Change orders impact on labor productivity

Author keywords

Change orders; Claims; Computer software; Construction industry; Dispute resolution; Neural networks; Productivity

Indexed keywords

CHANGE ORDERS; CLAIMS; DISPUTE RESOLUTION; LABOR PRODUCTIVITY;

EID: 14544291592     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:3(354)     Document Type: Article
Times cited : (112)

References (22)
  • 1
    • 0010137511 scopus 로고    scopus 로고
    • A neural network model for quantifying the impact of change orders on construction productivity
    • Concordia Univ., Montreal
    • Abdo, D. (1999). "A neural network model for quantifying the impact of change orders on construction productivity." M. Eng. Major Technical Rep., Concordia Univ., Montreal.
    • (1999) M. Eng. Major Technical Rep.
    • Abdo, D.1
  • 2
    • 14544273062 scopus 로고
    • Practical project control
    • AACE, Skills and Knowledge of Cost Engineers, Section 4.6, San Diego
    • American Association of Cost Engineers (AACE) Education Board. (1989). "Practical project control." Proc., 33rd Annual Meeting, AACE, Skills and Knowledge of Cost Engineers, Section 4.6, San Diego.
    • (1989) Proc., 33rd Annual Meeting
  • 7
    • 5844315957 scopus 로고
    • Impact costs: What are they and how to quantify them
    • PMI
    • Brunies, R. (1988). "Impact costs: What are they and how to quantify them." Proc., PMI Seminar/Symposium, PMI, 386-393.
    • (1988) Proc., PMI Seminar/Symposium , pp. 386-393
    • Brunies, R.1
  • 8
    • 0031373121 scopus 로고    scopus 로고
    • Effect of change orders on labor productivity
    • ASCE, Reston, Va.
    • Coffman, G. (1997). "Effect of change orders on labor productivity." Proc., 5th Construction Congress V, ASCE, Reston, Va., 141-148.
    • (1997) Proc., 5th Construction Congress V , pp. 141-148
    • Coffman, G.1
  • 9
    • 0032656251 scopus 로고    scopus 로고
    • Impact of change orders on labor efficiency for mechanical construction
    • Hanna, A., Russel, J., Gotzion, T., and Nordheim, E. (1999a). "Impact of change orders on labor efficiency for mechanical construction." J. Constr. Eng. Manage., 125(3), 176-184.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 176-184
    • Hanna, A.1    Russel, J.2    Gotzion, T.3    Nordheim, E.4
  • 10
    • 0032659199 scopus 로고    scopus 로고
    • Impact of change orders on labor efficiency for electrical construction
    • Hanna, A., Russel, J., Nordheim, E., and Bruggink, M. (1999b). "Impact of change orders on labor efficiency for electrical construction." J. Constr. Eng. Manage., 125(4), 224-232.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 224-232
    • Hanna, A.1    Russel, J.2    Nordheim, E.3    Bruggink, M.4
  • 11
    • 0004652780 scopus 로고    scopus 로고
    • Quantitative impacts of project change: Size issues
    • Ibbs, C. (1997). "Quantitative impacts of project change: Size issues." J. Constr. Eng. Manage., 123(3), 308-311.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 308-311
    • Ibbs, C.1
  • 12
    • 11344268966 scopus 로고
    • Quantitative effects of project change
    • Construction Industry Institute, Austin, Tex.
    • Ibbs, C., and Allen, W. (1995). "Quantitative effects of project change." Source Document 108, Construction Industry Institute, Austin, Tex.
    • (1995) Source Document 108
    • Ibbs, C.1    Allen, W.2
  • 14
    • 0031631834 scopus 로고    scopus 로고
    • Estimating the cost of change orders
    • EST.06.1-EST.06.5
    • Moselhi, O. (1998). "Estimating the cost of change orders." Trans. Am. Assn. Cost. Eng., EST.06.1-EST.06.5.
    • (1998) Trans. Am. Assn. Cost. Eng.
    • Moselhi, O.1
  • 15
    • 0026173825 scopus 로고
    • Impact of change orders on construction productivity
    • Moselhi, O., Charles, L., and Fazio, P. (1991a). "Impact of change orders on construction productivity." Can. J. Civ. Eng., 18(4), 484-492.
    • (1991) Can. J. Civ. Eng. , vol.18 , Issue.4 , pp. 484-492
    • Moselhi, O.1    Charles, L.2    Fazio, P.3
  • 16
    • 0026381932 scopus 로고
    • Neural networks as tools in construction
    • Moselhi, O., Hegazy, T., and Fazio, P. (1991b). "Neural networks as tools in construction." J. Constr. Eng. Manage., 117(4), 606-625.
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.4 , pp. 606-625
    • Moselhi, O.1    Hegazy, T.2    Fazio, P.3
  • 17
    • 14544289367 scopus 로고
    • Rate of manpower consumption in electrical construction
    • NECA, Washington, D.C.
    • National Electrical Contractors Association (NECA). (1983). "Rate of manpower consumption in electrical construction." Rep., NECA, Washington, D.C.
    • (1983) Rep.
  • 18
    • 0003737888 scopus 로고    scopus 로고
    • NeuroShell2. Ward Systems Group, Md.
    • NeuroShell2. (1996). "NeuroShell2 user's manual." Ward Systems Group, Md.
    • (1996) NeuroShell2 User's Manual
  • 19
    • 14544301720 scopus 로고
    • Impact costs
    • Carswell Co. Ltd.
    • Revay, S. (1985). "Impact costs." Construction Law Reports, Carswell Co. Ltd., 11, pp. 15-26.
    • (1985) Construction Law Reports , vol.11 , pp. 15-26
    • Revay, S.1
  • 21
    • 0029361062 scopus 로고
    • Quantitative effects of construction changes on labor productivity
    • Thomas, R., and Napolitan, C. (1995). "Quantitative effects of construction changes on labor productivity." J. Constr. Eng. Manage., 121(3), 290-296.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 290-296
    • Thomas, R.1    Napolitan, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.