메뉴 건너뛰기




Volumn 135, Issue 6, 2009, Pages 550-558

Win-win concession period determination methodology

Author keywords

Build Operate Transfer; Financial management; Infrastructure; Monte Carlo method; Partnerships; Risk management; Simulation

Indexed keywords

BUILD/OPERATE/TRANSFER; FINANCIAL MANAGEMENTS; INFRASTRUCTURE; MONTE CARLO; PARTNERSHIPS; SIMULATION;

EID: 78650258684     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000012     Document Type: Article
Times cited : (84)

References (21)
  • 1
    • 0001090515 scopus 로고
    • The behavior of the firm under regulatory constraint
    • Averch, H., and Johnson, L. (1962). " The behavior of the firm under regulatory constraint.." Am. Econ. Rev., 52, 1053-1069.
    • (1962) Am. Econ. Rev. , vol.52 , pp. 1053-1069
    • Averch, H.1    Johnson, L.2
  • 3
    • 0024621566 scopus 로고
    • Range estimating
    • Curran, M. W. (1989). " Range estimating.." Cost Eng., 31 (3), 18-26.
    • (1989) Cost Eng. , vol.31 , Issue.3 , pp. 18-26
    • Curran, M.W.1
  • 4
    • 0035166876 scopus 로고    scopus 로고
    • Least-present-value-of-revenue actions and highway franchising
    • Engel, E., Fisher, R., and Galetovic, A. (2001). " Least-present-value-of-revenue actions and highway franchising.." J. Polit. Econ., 109 (5), 993-1020.
    • (2001) J. Polit. Econ. , vol.109 , Issue.5 , pp. 993-1020
    • Engel, E.1    Fisher, R.2    Galetovic, A.3
  • 7
    • 22144457048 scopus 로고    scopus 로고
    • Assessing the goodness-of-fit of statistical distributions when data are grouped
    • DOI 10.1007/s11004-005-1558-0
    • Haschenburger, J. K., and Spinelli, J. J. (2005). " Assessing the goodness-of-fit of statistical distributions when data are grouped.." Math. Geol., 37 (3), 261-276. (Pubitemid 40974171)
    • (2005) Mathematical Geology , vol.37 , Issue.3 , pp. 261-276
    • Haschenburger, J.K.1    Spinelli, J.J.2
  • 11
    • 81855204790 scopus 로고    scopus 로고
    • New Hong Kong Tunnel Company Ltd.. Hong Kong
    • New Hong Kong Tunnel Company Ltd. (2006). Annual Rep. 2005, Hong Kong.
    • (2006) Annual Re 2005
  • 12
    • 81855196830 scopus 로고    scopus 로고
    • New Hong Kong Tunnel Company Ltd.. Hong Kong
    • New Hong Kong Tunnel Company Ltd. (2007). Annual Rep. 2006, Hong Kong.
    • (2007) Annual Re 2006
  • 13
    • 79959929325 scopus 로고    scopus 로고
    • Toll hike ignites call for government to take control
    • Ng, D. (2005). " Toll hike ignites call for government to take control.." The Standard, 〈 http://www.thestandard.com.hk/news-detail. asp?pp-cat=&art-id=7381&sid=&con-type=1&d
    • (2005) The Standard
    • Ng, D.1
  • 14
    • 0003898887 scopus 로고    scopus 로고
    • Project Management Institute., Project Management Institute, Newtown Square, Pa
    • Project Management Institute. (2000). A guide to the project management body of knowledge, Project Management Institute, Newtown Square, Pa.
    • (2000) A Guide to the Project Management Body of Knowledge
  • 16
    • 81855175752 scopus 로고    scopus 로고
    • Treasury Taskforce (Private Finance).. "," Technical Note No. 5, London
    • Treasury Taskforce (Private Finance). (2000). " How to construct a public sector comparator.," Technical Note No. 5, London.
    • (2000) How to Construct A Public Sector Comparator
  • 18
    • 81855215874 scopus 로고    scopus 로고
    • Western Harbor Tunnel Company Ltd, LC Paper No. CB(1)533/07-08(02), Hong Kong
    • Western Harbor Tunnel Company Ltd. (2007). " Company's background brief.." LC Paper No. CB(1)533/07-08(02), Hong Kong.
    • (2007) Company's Background Brief
  • 19
    • 0041622910 scopus 로고    scopus 로고
    • The effect of concession period design on completion risk management of BOT projects
    • DOI 10.1080/0144619032000073488
    • Ye, S. D., and Tiong, R. L. K. (2003). " The effect of concession period design on completion risk management of BOT projects.." Constr. Manage. Econom., 21 (5), 471-482. (Pubitemid 36967870)
    • (2003) Construction Management and Economics , vol.21 , Issue.5 , pp. 471-482
    • Ye, S.1    Tiong, R.L.K.2
  • 20
    • 20444441426 scopus 로고    scopus 로고
    • Financial viability analysis and capital structure optimization in privatized infrastructure projects
    • Zhang, X. Q. (2005). " Financial viability analysis and capital structure optimization in privatized infrastructure projects.." J. Constr. Eng. Manage., 131 (6), 656-668.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.6 , pp. 656-668
    • Zhang, X.Q.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.