메뉴 건너뛰기




Volumn 49, Issue 21, 2011, Pages 6407-6426

Managing warehousing in an agile supply chain environment: An F-AIS algorithm based approach

Author keywords

agile; AIS; fuzzy; scheduling; supply chain; warehousing

Indexed keywords

ARTIFICIAL INTELLIGENCE; FUZZY LOGIC; GENETIC ALGORITHMS; IMMUNE SYSTEM; INDUSTRIAL RESEARCH; MANUFACTURE; SCHEDULING; SIMULATED ANNEALING; SUPPLY CHAINS; WAREHOUSES;

EID: 80053008148     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2010.528057     Document Type: Article
Times cited : (23)

References (38)
  • 1
    • 33748693686 scopus 로고    scopus 로고
    • Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach
    • DOI 10.1016/j.ejor.2004.12.005, PII S0377221705000135
    • Agarwal, A., Shankar, R., and Tiwari, M. K., 2006. Modeling the metrics of lean, agile and leagile supply chain: an ANP-based approach. European Journal of operational Research, 173(1), 211-225. (Pubitemid 44389582)
    • (2006) European Journal of Operational Research , vol.173 , Issue.1 , pp. 211-225
    • Agarwal, A.1    Shankar, R.2    Tiwari, M.K.3
  • 2
    • 0001353012 scopus 로고
    • Design and performance models for end-of-aisle order picking systems
    • Bozer, Y. A. and White, J. A., 1990. Design and performance models for end-of-aisle order picking systems. Management Science, 36(7), 852-856.
    • (1990) Management Science , vol.36 , Issue.7 , pp. 852-856
    • Bozer, Y.A.1    White, J.A.2
  • 3
    • 34249760856 scopus 로고
    • Vehicle routing in an automated warehouse: Analysis and optimization
    • Burkard, R. E., Fruhwirth, B., and Rote, G., 1995. Vehicle routing in an automated warehouse: analysis and optimization. Annals of Operations Research, 57(1), 29-44.
    • (1995) Annals of Operations Research , vol.57 , Issue.1 , pp. 29-44
    • Burkard, R.E.1    Fruhwirth, B.2    Rote, G.3
  • 4
    • 0034249441 scopus 로고    scopus 로고
    • Supply chain inventory management and the value of shared information
    • Cachon, G. P. and Fisher, M., 2000. Supply chain inventory management and the value of shared information. Management Science, 46(8), 1032-1048.
    • (2000) Management Science , vol.46 , Issue.8 , pp. 1032-1048
    • Cachon, G.P.1    Fisher, M.2
  • 6
    • 57049108765 scopus 로고    scopus 로고
    • A hybrid TSSA algorithm based approach to solve warehouse scheduling problems
    • Chan, F. T. S. and Kumar, V., 2009. A hybrid TSSA algorithm based approach to solve warehouse scheduling problems. International Journal of Production Research, 47(4), 919-940.
    • (2009) International Journal of Production Research , vol.47 , Issue.4 , pp. 919-940
    • Chan, F.T.S.1    Kumar, V.2
  • 7
    • 56349099192 scopus 로고    scopus 로고
    • The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model
    • Chan, F. T. S., Kumar, V., and Tiwari, M. K., 2009. The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model. International Journal of Production Research, 47(1), 119-142.
    • (2009) International Journal of Production Research , vol.47 , Issue.1 , pp. 119-142
    • Chan, F.T.S.1    Kumar, V.2    Tiwari, M.K.3
  • 10
    • 0012708708 scopus 로고    scopus 로고
    • AiNet: An artificial immune network for data analysis
    • H. A. Abbass, R. A. Sarker and C. S. Newton, eds, Hershey, PA: Idea Group Publishing
    • De Castro, L. N. and Von Zuben, F. J., 2001. aiNet: an artificial immune network for data analysis. In: H. A. Abbass, R. A. Sarker and C. S. Newton, eds. Data mining: a heuristic approach. Hershey, PA: Idea Group Publishing, 231-260.
    • (2001) Data Mining: A Heuristic Approach , pp. 231-260
    • De Castro, L.N.1    Von Zuben, F.J.2
  • 13
    • 0000809110 scopus 로고
    • Warehouse location under continuous economies of scale
    • Feldman, E., Lehrer, F. A., and Ray, T. L., 1966. Warehouse location under continuous economies of scale. Management Science, 12(9), 670-684.
    • (1966) Management Science , vol.12 , Issue.9 , pp. 670-684
    • Feldman, E.1    Lehrer, F.A.2    Ray, T.L.3
  • 16
    • 0032640805 scopus 로고    scopus 로고
    • Agile manufacturing: A framework for research and development
    • Gunasekaran, A., 1999. Agile manufacturing: a framework for research and development. International Journal of Production Economics, 62(13-2), 87-105.
    • (1999) International Journal of Production Economics , vol.62 , Issue.2-13 , pp. 87-105
    • Gunasekaran, A.1
  • 17
    • 0034694501 scopus 로고    scopus 로고
    • Lean, agile or leagile? Matching your supply chain to the marketplace
    • DOI 10.1080/00207540050204920
    • Jones, R. M., Naylor, J. B., and Towill, D. R., 2000. Lean, agile or leagile? Matching your supply chain to the market place. International Journal of Production Research, 38(17), 4061-4070. (Pubitemid 35401887)
    • (2000) International Journal of Production Research , vol.38 , Issue.17 SPEC. , pp. 4061-4070
    • Mason-Jones, R.1    Naylor, B.2    Towill, D.R.3
  • 19
    • 0242375709 scopus 로고    scopus 로고
    • A hybrid scheduling and control system architecture for warehouse management
    • Kim, B.-I., et al., 2003a. A hybrid scheduling and control system architecture for warehouse management. IEEE Transactions on Robotics and Automation, 19(6), 991-1001.
    • (2003) IEEE Transactions on Robotics and Automation , vol.19 , Issue.6 , pp. 991-1001
    • Kim, B.-I.1
  • 20
    • 15844369427 scopus 로고    scopus 로고
    • Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling
    • DOI 10.1016/S1568-4946(02)00065-0, PII S1568494602000650
    • Kim, K. W., Gen, M., and Yamazaki, G., 2003b. Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling. Applied Soft Computing, 2(3), 174-188. (Pubitemid 40421585)
    • (2003) Applied Soft Computing Journal , vol.2 , Issue.3 , pp. 174-188
    • Kim, K.W.1    Gen, M.2    Yamazaki, G.3
  • 21
    • 33646435566 scopus 로고    scopus 로고
    • Stochastic make-to-stock inventory deployment problem: An endosymbiotic psychoclonal algorithm based approach
    • Kumar, V., et al., 2006. Stochastic make-to-stock inventory deployment problem: an endosymbiotic psychoclonal algorithm based approach. International Journal of Production Research, 44(11), 2245-2263.
    • (2006) International Journal of Production Research , vol.44 , Issue.11 , pp. 2245-2263
    • Kumar, V.1
  • 23
    • 84871316791 scopus 로고
    • Modeling and solving the flexible forging module scheduling problem
    • Kusiak, A. and Finke, G., 1987. Modeling and solving the flexible forging module scheduling problem. Engineering Optimization, 12(1), 1-12.
    • (1987) Engineering Optimization , vol.12 , Issue.1 , pp. 1-12
    • Kusiak, A.1    Finke, G.2
  • 24
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • DOI 10.1016/S0360-8352(02)00079-7, PII S0360835202000797
    • Lee, Y. H., Jeong, C. S., and Moon, C., 2002. Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers & Industrial Engineering, 43(13-2), 351-374. (Pubitemid 34551917)
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 25
    • 0036930608 scopus 로고    scopus 로고
    • Warehousing and inventory management: A simulation tool to determine warehouse efficiencies and storage allocations
    • 8-11 December 2002, San Diego, CA, USA
    • Macro, J. G and Salmi, R. E., 2002. Warehousing and inventory management: a simulation tool to determine warehouse efficiencies and storage allocations. In: Proceedings of the 34th winter simulation conference: exploring new frontiers, 8-11 December 2002, San Diego, CA, USA, 1274-1281.
    • (2002) Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers , pp. 1274-1281
    • Macro, J.G.1    Salmi, R.E.2
  • 26
    • 0036642688 scopus 로고    scopus 로고
    • Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain
    • DOI 10.1016/S0360-8352(02)00078-5, PII S0360835202000785
    • Moon, C., Kim, J., and Hur, S., 2002. Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain. Computers and Industrial Engineering, 43(13-2), 331-349. (Pubitemid 34551916)
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1-2 , pp. 331-349
    • Moon, C.1    Kim, J.2    Hur, S.3
  • 29
    • 0020748062 scopus 로고
    • Order-picking in a rectangular warehouse: A solvable case of the traveling salesman problem
    • Rosenthal, A. S. and Ratliff, H. D., 1983. Order picking in a rectangular warehouse: a solvable case of the traveling salesman problem. Operations Research, 31(3), 507-521. (Pubitemid 13576748)
    • (1983) Operations Research , vol.31 , Issue.3 , pp. 507-521
    • Ratliff H.Donald1    Rosenthal Arnon, S.2
  • 31
    • 38749131560 scopus 로고    scopus 로고
    • Metaheuristic scheduling of multiple picking agents for warehouse management
    • DOI 10.1108/01439910810843298, Co-operative and two-arm robots
    • Rubrico, J. I. U., et al., 2008. Meta-heuristic scheduling of multiple picking agents for warehouse management. Industrial Robot: An International Journal, 35(1), 58-68. (Pubitemid 351182573)
    • (2008) Industrial Robot , vol.35 , Issue.1 , pp. 58-68
    • Rubrico, J.I.U.1    Ota, J.2    Higashi, T.3    Tamura, H.4
  • 32
    • 44849138466 scopus 로고    scopus 로고
    • Quantifying costs of forecast errors: A case study of the warehouse environment
    • Sanders, N. R. and Graman, G. A., 2009. Quantifying costs of forecast errors: a case study of the warehouse environment. Omega, 37(1), 116-125.
    • (2009) Omega , vol.37 , Issue.1 , pp. 116-125
    • Sanders, N.R.1    Graman, G.A.2
  • 34
    • 0032628476 scopus 로고    scopus 로고
    • Optimal routing in an automated storage/retrieval system with dedicated storage
    • Van den Berg, J. P. and Gademann, A. J. R. M., 1999. Optimal routing in an automated storage/retrieval system with dedicated storage. IIE Transactions, 31(5), 407-415.
    • (1999) IIE Transactions , vol.31 , Issue.5 , pp. 407-415
    • Van Den Berg, J.P.1    Gademann, A.J.R.M.2
  • 36
    • 0002483817 scopus 로고    scopus 로고
    • Reconfiguring the Supply Chain to Implement Postponed Manufacturing
    • Van Hoek, R. I., 1998. Reconfiguring the supply chain to implement postponed manufacturing. International Journal of Logistic Management, 9(1), 95-110. (Pubitemid 128122303)
    • (1998) International journal of logistics management , vol.9 , Issue.1 , pp. 95-110
    • Van Hoek, R.I.1
  • 37
    • 0037952065 scopus 로고    scopus 로고
    • The impact of approximate evaluation on the performance of search algorithms for warehouse scheduling
    • Watson, J. P., et al., 1999. The impact of approximate evaluation on the performance of search algorithms for warehouse scheduling. Journal of Scheduling, 2(2), 79-98. (Pubitemid 129633847)
    • (1999) Journal of Scheduling , vol.2 , Issue.2 , pp. 79-98
    • Watson, J.P.1    Rana, S.2    Whitley, L.D.3    Howe, A.E.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.