-
1
-
-
0031108822
-
Information distortion in a supply chain: The bullwhip effect
-
H. L. Lee, V. Padmanabhan, and S. Whang, "Information distortion in a supply chain: The bullwhip effect," Manage. Sci., vol. 43, pp. 546-558, 1997.
-
(1997)
Manage. Sci
, vol.43
, pp. 546-558
-
-
Lee, H.L.1
Padmanabhan, V.2
Whang, S.3
-
2
-
-
0033872695
-
Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information
-
F. Chen, Z. Drezner, J. K. Ryan, and D. Simchi-Levi, "Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information," Manage. Sci., vol. 46, pp. 436-443, 2000.
-
(2000)
Manage. Sci
, vol.46
, pp. 436-443
-
-
Chen, F.1
Drezner, Z.2
Ryan, J.K.3
Simchi-Levi, D.4
-
3
-
-
0242364629
-
The impacts of sharing production information on supply chain dynamics: A review of the literature
-
G. Q. Huang, J. S. K. Lau, and K. L.Mak, "The impacts of sharing production information on supply chain dynamics: A review of the literature," Int. J. Prod. Res., vol. 41, pp. 1483-1517, 2003.
-
(2003)
Int. J. Prod. Res
, vol.41
, pp. 1483-1517
-
-
Huang, G.Q.1
Lau, J.S.K.2
Mak, K.L.3
-
4
-
-
0037449229
-
Measuring and avoiding the bullwhip effect: A control theoretic approach
-
J. Dejonckheere, S. M. Disney,M. R. Lambrecht, and D. R. Towill, "Measuring and avoiding the bullwhip effect: A control theoretic approach," Eur. J. Oper. Res., vol. 147, pp. 567-590, 2003.
-
(2003)
Eur. J. Oper. Res
, vol.147
, pp. 567-590
-
-
Dejonckheere, J.1
Disney, S.M.2
Lambrecht, M.R.3
Towill, D.R.4
-
5
-
-
0242406689
-
The impact of information enrichment on the bullwhip effect in supply chains: A control engineering perspective
-
J. Dejonckheere, S. Disney, M. Lambrecht, and D. Towill, "The impact of information enrichment on the bullwhip effect in supply chains: A control engineering perspective," Eur. J. Oper. Res., vol. 153, pp. 727-750, 2004.
-
(2004)
Eur. J. Oper. Res
, vol.153
, pp. 727-750
-
-
Dejonckheere, J.1
Disney, S.2
Lambrecht, M.3
Towill, D.4
-
6
-
-
70350707724
-
Record recalls plague automakers, in
-
M. Truby, "Record recalls plague automakers," in Detroit News, 2000.
-
(2000)
Detroit News
-
-
Truby, M.1
-
7
-
-
33748257247
-
Motor vehicle recalls: Trends, patterns and emerging issues
-
H. Bates, M. Holweg, M. Lewis, and N. Oliver, "Motor vehicle recalls: Trends, patterns and emerging issues," Omega, vol. 35, no. 2, pp. 202-210, 2007.
-
(2007)
Omega
, vol.35
, Issue.2
, pp. 202-210
-
-
Bates, H.1
Holweg, M.2
Lewis, M.3
Oliver, N.4
-
8
-
-
70350733596
-
-
May 10, CPSC, Canon USA, Inc, announce recall of fax machines. Release, 01-152 [Online
-
U.S. Consumer Product Safety Commission. (2001, May 10). CPSC, Canon USA, Inc., announce recall of fax machines. Release # 01-152 [Online]. Available: http://www.cpsc.gov/cpscpub/prerel/prhtml01/01152.html
-
(2001)
Available
-
-
-
9
-
-
70350736075
-
Apple recall deepens Sony battery crisis, in
-
K. Allison, "Apple recall deepens Sony battery crisis," in Financial Times, 2006.
-
(2006)
Financial Times
-
-
Allison, K.1
-
10
-
-
0036761808
-
Experimental economics and supply-chain management
-
R. Croson and K. Donohue, "Experimental economics and supply-chain management," Interfaces, vol. 32, pp. 74-82, 2003.
-
(2003)
Interfaces
, vol.32
, pp. 74-82
-
-
Croson, R.1
Donohue, K.2
-
11
-
-
0032074056
-
The stabilizing effect of inventory in supply chains
-
M. P. Baganha and M. A. Cohen, "The stabilizing effect of inventory in supply chains," Oper. Res., vol. 46, pp. 72-83, 1998.
-
(1998)
Oper. Res
, vol.46
, pp. 72-83
-
-
Baganha, M.P.1
Cohen, M.A.2
-
12
-
-
24144490035
-
Global supply chain network dynamics with multicriteria decision-making under risk and uncertainty
-
A. Nagurney and D. Matsypura, "Global supply chain network dynamics with multicriteria decision-making under risk and uncertainty," Transp. Res. E, vol. 41, pp. 585-612, 2005.
-
(2005)
Transp. Res. E
, vol.41
, pp. 585-612
-
-
Nagurney, A.1
Matsypura, D.2
-
13
-
-
21844524246
-
Safety stocks in JIT environments
-
R. Natarajan and S. K. Goyal, "Safety stocks in JIT environments," Int. J. Oper. Prod. Manage., vol. 14, no. 10, pp. 64-71, 1994.
-
(1994)
Int. J. Oper. Prod. Manage
, vol.14
, Issue.10
, pp. 64-71
-
-
Natarajan, R.1
Goyal, S.K.2
-
14
-
-
84985855354
-
Vendor performance and alternative manufacturing environments
-
W. C. Benton and L. Krajewski, "Vendor performance and alternative manufacturing environments," Decis. Sci., vol. 21, no. 2, pp. 403-415, 1990.
-
(1990)
Decis. Sci
, vol.21
, Issue.2
, pp. 403-415
-
-
Benton, W.C.1
Krajewski, L.2
-
15
-
-
0001082017
-
Inventories and the volatility of production
-
J. Kahn, "Inventories and the volatility of production," Amer. Econ. Rev., vol. 77, pp. 667-679, 1987.
-
(1987)
Amer. Econ. Rev
, vol.77
, pp. 667-679
-
-
Kahn, J.1
-
16
-
-
0028317506
-
Quality control through lot sizing for items sold with warranty
-
I. Djamaludin, D. N. P. Murthy, and R. J.Wilson, "Quality control through lot sizing for items sold with warranty," Int. J. Prod. Econ., vol. 33, pp. 97-107, 1994.
-
(1994)
Int. J. Prod. Econ
, vol.33
, pp. 97-107
-
-
Djamaludin, I.1
Murthy, D.N.P.2
Wilson, R.J.3
-
17
-
-
0028698197
-
Economic production lot size model with variable production rate and imperfect quality
-
M. Khouja and A. Mehres, "Economic production lot size model with variable production rate and imperfect quality," J. Oper. Res. Soc. vol. 45, pp. 1405-1417, 1994.
-
(1994)
J. Oper. Res. Soc
, vol.45
, pp. 1405-1417
-
-
Khouja, M.1
Mehres, A.2
-
18
-
-
0035155610
-
The production performance benefits from JIT implementation
-
R. R. Fullerton and C. S. McWatters, "The production performance benefits from JIT implementation," J. Oper. Manage., vol. 19, pp. 81-96, 2001.
-
(2001)
J. Oper. Manage
, vol.19
, pp. 81-96
-
-
Fullerton, R.R.1
McWatters, C.S.2
-
19
-
-
0002543768
-
A critique of the literature on justin-time manufacturing
-
S. K. Goyal and S. G. Deshmukh, "A critique of the literature on justin-time manufacturing," Int. J. Oper. Prod. Manage., vol. 12, pp. 18-28, 1992.
-
(1992)
Int. J. Oper. Prod. Manage
, vol.12
, pp. 18-28
-
-
Goyal, S.K.1
Deshmukh, S.G.2
-
20
-
-
0032140165
-
Adoption of just-intime manufacturing methods at US- and Japanese-owned plants: Some empirical evidence
-
Aug
-
M. Nakamura, S. Sakakibara, and R. Schroeder, "Adoption of just-intime manufacturing methods at US- and Japanese-owned plants: Some empirical evidence," IEEE Trans. Eng. Manag., vol. 45, no. 3, pp. 230-240, Aug. 1998.
-
(1998)
IEEE Trans. Eng. Manag
, vol.45
, Issue.3
, pp. 230-240
-
-
Nakamura, M.1
Sakakibara, S.2
Schroeder, R.3
-
21
-
-
0010823471
-
A study of JIT implementation techniques using the analytic hierarchy process model
-
D. M. Norris, "A study of JIT implementation techniques using the analytic hierarchy process model," Prod. Inventory Manage. J., vol. 3, pp. 49-53, 1992.
-
(1992)
Prod. Inventory Manage. J
, vol.3
, pp. 49-53
-
-
Norris, D.M.1
-
22
-
-
0025699535
-
Analysis of a JIT implementation at Dover Corporation
-
D. Orth, R. Hybil, and D. Korzan, "Analysis of a JIT implementation at Dover Corporation," Prod. Inventory Manage. J., vol. 31, pp. 79-82, 1990.
-
(1990)
Prod. Inventory Manage. J
, vol.31
, pp. 79-82
-
-
Orth, D.1
Hybil, R.2
Korzan, D.3
-
23
-
-
0042525728
-
Just-in-time purchasing: An empirical investigation
-
D. Y. Golhar, C. L. Stamm, and S. Banerjee, "Just-in-time purchasing: An empirical investigation," Prod. Plan. Control, vol. 4, pp. 392-401, 1993.
-
(1993)
Prod. Plan. Control
, vol.4
, pp. 392-401
-
-
Golhar, D.Y.1
Stamm, C.L.2
Banerjee, S.3
-
24
-
-
21144475699
-
Financial justification of JIT implementation
-
R. A. Inman and S. Mehra, "Financial justification of JIT implementation," Int. J. Oper. Prod. Manage., vol. 13, pp. 32-39, 1993.
-
(1993)
Int. J. Oper. Prod. Manage
, vol.13
, pp. 32-39
-
-
Inman, R.A.1
Mehra, S.2
-
25
-
-
84865090523
-
Japanese automakers, U.S. suppliers and supply-chain superiority
-
Rev
-
J. K. Liker and Y.-C. Wu, "Japanese automakers, U.S. suppliers and supply-chain superiority," Sloan Manage. Rev., vol. 42, pp. 81-93, 2000.
-
(2000)
Sloan Manage
, vol.42
, pp. 81-93
-
-
Liker, J.K.1
Wu, Y.-C.2
-
26
-
-
84974873088
-
An optimal batch size for a production system operation under a fixed-quantity, periodic delivery policy
-
B. R. Sarker and G. R. Parija, "An optimal batch size for a production system operation under a fixed-quantity, periodic delivery policy," J. Oper. Res. Soc., vol. 45, pp. 891-900, 1994.
-
(1994)
J. Oper. Res. Soc
, vol.45
, pp. 891-900
-
-
Sarker, B.R.1
Parija, G.R.2
-
27
-
-
8344220512
-
An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy: Logistics: From theory to application
-
S.Wang and B. Sarker, "An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy: Logistics: From theory to application," Eur. J. Oper. Res., vol. 162, pp. 153-172, 2005.
-
(2005)
Eur. J. Oper. Res
, vol.162
, pp. 153-172
-
-
Wang, S.1
Sarker, B.2
-
28
-
-
25144483929
-
Routing for a just-in-time supply pickup and delivery system
-
K. Chuah and J. Yingling, "Routing for a just-in-time supply pickup and delivery system," Transp. Sci., vol. 39, pp. 328-339, 2005.
-
(2005)
Transp. Sci
, vol.39
, pp. 328-339
-
-
Chuah, K.1
Yingling, J.2
-
29
-
-
0037061513
-
An optimal batch size for a JIT manufacturing system
-
L. Khan and R. Sarker, "An optimal batch size for a JIT manufacturing system," Comput. Ind. Eng., vol. 42, pp. 127-136, 2002.
-
(2002)
Comput. Ind. Eng
, vol.42
, pp. 127-136
-
-
Khan, L.1
Sarker, R.2
-
31
-
-
70350704781
-
-
Y. Monden, Toyota Production System: An Integrated Approach to Just-In-Time. Norcross, GA: Eng. Manage. Press, 1998.
-
Y. Monden, Toyota Production System: An Integrated Approach to Just-In-Time. Norcross, GA: Eng. Manage. Press, 1998.
-
-
-
-
33
-
-
34247606891
-
Monitoring the improvement of an overall industrial performance based on a Choquet integral aggregation
-
L. Berrah, G. Mauris, and J. Montmain, "Monitoring the improvement of an overall industrial performance based on a Choquet integral aggregation," Omega, vol. 36, pp. 340-351, 2008.
-
(2008)
Omega
, vol.36
, pp. 340-351
-
-
Berrah, L.1
Mauris, G.2
Montmain, J.3
-
35
-
-
0000627087
-
Interlocking directorates: A strategy for reducing environmental uncertainty
-
R. D. Shoorman, M. H. Bazerman, and R. S. Atkin, "Interlocking directorates: A strategy for reducing environmental uncertainty," Acad. Manage. Rev., vol. 6, pp. 243-251, 1981.
-
(1981)
Acad. Manage. Rev
, vol.6
, pp. 243-251
-
-
Shoorman, R.D.1
Bazerman, M.H.2
Atkin, R.S.3
-
36
-
-
0036837161
-
The role of performance measures and incentive systems in relation to the degree of JIT implementation
-
R. R. Fullerton and C. S. McWatters, "The role of performance measures and incentive systems in relation to the degree of JIT implementation," Account. Org. Soc., vol. 27, pp. 711-735, 2002.
-
(2002)
Account. Org. Soc
, vol.27
, pp. 711-735
-
-
Fullerton, R.R.1
McWatters, C.S.2
-
37
-
-
0037804616
-
An examination of the relationships between JIT and financial performance
-
R. R. Fullerton, C. S. McWatters, and C. Fawson, "An examination of the relationships between JIT and financial performance," J. Oper. Manage., vol. 21, pp. 383-404, 2003.
-
(2003)
J. Oper. Manage
, vol.21
, pp. 383-404
-
-
Fullerton, R.R.1
McWatters, C.S.2
Fawson, C.3
-
38
-
-
0024108191
-
Economic design of x-control charts under Weibull shockmodels
-
P. K. Banerjee and M. A. Rahim, "Economic design of x-control charts under Weibull shockmodels," Technometrics, vol. 30, pp. 407-414, 1988.
-
(1988)
Technometrics
, vol.30
, pp. 407-414
-
-
Banerjee, P.K.1
Rahim, M.A.2
-
39
-
-
0001284087
-
Economic control chart designs and the in-control time distribution: A sensitivity study
-
T. P. McWilliams, "Economic control chart designs and the in-control time distribution: A sensitivity study," J. Qual. Technol., vol. 21, pp. 103-151, 1989.
-
(1989)
J. Qual. Technol
, vol.21
, pp. 103-151
-
-
McWilliams, T.P.1
|