메뉴 건너뛰기




Volumn , Issue , 2011, Pages

Resource allocation in multi-project environments: Planning vs. execution strategies

Author keywords

[No Author keywords available]

Indexed keywords

EXECUTION PHASE; EXECUTION STRATEGIES; MULTI-PROJECT ENVIRONMENT; PLANNING STAGES; POTENTIAL RISKS; PROJECT PORTFOLIO; REALISTIC ENVIRONMENTS; RESOURCE ALLOCATION STRATEGIES; RESOURCE UTILIZATIONS; SIMULATION TOOL; TEST RESOURCE ALLOCATION;

EID: 80053353535     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (10)

References (34)
  • 5
    • 64049095849 scopus 로고    scopus 로고
    • Critical chain and risk analysis applied to high-risk industry maintenance: A case study
    • Bevilacqua, M., Ciarapica, F.E. and Giacchetta, G. (2009) Critical chain and risk analysis applied to high-risk industry maintenance: A case study, International Journal of Project Management, (27:4), pp. 419-432.
    • (2009) International Journal of Project Management , vol.27 , Issue.4 , pp. 419-432
    • Bevilacqua, M.1    Ciarapica, F.E.2    Giacchetta, G.3
  • 6
    • 29744446411 scopus 로고    scopus 로고
    • Optimal resource allocation for projects
    • Carbno, C. (1999). Optimal Resource Allocation for Projects. Project Management Journal, (30:2), pp. 22-31.
    • (1999) Project Management Journal , vol.30 , Issue.2 , pp. 22-31
    • Carbno, C.1
  • 7
    • 32644440855 scopus 로고    scopus 로고
    • Multi-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives
    • Cohen, I., Mandelbaum, A., and Shtub, A. (2004). Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some Alternatives. Project Management Journal, (45:2), pp. 39-50.
    • (2004) Project Management Journal , vol.45 , Issue.2 , pp. 39-50
    • Cohen, I.1    Mandelbaum, A.2    Shtub, A.3
  • 9
    • 0042622452 scopus 로고    scopus 로고
    • The resource allocation syndrome: The prime challenge of multi-project management?
    • DOI 10.1016/S0263-7863(02)00113-8
    • Engwall, M. and Jerbrant, A. (2003). The resource allocation syndrome: the prime challenge in multi-project management? International Journal of Project Management, (21:6), pp. 403-409. (Pubitemid 36941638)
    • (2003) International Journal of Project Management , vol.21 , Issue.6 , pp. 403-409
    • Engwall, M.1    Jerbrant, A.2
  • 11
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
    • Herroelen, W. and Leus, R. (2005) Project scheduling under uncertainty: Survey and research potentials, European Journal of Operational Research, (165), pp. 289-306. (Pubitemid 40206362)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 12
    • 1542422015 scopus 로고    scopus 로고
    • Critical chain project scheduling: Do not oversimplify
    • Herroelen, W., Leus, R. and E. Demeulemeester, (2002) Critical Chain Project Scheduling: Do Not Oversimplify, Project Management Journal, (33:4), pp. 48-60.
    • (2002) Project Management Journal , vol.33 , Issue.4 , pp. 48-60
    • Herroelen, W.1    Leus, R.2    Demeulemeester, E.3
  • 13
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • DOI 10.1016/S0272-6963(01)00054-7, PII S0272696301000547
    • Herroelen, W., and Leus, R. (2001) On the Merits and Pitfalls of Critical Chain Scheduling, Journal of Operations Management, (19), pp. 559-577. (Pubitemid 32780488)
    • (2001) Journal of Operations Management , vol.19 , Issue.5 , pp. 559-577
    • Herroelen, W.1    Leus, R.2
  • 15
    • 0002645824 scopus 로고    scopus 로고
    • Critical chain project management improves project performance
    • Leach, L.P., (1999) Critical Chain Project Management Improves Project Performance, Project Management Journal, (30:2), pp. 39-51.
    • (1999) Project Management Journal , vol.30 , Issue.2 , pp. 39-51
    • Leach, L.P.1
  • 16
    • 32644453240 scopus 로고    scopus 로고
    • Critical chain: A new project management paradigm or old wine in new bottles?
    • Lechler, T. and Ronen, B. and Stohr, E.A., (2005a). Critical Chain: A New Project Management Paradigm or Old Wine in New Bottles? Engineering Management Journal, (17:4), pp. 45-58. (Pubitemid 43245207)
    • (2005) EMJ - Engineering Management Journal , vol.17 , Issue.4 , pp. 45-58
    • Lechler, T.G.1    Ronen, B.2    Stohr, E.A.3
  • 17
    • 80053380013 scopus 로고    scopus 로고
    • Final report: NASA strategic multi-project resource management 'CC-lite'
    • Phase 1
    • Lechler, T., Ronen, B., and Stohr, E.A., (2005b). Final Report: NASA Strategic Multi-project Resource Management 'CC-Lite'. NASA CPMR Project Report, Phase 1.
    • (2005) NASA CPMR Project Report
    • Lechler, T.1    Ronen, B.2    Stohr, E.A.3
  • 18
    • 84907706854 scopus 로고    scopus 로고
    • Dynamic resource allocation with finite buffer constraint in broadband OFDMA networks
    • WCNC 2003
    • Li, G. and Liu, H. (2003) Dynamic resource allocation with finite buffer constraint in broadband OFDMA networks, Wireless Communications and Networking, WCNC 2003, pp. 1037 - 1042.
    • (2003) Wireless Communications and Networking , pp. 1037-1042
    • Li, G.1    Liu, H.2
  • 19
    • 0030110490 scopus 로고    scopus 로고
    • Optimal wire sizing and buffer insertion for low power and a generalized delay model
    • Lillis, J., Cheng, C.-K. and Lin, T.-T. Y. (1996) Optimal wire sizing and buffer insertion for low power and a generalized delay model, IEEE Journal of Solid-State Circuits, (31), pp. 437-447.
    • (1996) IEEE Journal of Solid-state Circuits , Issue.31 , pp. 437-447
    • Lillis, J.1    Cheng, C.-K.2    Lin, T.-T.Y.3
  • 20
    • 49349090365 scopus 로고    scopus 로고
    • Fuzzy critical chain method for project scheduling under resource constraints and uncertainty
    • Long, L., and Ohsato, A. (2008). Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management, (26:6), pp. 688-698.
    • (2008) International Journal of Project Management , vol.26 , Issue.6 , pp. 688-698
    • Long, L.1    Ohsato, A.2
  • 24
    • 34547279499 scopus 로고    scopus 로고
    • Transparent prioritisation, budgeting and resource allocation with multi-criteria decision analysis and decision conferencing
    • Phillips L.D., and Bana e Costa, C.A. (2007). Transparent prioritisation, budgeting and resource allocation with multi-criteria decision analysis and decision conferencing, Annals of Operations Research, (154:1), pp. 51-68.
    • (2007) Annals of Operations Research , vol.154 , Issue.1 , pp. 51-68
    • Phillips, L.D.1    Bana, E.2    Costa, C.A.3
  • 26
    • 29144510084 scopus 로고    scopus 로고
    • Adaptive resource allocation in multiuser OFDM systems with proportional rate constraints
    • Shen, Z. Andrews, J.G., and Evans, B.L. (2005) Adaptive resource allocation in multiuser OFDM systems with proportional rate constraints, IEEE transactions on Wireless Communications, (4:6), pp. 2726 - 2737
    • (2005) IEEE Transactions on Wireless Communications , vol.4 , Issue.6 , pp. 2726-2737
    • Shen, Z.1    Andrews, J.G.2    Evans, B.L.3
  • 28
    • 84955154307 scopus 로고    scopus 로고
    • Estimation of project buffers in critical chain project management
    • Shou, Y., and Yeo, K.T. (2000) Estimation of Project Buffers in Critical Chain Project Management, ICMIT, pp. 162-167.
    • (2000) ICMIT , pp. 162-167
    • Shou, Y.1    Yeo, K.T.2
  • 29
    • 80053375890 scopus 로고
    • The role and weaknesses of top management in internal projects
    • G. R. Vienna: Manzsche Verlag
    • Spühler, R., and Biagini, R. (1990). The role and weaknesses of top management in internal Projects. In G. R., Handbook of Management by Projects. Vienna: Manzsche Verlag.
    • (1990) Handbook of Management by Projects
    • Spühler, R.1    Biagini, R.2
  • 30
    • 0035426806 scopus 로고    scopus 로고
    • An investigation into the fundamentals of critical chain project scheduling
    • DOI 10.1016/S0263-7863(00)00026-0, PII S0263786300000260
    • Steyn, H. (2000). An investigation into the fundamentals of critical chain project scheduling. International Journal of Project Management, (19:6), pp. 363-369. (Pubitemid 32646674)
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 363-369
    • Steyn, H.1
  • 32
    • 0039599042 scopus 로고    scopus 로고
    • Manage your projects for success: An application of the theory of constraints
    • Umble, M., and E. Umble, (2000) Manage Your Projects for Success: An Application of the Theory of Constraints, Production and Inventory Management Journal, (41:2), pp. 27-32.
    • (2000) Production and Inventory Management Journal , vol.41 , Issue.2 , pp. 27-32
    • Umble, M.1    Umble, E.2
  • 33
    • 0035922498 scopus 로고    scopus 로고
    • Maximizing the net present value of a project with linear time-dependent cash flows
    • DOI 10.1080/00207540110056919
    • Vanhouke, M., E. Demeulemeester, and W. Herroelen, (2001) Maximizing the Present Value of a Project with Linearly Time-Dependent Cash Flows, International Journal of Production Research, (39:14), pp. 3159-3181. (Pubitemid 35165536)
    • (2001) International Journal of Production Research , vol.39 , Issue.14 , pp. 3159-3181
    • Vanhoucke, M.1    Demeulemeester, E.2    Herroelen, W.3
  • 34
    • 0035440941 scopus 로고    scopus 로고
    • Resource allocation for multimedia streaming over the Internet
    • DOI 10.1109/6046.944477, PII S1520921001078865
    • Zhang, Q., Zhu, W., and Zhang, Y-Q. (2001) Resource allocation for multimedia streaming over the Internet, IEEE Transactions on Multimedia, (3:3), pp. 339 - 355. (Pubitemid 32945790)
    • (2001) IEEE Transactions on Multimedia , vol.3 , Issue.3 , pp. 339-355
    • Zhang, Q.1    Zhu, W.2    Zhang, Y.-Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.