parry and A. P. Graves, Eds. London, U. K: Springer
    • M. Holweg, "The evolution of competition in the automotive industry," in Build To Order-The Road to the 5-Day Car, G. C. Parry and A. P. Graves, Eds. London, U. K: Springer, 2008, pp. 13-34.
    • (2008) Build to Order-the Road to the 5-Day Car , pp. 13-34
    • Holweg, M.1
  • 24
    • 33748585960 scopus 로고    scopus 로고
    • Automotive supplier parks: An imperative for build-to-order?
    • DOI 10.1016/j.pursup.2006.05.001, PII S1478409206000537
    • M. Howard, J. Miemczyk, and A. Graves, "Automotive supplier parks: An imperative for build-to-order?," J. Purch. Supply Manage., vol. 12, no. 1, pp. 91-104, Mar. 2006. (Pubitemid 44375517)
    • (2006) Journal of Purchasing and Supply Management , vol.12 , Issue.2 , pp. 91-104
    • Howard, M.1    Miemczyk, J.2    Graves, A.3
  • 25
    • 70350736163 scopus 로고    scopus 로고
    • Further motivation for continuous improvement in just-in-time logistics
    • Nov.
    • K.-T. Hung, Y. K. Ro, and J. K. Liker, "Further motivation for continuous improvement in just-in-time logistics," IEEE Trans. Eng. Manage., vol. 56, no. 4, pp. 571-583, Nov. 2009.
    • (2009) IEEE Trans. Eng. Manage. , vol.56 , Issue.4 , pp. 571-583
    • Hung, K.-T.1    Ro, Y.K.2    Liker, J.K.3
  • 27
    • 0242269872 scopus 로고    scopus 로고
    • Designing production systems for quality: Research opportunities from an automotive industry perspective
    • Jan.
    • R. R. Inman, D. E. Blumenfeld, N. Huang, and J. Li, "Designing production systems for quality: Research opportunities from an automotive industry perspective," Int. J. Prod. Res., vol. 41, no. 9, pp. 1953-1971, Jan. 2003.
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.9 , pp. 1953-1971
    • Inman, R.R.1    Blumenfeld, D.E.2    Huang, N.3    Li, J.4
  • 29
    • 84856492336 scopus 로고    scopus 로고
    • "Nutzenpotentiale und Benefit von JIT-/JIS-Konzepten, ", Working Paper, Stuttgart: Fraunhofer Institute for Manufacturing Engineering and Automation
    • T. Junghanns, "Nutzenpotentiale und Benefit von JIT-/JIS-Konzepten [Potential and benefits of JIS/JIT concepts]," Working Paper Stuttgart: Fraunhofer Institute for Manufacturing Engineering and Automation, 2004.
    • (2004) Potential and Benefits of JIS/JIT Concepts
    • Junghanns, T.1
  • 30
    • 21344488688 scopus 로고
    • Total effectiveness in a just-in-time system
    • C. Karlsson and C. Norr, "Total effectiveness in a just-in-time system," Int. J. Oper. Prod. Manage., vol. 14, no. 3, pp. 46-65, 1994.
    • (1994) Int. J. Oper. Prod. Manage. , vol.14 , Issue.3 , pp. 46-65
    • Karlsson, C.1    Norr, C.2
  • 31
    • 84928415527 scopus 로고    scopus 로고
    • Managing risk in global supply chains
    • H. Gatignon, J. R. Kimberly, and R. E. Gunther, Eds. Cambridge, MA: Cambridge University Press
    • P. R. Kleindorfer and L. N. van Wassenhove, "Managing risk in global supply chains," in The INSEAD-Wharton Alliance on Globalizing, H. Gatignon, J. R. Kimberly, and R. E. Gunther, Eds. Cambridge, MA: Cambridge University Press, 2004, pp. 288-305.
    • (2004) The INSEAD-wharton Alliance on Globalizing , pp. 288-305
    • Kleindorfer, P.R.1    Van Wassenhove, L.N.2
  • 32
    • 0038606800 scopus 로고    scopus 로고
    • GM creates flexible assembly line at its Ellesmere Port plant in the UK
    • A. Kochan, "GM creates flexible assembly line at its Ellesmere Port plant in the UK," Assembly Autom., vol. 23, no. 1, pp. 32-35, 2003.
    • (2003) Assembly Autom. , vol.23 , Issue.1 , pp. 32-35
    • Kochan, A.1
  • 33
    • 0036922669 scopus 로고    scopus 로고
    • The development and regional significance of the automotive industry: Supplier parks in western Europe
    • A. Larsson, "The development and regional significance of the automotive industry: Supplier parks in Western Europe," Int. J. Urban Reg. Res., vol. 7, no. 4, pp. 767-784, Dec. 2002. (Pubitemid 36049157)
    • (2002) International Journal of Urban and Regional Research , vol.26 , Issue.4 , pp. 767-784
    • Larsson, A.1
  • 34
    • 67651053180 scopus 로고    scopus 로고
    • Triads in services outsourcing: Bridge, bridge decay and bridge transfer
    • Jul.
    • M. Li and T. Y. Choi, "Triads in services outsourcing: Bridge, bridge decay and bridge transfer," J. Supply Chain Manage., vol. 45, no. 3, pp. 27-39, Jul. 2009.
    • (2009) J. Supply Chain Manage. , vol.45 , Issue.3 , pp. 27-39
    • Li, M.1    Choi, T.Y.2
  • 35
    • 0032667962 scopus 로고    scopus 로고
    • Inventory reduction and productivity growth: Linkages in the Japanese automotive industry
    • Apr.
    • M. B. Lieberman and L. Demeester, "Inventory reduction and productivity growth: Linkages in the Japanese automotive industry," Manage. Sci., vol. 45, no. 4, pp. 466-485, Apr. 1999.
    • (1999) Manage. Sci. , vol.45 , Issue.4 , pp. 466-485
    • Lieberman, M.B.1    Demeester, L.2
  • 36
    • 10444245890 scopus 로고    scopus 로고
    • Building deep supplier relationships
    • Dec.
    • J. K. Liker and T. Y. Choi, "Building deep supplier relationships," Harvard Bus. Rev., vol. 82, no. 12, pp. 104-113, Dec. 2004.
    • (2004) Harvard Bus. Rev. , vol.82 , Issue.12 , pp. 104-113
    • Liker, J.K.1    Choi, T.Y.2
  • 37
    • 0027654507 scopus 로고
    • Conducting case study research in operations management
    • Sep.
    • D. McCutcheon and J. Meridith, "Conducting case study research in operations management," J. Oper. Manage., vol. 11, no. 3, pp. 239-256, Sep. 1993.
    • (1993) J. Oper. Manage. , vol.11 , Issue.3 , pp. 239-256
    • McCutcheon, D.1    Meridith, J.2
  • 38
    • 17444400924 scopus 로고    scopus 로고
    • Supply chain planning in the German automotive industry
    • DOI 10.1007/s00291-004-0168-4
    • H. Meyr, "Supply chain planning in the German automotive industry," OR Spectr., vol. 26, no. 4, pp. 447-470, Oct. 2004. (Pubitemid 40549753)
    • (2004) OR Spectrum , vol.26 , Issue.4 , pp. 447-470
    • Meyr, H.1
  • 40
    • 33845288614 scopus 로고    scopus 로고
    • Supplier development: Improving supplier performance through knowledge transfer
    • DOI 10.1016/j.jom.2006.02.001, PII S0272696306000040
    • S. B. Modi and V. A. Mabert, "Supplier development: Improving supplier performance through knowledge transfer," J. Oper. Manage., vol. 25, no. 1, pp. 42-64, Jan. 2007. (Pubitemid 44880525)
    • (2007) Journal of Operations Management , vol.25 , Issue.1 , pp. 42-64
    • Modi, S.B.1    Mabert, V.A.2
  • 42
    • 33846303587 scopus 로고    scopus 로고
    • BMW creates production "triangle" in the UK to manufacture the new Mini
    • DOI 10.1108/01439910710718414, Food industry
    • J. Mortimer, "BMW creates production "triangle" in the UK to manufacture the new mini," Ind. Robot Int. J., vol. 34, no. 1, pp. 26-31, 2007. (Pubitemid 46122563)
    • (2007) Industrial Robot , vol.34 , Issue.1 , pp. 26-31
    • Mortimer, J.1
  • 43
    • 79952768059 scopus 로고    scopus 로고
    • Measuring information distortion in real-world supply chains
    • DOI: 10.1080/00207541003796814, in press
    • T. T. Niranjan, S. M. Wagner, and V. Aggarwal, "Measuring information distortion in real-world supply chains," Int. J. Prod. Res., vol. 49, DOI: 10.1080/00207541003796814, in press, 2011.
    • (2011) Int. J. Prod. Res. , vol.49
    • Niranjan, T.T.1    Wagner, S.M.2    Aggarwal, V.3
  • 46
    • 0002130054 scopus 로고
    • Human factors in the implementation of just-in-time production
    • N. Oliver, "Human factors in the implementation of just-in-time production," Int. J. Oper. Prod. Manage., vol. 10, no. 4, pp. 32-40, 1990.
    • (1990) Int. J. Oper. Prod. Manage. , vol.10 , Issue.4 , pp. 32-40
    • Oliver, N.1
  • 47
    • 36249001680 scopus 로고    scopus 로고
    • On the evolutionary dynamics of supply network topologies
    • DOI 10.1109/TEM.2007.906856
    • S. D. Pathak, D. M. Dilts, and G. Biswas, "On the evolutionary dynamics of supply network topologies," IEEE Trans. Eng. Manage., vol. 54, no. 4, pp. 662-672, Nov. 2007. (Pubitemid 350123902)
    • (2007) IEEE Transactions on Engineering Management , vol.54 , Issue.4 , pp. 662-672
    • Pathak, S.D.1    Dilts, D.M.2    Biswas, G.3
  • 48
    • 8644278723 scopus 로고    scopus 로고
    • Linking product variety to order-fulfillment strategies
    • DOI 10.1287/inte.1040.0092
    • F. K. Pil and M. Holweg, "Linking product variety to order-fulfillment strategies," Interfaces, vol. 34, no. 5, pp. 394-403, Sep.-Oct. 2004. (Pubitemid 39508306)
    • (2004) Interfaces , vol.34 , Issue.5 , pp. 394-403
    • Pil, F.K.1    Holweg, M.2
  • 50
    • 2042532637 scopus 로고    scopus 로고
    • Supplier development at Honda, Nissan and Toyota: Comparative case studies of organizational capability enhancement
    • M. Sako, "Supplier development at Honda, Nissan and Toyota: Comparative case studies of organizational capability enhancement," Ind. Corp. Change, vol. 13, no. 2, pp. 281-308, Apr. 2004. (Pubitemid 38536839)
    • (2004) Industrial and Corporate Change , vol.13 , Issue.2 , pp. 281-308
    • Sako, M.1
  • 51
    • 34250190647 scopus 로고    scopus 로고
    • Extended multi-customer supplier parks in the automotive industry
    • DOI 10.1016/j.cirp.2007.05.114, PII S0007850607001151
    • W. Sihn and K. Schmitz, "Extended multi-customer supplier parks in the automotive industry," CIRP Ann. Manuf. Tech., vol. 56, no. 1, pp. 479-482, 2007. (Pubitemid 46898343)
    • (2007) CIRP Annals - Manufacturing Technology , vol.56 , Issue.1 , pp. 479-482
    • Sihn, W.1    Schmitz, K.2
  • 52
    • 0017557653 scopus 로고
    • Toyota production system and kanban system. materialization of just-in-time and respect-for-human system
    • Y. Sugimori, K. Kusunoki, F. Cho, and S. Uchikawa, "Toyota production system and kanban system materialization of just-in-time and respect-forhuman system," Int. J. Prod. Res., vol. 15, no. 6, pp. 553-564, 1977. (Pubitemid 8573924)
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 53
    • 27844555685 scopus 로고    scopus 로고
    • A typology of vulnerability scenarios towards suppliers and customers in supply chains based upon perceived time and relationship dependencies
    • G. Svensson, "A typology of vulnerability scenarios towards suppliers and customers in supply chains based upon perceived time and relationship dependencies," Int. J. Phys. Distrib. Logist. Manage., vol. 32, no. 3, pp. 168-187, 2002.
    • (2002) Int. J. Phys. Distrib. Logist. Manage. , vol.32 , Issue.3 , pp. 168-187
    • Svensson, G.1
  • 54
    • 34247096377 scopus 로고    scopus 로고
    • Key areas, causes and contingency planning of corporate vulnerability in supply chains: A qualitative approach
    • G. Svensson, "Key areas, causes and contingency planning of corporate vulnerability in supply chains: A qualitative approach," Int. J. Phys. Distrib. Logist. Manage., vol. 34, no. 9, pp. 728-748, 2004.
    • (2004) Int. J. Phys. Distrib. Logist. Manage. , vol.34 , Issue.9 , pp. 728-748
    • Svensson, G.1
  • 55
    • 8644240244 scopus 로고    scopus 로고
    • Vulnerability in business relationships: The gap between dependence and trust
    • DOI 10.1108/08858620410564418
    • G. Svensson, "Vulnerability in business relationships: The gap between dependence and trust," J. Busi. Ind. Mark., vol. 19, no. 7, pp. 469-483, 2004. (Pubitemid 39499365)
    • (2004) Journal of Business and Industrial Marketing , vol.19 , Issue.7 , pp. 469-483
    • Svensson, G.1
  • 56
    • 33745813950 scopus 로고    scopus 로고
    • Perspectives in supply chain risk management
    • DOI 10.1016/j.ijpe.2005.12.006, PII S0925527306000405
    • C. S. Tang, "Perspectives in supply chain risk management," Int. J. Prod. Econ., vol. 103, no. 2, pp. 451-488, Oct. 2006. (Pubitemid 44038496)
    • (2006) International Journal of Production Economics , vol.103 , Issue.2 , pp. 451-488
    • Tang, C.S.1
  • 57
    • 79952597453 scopus 로고    scopus 로고
    • A conceptual framework and empirical results of the risk and potential of just-in-sequence-A study of the German automotive industry
    • J. H. Thun, R. P. Marble, and V. Silveira-Camargos, "A conceptual framework and empirical results of the risk and potential of just-in-sequence-A study of the German automotive industry," J. Oper. Logist., vol. 1, no. 2, pp. 1-13, 2007.
    • (2007) J. Oper. Logist. , vol.1 , Issue.2 , pp. 1-13
    • Thun, J.H.1    Marble, R.P.2    Silveira-Camargos, V.3
  • 58
    • 84856447373 scopus 로고
    • Daimler-Benz-Keiper-Recaro-Zusammenarbeit am Standort Bremen
    • Oct. 15
    • W. Ulsamer, "Daimler-Benz-Keiper-Recaro-Zusammenarbeit am Standort Bremen [Daimler-Benz-Keiper-Recaro-Collaboration at the Bremen production site]," Handelsblatt, no. 198, p. 23, Oct. 15, 1986.
    • (1986) Handelsblatt , Issue.198 , pp. 23
    • Ulsamer, W.1
  • 59
    • 0035252557 scopus 로고    scopus 로고
    • Rediscovery of postponement a literature review and directions for research
    • DOI 10.1016/S0272-6963(00)00057-7
    • R. I. van Hoek, "The rediscovery of postponement A literature review and directions for research," J. Oper. Manage., vol. 19, no. 2, pp. 161-184, Feb. 2001. (Pubitemid 32130379)
    • (2001) Journal of Operations Management , vol.19 , Issue.2 , pp. 161-184
    • Van Hoek, R.I.1
  • 60
    • 84856492337 scopus 로고    scopus 로고
    • VDA, Standard belieferungsformen der Logistik in der Automobilindustrie, Frankfurt: German Association of the Automotive Industry VDA
    • VDA, Standard belieferungsformen der Logistik in der Automobilindustrie [Standard delivery forms in automotive logistics]. Frankfurt: German Association of the Automotive Industry (VDA), 2008.
    • (2008) Standard Delivery Forms in Automotive Logistics
  • 61
  • 62
    • 34247108678 scopus 로고    scopus 로고
    • An empirical investigation into supply chain vulnerability
    • Dec.
    • S. M. Wagner and C. Bode, "An empirical investigation into supply chain vulnerability," J. Purch. Supply Manage., vol. 12, no. 6, pp. 301-312, Dec. 2006.
    • (2006) J. Purch. Supply Manage. , vol.12 , Issue.6 , pp. 301-312
    • Wagner, S.M.1    Bode, C.2
  • 63
    • 67349280311 scopus 로고    scopus 로고
    • Supplier default dependencies: Empirical evidence from the automotive industry
    • Nov.
    • S. M. Wagner, C. Bode, and P. Koziol, "Supplier default dependencies: Empirical evidence from the automotive industry," Eur. J. Oper. Res., vol. 199, no. 1, pp. 150-161, Nov. 2009.
    • (2009) Eur. J. Oper. Res. , vol.199 , Issue.1 , pp. 150-161
    • Wagner, S.M.1    Bode, C.2    Koziol, P.3
  • 64
    • 80051761115 scopus 로고    scopus 로고
    • Decision model for the application of just-in-sequence
    • DOI: 10.1080/00207543.2010.505216, in press
    • S. M. Wagner and V. Silveira-Camargos, "Decision model for the application of just-in-sequence," Int. J. Prod. Res., vol. 49, DOI: 10.1080/00207543.2010.505216, in press, 2011.
    • (2011) Int. J. Prod. Res. , vol.49
    • Wagner, S.M.1    Silveira-Camargos, V.2
  • 65
    • 77957983462 scopus 로고    scopus 로고
    • Organizing for high reliability: Processes of collective mindfulness
    • A. Boin Ed. Thousand Oaks, CA: Sage Publications
    • K. E. Weick, K. M. Sutcliffe, and D. Obstfeld, "Organizing for high reliability: Processes of collective mindfulness," in Crisis Management, A. Boin Ed. Thousand Oaks, CA: Sage Publications, 2008, pp. 31-66.
    • (2008) Crisis Management , pp. 31-66
    • Weick, K.E.1    Sutcliffe, K.M.2    Obstfeld, D.3
  • 66
    • 0037323568 scopus 로고    scopus 로고
    • Just-in-sequence material supply-A simulation based solution in electronics production
    • Feb.-Apr
    • S. Werner, M. Kellner, E. Schenk, and G. Weigert, "Just-in-sequence material supply-A simulation based solution in electronics production," Robot. Comput.-Integr. Manuf., vol. 19, no. 1/2, pp. 107-111, Feb.-Apr. 2003.
    • (2003) Robot. Comput.-Integr. Manuf. , vol.19 , Issue.1-2 , pp. 107-111
    • Werner, S.1    Kellner, M.2    Schenk, E.3    Weigert, G.4
  • 69
    • 27644439033 scopus 로고    scopus 로고
    • Supplier-supplier relationships in the buyer-supplier triad: Building theories from eight case studies
    • DOI 10.1016/j.jom.2005.02.001, PII S0272696305000768
    • Z. Wu and T. Y. Choi, "Supplier-supplier relationships in the buyer-supplier triad: Building theories from eight case studies," J. Oper. Manage., vol. 24, no. 1, pp. 27-52, Dec. 2005. (Pubitemid 41570131)
    • (2005) Journal of Operations Management , vol.24 , Issue.1 , pp. 27-52
    • Wu, Z.1    Choi, T.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.