메뉴 건너뛰기




Volumn 29, Issue 8, 2011, Pages 1044-1056

ISO 9000 certification and construction project performance: The Malaysian experience

Author keywords

Construction sector; ISO 9000; Malaysia; Project performance; Project success; Quality management systems

Indexed keywords

CONSTRUCTION SECTORS; ISO-9000; MALAYSIA; PROJECT PERFORMANCE; PROJECT SUCCESS; QUALITY MANAGEMENT SYSTEMS;

EID: 80053052972     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2010.11.001     Document Type: Article
Times cited : (41)

References (73)
  • 1
    • 33847327339 scopus 로고    scopus 로고
    • The significant factors causing delay of building construction projects in Malaysia
    • Alaghbari W., Kadir M.R.A., Salim A.E. The significant factors causing delay of building construction projects in Malaysia. Eng. Const. Arch. Man. 2007, 14(2):192-206.
    • (2007) Eng. Const. Arch. Man. , vol.14 , Issue.2 , pp. 192-206
    • Alaghbari, W.1    Kadir, M.R.A.2    Salim, A.E.3
  • 2
    • 76849099276 scopus 로고    scopus 로고
    • The performance measurement of construction projects managed by ISO-certified contractors in Malaysia
    • Ali A.S., Rahmat I. The performance measurement of construction projects managed by ISO-certified contractors in Malaysia. J. Retail Leis. Prop. 2010, 9(1):25-35.
    • (2010) J. Retail Leis. Prop. , vol.9 , Issue.1 , pp. 25-35
    • Ali, A.S.1    Rahmat, I.2
  • 3
    • 80053051896 scopus 로고    scopus 로고
    • A comparative study of selected measures of performance of organizations before and after obtaining ISO 9000 certification as compared to the S&P 500 Index. Indiana State University, USA: PhD Thesis.
    • Arbuckle, G. K., 2004. A comparative study of selected measures of performance of organizations before and after obtaining ISO 9000 certification as compared to the S&P 500 Index. Indiana State University, USA: PhD Thesis.
    • (2004)
    • Arbuckle, G.K.1
  • 4
    • 0000357545 scopus 로고    scopus 로고
    • Estimating non-response bias in mail surveys
    • Armstrong J.S., Overton T.S. Estimating non-response bias in mail surveys. J. Market. Res. 1997, 14(3):396-402.
    • (1997) J. Market. Res. , vol.14 , Issue.3 , pp. 396-402
    • Armstrong, J.S.1    Overton, T.S.2
  • 5
    • 0242328816 scopus 로고    scopus 로고
    • Contribution of quality management tools and practices to project management performance
    • Barad M., Raz T. Contribution of quality management tools and practices to project management performance. Int. J. Qual. Rel. Mgt. 2000, 17(4/5):571-583.
    • (2000) Int. J. Qual. Rel. Mgt. , vol.17 , Issue.4-5 , pp. 571-583
    • Barad, M.1    Raz, T.2
  • 6
    • 33847246803 scopus 로고    scopus 로고
    • The impacts of acquiring ISO 9000 certification on the performance of SMEs in Tehran
    • Bayati A., Taghavi A. The impacts of acquiring ISO 9000 certification on the performance of SMEs in Tehran. TQM Mag. 2007, 19(2):140-149.
    • (2007) TQM Mag. , vol.19 , Issue.2 , pp. 140-149
    • Bayati, A.1    Taghavi, A.2
  • 7
    • 20744455983 scopus 로고    scopus 로고
    • KPIs: a critical appraisal of their use in construction
    • Beatham S., Anumba C., Thorpe T., Hedges I. KPIs: a critical appraisal of their use in construction. Benchmarking Int. J. 2004, 11(1):93-117.
    • (2004) Benchmarking Int. J. , vol.11 , Issue.1 , pp. 93-117
    • Beatham, S.1    Anumba, C.2    Thorpe, T.3    Hedges, I.4
  • 8
    • 1142295380 scopus 로고    scopus 로고
    • Clients, contractors & consultants: the consequences of organizational fragmentation in contemporary project environment
    • Berggen C., Soderlund C., Anderson C. Clients, contractors & consultants: the consequences of organizational fragmentation in contemporary project environment. Proj. Man. J. 2001, 32(3):39-48.
    • (2001) Proj. Man. J. , vol.32 , Issue.3 , pp. 39-48
    • Berggen, C.1    Soderlund, C.2    Anderson, C.3
  • 9
    • 0033714293 scopus 로고    scopus 로고
    • An analysis of success factors and benefits of partnering in construction
    • Black C., Akintoye A., Fitzgerald E. An analysis of success factors and benefits of partnering in construction. Int. J. Proj. Man. 2000, 18(6):423-434.
    • (2000) Int. J. Proj. Man. , vol.18 , Issue.6 , pp. 423-434
    • Black, C.1    Akintoye, A.2    Fitzgerald, E.3
  • 11
    • 84887279738 scopus 로고    scopus 로고
    • Modelling project management performance
    • Bryde D.J. Modelling project management performance. Int. J. Qual. Rel. Mgt. 2003, 20(2):225-229.
    • (2003) Int. J. Qual. Rel. Mgt. , vol.20 , Issue.2 , pp. 225-229
    • Bryde, D.J.1
  • 12
    • 54949158051 scopus 로고    scopus 로고
    • Perceptions of the impact of project sponsorship practices on project success
    • Bryde D.J. Perceptions of the impact of project sponsorship practices on project success. Int. J. Proj. Man. 2008, 26(8):800-809.
    • (2008) Int. J. Proj. Man. , vol.26 , Issue.8 , pp. 800-809
    • Bryde, D.J.1
  • 13
    • 23744452042 scopus 로고    scopus 로고
    • Key performance indicators for measuring construction success
    • Chan A.P.C., Chan A.P.L. Key performance indicators for measuring construction success. Benchmarking Int. J. 2004, 11(2):203-221.
    • (2004) Benchmarking Int. J. , vol.11 , Issue.2 , pp. 203-221
    • Chan, A.P.C.1    Chan, A.P.L.2
  • 14
    • 6344286273 scopus 로고    scopus 로고
    • Factors affecting the quality of building projects in Hong Kong
    • Chan A.P.C., Tam C.M. Factors affecting the quality of building projects in Hong Kong. Int. J. Qual. Rel. Mgt. 2000, 17(4-5):423-441.
    • (2000) Int. J. Qual. Rel. Mgt. , vol.17 , Issue.4-5 , pp. 423-441
    • Chan, A.P.C.1    Tam, C.M.2
  • 15
    • 14744304180 scopus 로고    scopus 로고
    • ISO 9000 and the U.S. construction industry
    • Chini A.R., Valdez H.E. ISO 9000 and the U.S. construction industry. J. Man. Eng. 2003, 19(2):69-77.
    • (2003) J. Man. Eng. , vol.19 , Issue.2 , pp. 69-77
    • Chini, A.R.1    Valdez, H.E.2
  • 16
    • 27144462887 scopus 로고    scopus 로고
    • Does ISO 9000 certification improve business performance
    • Chow-Chua C., Goh M., Wan T.B. Does ISO 9000 certification improve business performance. Int. J. Qual. Rel. Mgt. 2003, 20(8):936-953.
    • (2003) Int. J. Qual. Rel. Mgt. , vol.20 , Issue.8 , pp. 936-953
    • Chow-Chua, C.1    Goh, M.2    Wan, T.B.3
  • 18
    • 80053052915 scopus 로고    scopus 로고
    • Measuring the value of success in project management organizations. Unpublished DBA dissertation, Graduate School of Argosy University, Orange County, US.
    • Cook, B.W., 2004. Measuring the value of success in project management organizations. Unpublished DBA dissertation, Graduate School of Argosy University, Orange County, US.
    • (2004)
    • Cook, B.W.1
  • 19
    • 33644691133 scopus 로고    scopus 로고
    • Strategic orientation and financial performance of firms implementing ISO 9000
    • Dimara E., Skuras D., Tsekouras K., Goutsos S. Strategic orientation and financial performance of firms implementing ISO 9000. Int. J. Qual. Rel. Mgt. 2004, 21(1):72-89.
    • (2004) Int. J. Qual. Rel. Mgt. , vol.21 , Issue.1 , pp. 72-89
    • Dimara, E.1    Skuras, D.2    Tsekouras, K.3    Goutsos, S.4
  • 20
    • 0442295628 scopus 로고    scopus 로고
    • Evaluating outcomes from ISO 9000-certified quality systems of Hong Kong constructors
    • Dissanayaka S.M., Kumaraswamy M.M., Karim K., Marosszeky M. Evaluating outcomes from ISO 9000-certified quality systems of Hong Kong constructors. Total Q. Man. 2001, 12(1):29-40.
    • (2001) Total Q. Man. , vol.12 , Issue.1 , pp. 29-40
    • Dissanayaka, S.M.1    Kumaraswamy, M.M.2    Karim, K.3    Marosszeky, M.4
  • 22
    • 0036680432 scopus 로고    scopus 로고
    • Linking the firm's technological status and ISO certification: results of an empirical research
    • Escanciano C., Fernandez E., Vazquez C. Linking the firm's technological status and ISO certification: results of an empirical research. Technovation. 2002, 22:509-515.
    • (2002) Technovation. , vol.22 , pp. 509-515
    • Escanciano, C.1    Fernandez, E.2    Vazquez, C.3
  • 24
    • 0002978067 scopus 로고
    • Measuring project success
    • Freeman M., Beale P. Measuring project success. Proj. Man. J. 1992, 23(1):8-17.
    • (1992) Proj. Man. J. , vol.23 , Issue.1 , pp. 8-17
    • Freeman, M.1    Beale, P.2
  • 26
    • 61349157002 scopus 로고    scopus 로고
    • The impact of ISO 9000 on TQM and business performance
    • Han S.B., Chen S.K., Ebrahimpour M. The impact of ISO 9000 on TQM and business performance. J. Bus. Econ. Studies. 2007, 13(2):1-23.
    • (2007) J. Bus. Econ. Studies. , vol.13 , Issue.2 , pp. 1-23
    • Han, S.B.1    Chen, S.K.2    Ebrahimpour, M.3
  • 27
    • 20444489499 scopus 로고    scopus 로고
    • The financial effects of ISO registration for Danish companies
    • Häversjö T. The financial effects of ISO registration for Danish companies. Man. Aud. J. 2000, 15(1/2):47-52.
    • (2000) Man. Aud. J. , vol.15 , Issue.1-2 , pp. 47-52
    • Häversjö, T.1
  • 29
    • 18844366440 scopus 로고    scopus 로고
    • ISO registration's impact on sales and profitability - a longitudinal analysis before and after accreditation
    • Heras I., Dick G.P.M., Casadesus M. ISO registration's impact on sales and profitability - a longitudinal analysis before and after accreditation. Int. J. Qual. Rel. Man. 2002, 19(6):774-791.
    • (2002) Int. J. Qual. Rel. Man. , vol.19 , Issue.6 , pp. 774-791
    • Heras, I.1    Dick, G.P.M.2    Casadesus, M.3
  • 30
    • 0002253294 scopus 로고
    • Making self-assessment successful
    • Hillman G.P. Making self-assessment successful. TQM Mag. 1994, 6(3):29-31.
    • (1994) TQM Mag. , vol.6 , Issue.3 , pp. 29-31
    • Hillman, G.P.1
  • 31
    • 80053054133 scopus 로고    scopus 로고
    • ISO The ISO Survey of Certification 2008
    • Retrieved from on 10th May 2010.)
    • ISO The ISO Survey of Certification 2008. Global picture 2010, Retrieved from http://www.iso.org/iso/survey2008.pdf on 10th May 2010.).
    • (2010) Global picture
  • 32
    • 27344461067 scopus 로고    scopus 로고
    • Organizational effectiveness model for quality management systems in the Australian construction industry
    • Karim K., Marosszeky M., Kumaraswamy M. Organizational effectiveness model for quality management systems in the Australian construction industry. Total Qual. Man. 2005, 16(6):793-806.
    • (2005) Total Qual. Man. , vol.16 , Issue.6 , pp. 793-806
    • Karim, K.1    Marosszeky, M.2    Kumaraswamy, M.3
  • 33
    • 21844442341 scopus 로고    scopus 로고
    • The evidence of poor quality in high rise and medium rise housing units: a case study of mass housing projects in Turkey
    • Kazaz A., Birgonul M.T. The evidence of poor quality in high rise and medium rise housing units: a case study of mass housing projects in Turkey. Build. Env. 2005, 40:1548-1556.
    • (2005) Build. Env. , vol.40 , pp. 1548-1556
    • Kazaz, A.1    Birgonul, M.T.2
  • 34
    • 33847277822 scopus 로고    scopus 로고
    • The impact of ISO 9000 quality management systems on manufacturing
    • Koc T. The impact of ISO 9000 quality management systems on manufacturing. J. Mat. Proc. Tech. 2007, 186:207-213.
    • (2007) J. Mat. Proc. Tech. , vol.186 , pp. 207-213
    • Koc, T.1
  • 35
    • 72049108109 scopus 로고    scopus 로고
    • Employees' perspective on the effectiveness of ISO 9000 certification: a total quality management framework
    • Kuo T., Chang T.-J., Hung K.-C., Lin M.-y. Employees' perspective on the effectiveness of ISO 9000 certification: a total quality management framework. Total Qual. Mgt. 2009, 20(12):1321-1335.
    • (2009) Total Qual. Mgt. , vol.20 , Issue.12 , pp. 1321-1335
    • Kuo, T.1    Chang, T.-J.2    Hung, K.-C.3    Lin, M.-Y.4
  • 36
    • 0033177685 scopus 로고    scopus 로고
    • Criteria of project success: an exploratory re-examination
    • Lim C.S., Mohamed M.Z. Criteria of project success: an exploratory re-examination. Int. J. Proj. Man. 1999, 17(4):243-248.
    • (1999) Int. J. Proj. Man. , vol.17 , Issue.4 , pp. 243-248
    • Lim, C.S.1    Mohamed, M.Z.2
  • 37
    • 0033903919 scopus 로고    scopus 로고
    • An exploratory study into recurring construction problems
    • Lim C.S., Mohamed M.Z. An exploratory study into recurring construction problems. Int. J. Proj. Man. 2000, 18(4):267-273.
    • (2000) Int. J. Proj. Man. , vol.18 , Issue.4 , pp. 267-273
    • Lim, C.S.1    Mohamed, M.Z.2
  • 38
    • 0033718594 scopus 로고    scopus 로고
    • Quality certification and performance of Brazilian firms: an empirical study
    • Lima M.A.M., Resende M., Hasenclever L. Quality certification and performance of Brazilian firms: an empirical study. Int. J. Of Prod. Econ. 2000, 66:143-147.
    • (2000) Int. J. Of Prod. Econ. , vol.66 , pp. 143-147
    • Lima, M.A.M.1    Resende, M.2    Hasenclever, L.3
  • 39
    • 84986104215 scopus 로고    scopus 로고
    • Project management benchmarks for SMEs implementing ISO 9000
    • Lo V., Humphreys P. Project management benchmarks for SMEs implementing ISO 9000. Benchmarking Int. J. 2000, 7(4):247-259.
    • (2000) Benchmarking Int. J. , vol.7 , Issue.4 , pp. 247-259
    • Lo, V.1    Humphreys, P.2
  • 40
    • 63149150572 scopus 로고    scopus 로고
    • ISO 9000 and supply chain efficiency: empirical evidence on inventory and account receivable days
    • Lo C.K.Y., Yeung A.C.L., Cheng T.C.E. ISO 9000 and supply chain efficiency: empirical evidence on inventory and account receivable days. Int. J. Prod. Econ. 2009, 118:141-163.
    • (2009) Int. J. Prod. Econ. , vol.118 , pp. 141-163
    • Lo, C.K.Y.1    Yeung, A.C.L.2    Cheng, T.C.E.3
  • 41
    • 17744384376 scopus 로고    scopus 로고
    • Overcoming obstacles to developing effective performance measures
    • Manoochehri G. Overcoming obstacles to developing effective performance measures. Work Study 1999, 48(6):223-229.
    • (1999) Work Study , vol.48 , Issue.6 , pp. 223-229
    • Manoochehri, G.1
  • 42
    • 34547141244 scopus 로고    scopus 로고
    • A triple analysis of ISO 9000 effects on company performance
    • Martinez-Costa M., Martinez-Lorenta A.R. A triple analysis of ISO 9000 effects on company performance. Int. J. Prod. Perf. Man. 2007, 56(5/6):484-499.
    • (2007) Int. J. Prod. Perf. Man. , vol.56 , Issue.5-6 , pp. 484-499
    • Martinez-Costa, M.1    Martinez-Lorenta, A.R.2
  • 44
    • 41549115413 scopus 로고    scopus 로고
    • The financial impact of standard stringency: a event study of successive generations of the ISO 9000 standard
    • McGuire S.J., Dilts D.M. The financial impact of standard stringency: a event study of successive generations of the ISO 9000 standard. Int. J. Prod. Econ. 2008, 113:3-22.
    • (2008) Int. J. Prod. Econ. , vol.113 , pp. 3-22
    • McGuire, S.J.1    Dilts, D.M.2
  • 45
    • 34547820692 scopus 로고    scopus 로고
    • The influence of project managers on project success criteria and project success by type of project
    • Muller R., Turner R. The influence of project managers on project success criteria and project success by type of project. Eur. Man. J. 2007, 25(4):298-309.
    • (2007) Eur. Man. J. , vol.25 , Issue.4 , pp. 298-309
    • Muller, R.1    Turner, R.2
  • 46
    • 84992989173 scopus 로고    scopus 로고
    • Impact of ISO 9000 registration on company performance - evidence from Malaysia
    • Naser K., Karbhari Y., Mokhtar M.Z. Impact of ISO 9000 registration on company performance - evidence from Malaysia. Man. Audit. J. 2004, 19(4):509-516.
    • (2004) Man. Audit. J. , vol.19 , Issue.4 , pp. 509-516
    • Naser, K.1    Karbhari, Y.2    Mokhtar, M.Z.3
  • 47
    • 3943100720 scopus 로고    scopus 로고
    • When does the ISO 9000 quality assurance standard lead to performance improvement? Assimilation and going beyond.
    • Naveh E., Marcus A.A. When does the ISO 9000 quality assurance standard lead to performance improvement? Assimilation and going beyond. IEEE Trans. Eng. Man. 2005, 51(3):352-363.
    • (2005) IEEE Trans. Eng. Man. , vol.51 , Issue.3 , pp. 352-363
    • Naveh, E.1    Marcus, A.A.2
  • 49
    • 84993073494 scopus 로고    scopus 로고
    • ISO 9000 certification of Singapore construction enterprises: its costs and benefits and its role in the development of the industry
    • Ofori G., Gang G. ISO 9000 certification of Singapore construction enterprises: its costs and benefits and its role in the development of the industry. Eng Const. Arch. Man. 2001, 8(2):145-157.
    • (2001) Eng Const. Arch. Man. , vol.8 , Issue.2 , pp. 145-157
    • Ofori, G.1    Gang, G.2
  • 50
    • 0242297293 scopus 로고    scopus 로고
    • An integrated view of project and quality management for project-based organisation
    • Orwig R.A., Brennan L.L. An integrated view of project and quality management for project-based organisation. Int. J. Qual. Rel. Man. 2000, 17(4/5):351-363.
    • (2000) Int. J. Qual. Rel. Man. , vol.17 , Issue.4-5 , pp. 351-363
    • Orwig, R.A.1    Brennan, L.L.2
  • 51
    • 2342544338 scopus 로고    scopus 로고
    • Performance measurement
    • Parker C. Performance measurement. Work Study 2000, 49(2):63-66.
    • (2000) Work Study , vol.49 , Issue.2 , pp. 63-66
    • Parker, C.1
  • 52
    • 70349971896 scopus 로고    scopus 로고
    • From quality to innovation: evidence from two French employer surveys
    • Pekovic S., Galia F. From quality to innovation: evidence from two French employer surveys. Technovation. 2009, 29(12):829-842.
    • (2009) Technovation. , vol.29 , Issue.12 , pp. 829-842
    • Pekovic, S.1    Galia, F.2
  • 53
    • 0033718185 scopus 로고    scopus 로고
    • The maintenance of construction safety: riding on ISO 9000 quality management system
    • Pheng L.S., Shina S.C. The maintenance of construction safety: riding on ISO 9000 quality management system. J. Qual. Main. Eng. 2000, 6(1):28-44.
    • (2000) J. Qual. Main. Eng. , vol.6 , Issue.1 , pp. 28-44
    • Pheng, L.S.1    Shina, S.C.2
  • 54
    • 80053051398 scopus 로고    scopus 로고
    • Examining the impact of ISO 9000 on business performance using stock market returns
    • Pinar M., Crouch H.L., Yucel T., Guder F. Examining the impact of ISO 9000 on business performance using stock market returns. J. Bus. Soc. 2003, 12(2):1-25.
    • (2003) J. Bus. Soc. , vol.12 , Issue.2 , pp. 1-25
    • Pinar, M.1    Crouch, H.L.2    Yucel, T.3    Guder, F.4
  • 56
    • 64049118036 scopus 로고    scopus 로고
    • Significance of project management performance assessment (PMPA) model
    • Qureshi T.M., Warraich A.S., Hijazi S.T. Significance of project management performance assessment (PMPA) model. Int. J. Proj. Man. 2009, 27(4):378-388.
    • (2009) Int. J. Proj. Man. , vol.27 , Issue.4 , pp. 378-388
    • Qureshi, T.M.1    Warraich, A.S.2    Hijazi, S.T.3
  • 57
    • 49149120310 scopus 로고    scopus 로고
    • The moderating effect of organizational slack on the relation between perceptions of support for innovation and organizational climate
    • Ruiz-Moreno A., Garcia-Morales V.J., Liorens-Montes F.J. The moderating effect of organizational slack on the relation between perceptions of support for innovation and organizational climate. Pers. Rev. 2008, 37(5):509-525.
    • (2008) Pers. Rev. , vol.37 , Issue.5 , pp. 509-525
    • Ruiz-Moreno, A.1    Garcia-Morales, V.J.2    Liorens-Montes, F.J.3
  • 58
    • 0347059986 scopus 로고    scopus 로고
    • The role of contract type in the success of R&D defense projects under increasing uncertainty
    • Sadeh A., Dvir D., Shenhar A. The role of contract type in the success of R&D defense projects under increasing uncertainty. Proj. Man. J. 2000, 31(3):14-22.
    • (2000) Proj. Man. J. , vol.31 , Issue.3 , pp. 14-22
    • Sadeh, A.1    Dvir, D.2    Shenhar, A.3
  • 59
    • 0004070572 scopus 로고    scopus 로고
    • Pearson Education, Inc., N.J., US
    • Salkind N.J. Exploring Research 2009, Pearson Education, Inc., N.J., US. seventh ed.
    • (2009) Exploring Research
    • Salkind, N.J.1
  • 61
    • 0032769088 scopus 로고    scopus 로고
    • Integrated quality systems in construction projects: the Chilean case
    • Serpell A. Integrated quality systems in construction projects: the Chilean case. Int. J. Proj. Man. 1999, 17(5):317-322.
    • (1999) Int. J. Proj. Man. , vol.17 , Issue.5 , pp. 317-322
    • Serpell, A.1
  • 62
    • 0032142659 scopus 로고    scopus 로고
    • Construction process improvement methodology for construction projects
    • Serpell A., Alarcon L.F. Construction process improvement methodology for construction projects. Int. J. Proj. Man. 1998, 16(4):215-221.
    • (1998) Int. J. Proj. Man. , vol.16 , Issue.4 , pp. 215-221
    • Serpell, A.1    Alarcon, L.F.2
  • 63
    • 22144489104 scopus 로고    scopus 로고
    • The association between ISO 9000 certification and financial performance
    • Sharma D.S. The association between ISO 9000 certification and financial performance. Int. J. Acc. 2005, 4:151-172.
    • (2005) Int. J. Acc. , vol.4 , pp. 151-172
    • Sharma, D.S.1
  • 64
    • 0035735411 scopus 로고    scopus 로고
    • Project success: a multidimensional strategic concept
    • Shenhar A.J., Dvir D., Levy O., Maltz A.C. Project success: a multidimensional strategic concept. Long Range Plan. 2001, 34:699-725.
    • (2001) Long Range Plan. , vol.34 , pp. 699-725
    • Shenhar, A.J.1    Dvir, D.2    Levy, O.3    Maltz, A.C.4
  • 66
    • 41549165800 scopus 로고    scopus 로고
    • Empirical assessment of ISO 9000 related management practices and performance relationships
    • Singh P.J. Empirical assessment of ISO 9000 related management practices and performance relationships. Int. J. Prod. Econ. 2008, 113:40-59.
    • (2008) Int. J. Prod. Econ. , vol.113 , pp. 40-59
    • Singh, P.J.1
  • 68
    • 33746303646 scopus 로고    scopus 로고
    • The effect of certification with the ISO 9000 quality management standard: a signalling approach
    • Terlaak A., King A.A. The effect of certification with the ISO 9000 quality management standard: a signalling approach. J. Econ. Beh. Org. 2006, 60:579-602.
    • (2006) J. Econ. Beh. Org. , vol.60 , pp. 579-602
    • Terlaak, A.1    King, A.A.2
  • 69
    • 33846584526 scopus 로고    scopus 로고
    • Increasing ISO 9000 certification benefits: a continuous improvement approach
    • Terziovski M., Power D. Increasing ISO 9000 certification benefits: a continuous improvement approach. Int. J. Qual. Rel. Man. 2007, 24(2):168-179.
    • (2007) Int. J. Qual. Rel. Man. , vol.24 , Issue.2 , pp. 168-179
    • Terziovski, M.1    Power, D.2
  • 70
    • 0037401466 scopus 로고    scopus 로고
    • The longitudinal effects of the ISO 9000 certification process on business performance
    • Terziovski M., Power D., Sohal A.S. The longitudinal effects of the ISO 9000 certification process on business performance. Eur. J. Ops. Res. 2003, 146:580-595.
    • (2003) Eur. J. Ops. Res. , vol.146 , pp. 580-595
    • Terziovski, M.1    Power, D.2    Sohal, A.S.3
  • 71
    • 33847074546 scopus 로고    scopus 로고
    • The seven deadly sins of project management
    • Turk W. The seven deadly sins of project management. IET Eng. Mgt. 2006, 16(6):30-32.
    • (2006) IET Eng. Mgt. , vol.16 , Issue.6 , pp. 30-32
    • Turk, W.1
  • 72
    • 0000764084 scopus 로고    scopus 로고
    • Research practice in business marketing - a comment on response rate and response bias
    • Wilson E.J. Research practice in business marketing - a comment on response rate and response bias. Ind. Market. Man. 1999, 28:257-260.
    • (1999) Ind. Market. Man. , vol.28 , pp. 257-260
    • Wilson, E.J.1
  • 73
    • 0242314515 scopus 로고    scopus 로고
    • Construction total project management planning issues
    • Yates J.K., Eskander A. Construction total project management planning issues. Proj. Man. J. 2002, 33(1):37-48.
    • (2002) Proj. Man. J. , vol.33 , Issue.1 , pp. 37-48
    • Yates, J.K.1    Eskander, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.