메뉴 건너뛰기




Volumn 2, Issue 3, 2003, Pages 174-188

Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling

Author keywords

Fuzzy logic controller (FLC); Hybrid genetic algorithm (hGA); Priority rule method (PRM); Resource constrained project scheduling problem (rcPSP)

Indexed keywords

CONTROL EQUIPMENT; FUZZY SETS; GENETIC ALGORITHMS; HEURISTIC METHODS; MATHEMATICAL OPERATORS; PARAMETER ESTIMATION; PROBLEM SOLVING;

EID: 15844369427     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1568-4946(02)00065-0     Document Type: Article
Times cited : (67)

References (21)
  • 1
    • 0002755938 scopus 로고
    • Scheduling optimization using genetic algorithms
    • L. Davis (Ed.), Van Nostrand Reinhold, New York
    • G. Syswerda, Scheduling optimization using genetic algorithms, in: L. Davis (Ed.), Handbook of Genetic Algorithms, Van Nostrand Reinhold, New York, 1991, pp. 332-349.
    • (1991) Handbook of Genetic Algorithms , pp. 332-349
    • Syswerda, G.1
  • 3
    • 0035837944 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
    • A. Schirmer, Resource-constrained project scheduling: an evaluation of adaptive control schemes for parameterized sampling heuristics, Int. J. Prod. Res. 39 (2001) 1343-1365.
    • (2001) Int. J. Prod. Res. , vol.39 , pp. 1343-1365
    • Schirmer, A.1
  • 4
    • 0012442701 scopus 로고    scopus 로고
    • Truncated branch and bound, schedule-construction, for resource-constrained project scheduling
    • B. Franck, K. Neumann, C. Schwindt, Truncated branch and bound, schedule-construction, for resource-constrained project scheduling, OR Spektrum 23 (2001) 297-324.
    • (2001) OR Spektrum , vol.23 , pp. 297-324
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 5
    • 84989743918 scopus 로고
    • A new heuristic solution method in resource-constrained project scheduling
    • C.E. Bell, J.M. Han, A new heuristic solution method in resource-constrained project scheduling, Naval Res. Logistics 38 (1991) 315-331.
    • (1991) Naval Res. Logistics , vol.38 , pp. 315-331
    • Bell, C.E.1    Han, J.M.2
  • 6
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource-constrained project scheduling
    • F.F. Boctor, Some efficient multi-heuristic procedures for resource-constrained project scheduling, Eur. J. Operat. Res. 49 (1990) 3-13.
    • (1990) Eur. J. Operat. Res. , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 8
    • 0019226286 scopus 로고
    • Adaptive system design: A genetic approach
    • K.A. De Jong, Adaptive system design: a genetic approach, IEEE Trans. Sys. Man Cybernet. SMC-10 (1980) 566-574.
    • (1980) IEEE Trans. Sys. Man Cybernet. , vol.SMC-10 , pp. 566-574
    • De Jong, K.A.1
  • 9
    • 0030231464 scopus 로고    scopus 로고
    • An iterative local constraint based analysis for solving the resource-constrained project scheduling problem
    • L. Özdamar, G. Ulusoy, An iterative local constraint based analysis for solving the resource-constrained project scheduling problem, J. Operat. Manage. 14 (1996) 193-208.
    • (1996) J. Operat. Manage. , vol.14 , pp. 193-208
    • Özdamar, L.1    Ulusoy, G.2
  • 10
    • 0002614325 scopus 로고    scopus 로고
    • A genetic algorithm approach to a general category project scheduling problem
    • L. Özdamar, A genetic algorithm approach to a general category project scheduling problem, IEEE Trans. Sys. Man Cybernet. Part C: Appl. Rev. 29 (1999) 44-59.
    • (1999) IEEE Trans. Sys. Man Cybernet. Part C: Appl. Rev. , vol.29 , pp. 44-59
    • Özdamar, L.1
  • 11
    • 0035451950 scopus 로고    scopus 로고
    • Network design techniques using adapted genetic algorithms
    • M. Gen, R. Cheng, S.S. Oren, Network design techniques using adapted genetic algorithms, Adv. Eng. Software 32 (2001) 731-744.
    • (2001) Adv. Eng. Software , vol.32 , pp. 731-744
    • Gen, M.1    Cheng, R.2    Oren, S.S.3
  • 12
    • 0032096810 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, model, and methods
    • P. Brucker, A. Drexl, R. Mohring, K. Neumann, E. Pesch, Resource-constrained project scheduling: notation, classification, model, and methods, Eur. J. Operat. Res. 107 (1998) 272-288.
    • (1998) Eur. J. Operat. Res. , vol.107 , pp. 272-288
    • Brucker, P.1    Drexl, A.2    Mohring, R.3    Neumann, K.4    Pesch, E.5
  • 13
    • 85007087950 scopus 로고    scopus 로고
    • Resource-constrained project scheduling problem using genetic algorithms
    • R. Cheng, M. Gen, Resource-constrained project scheduling problem using genetic algorithms, Intell. Automat. Soft Comput. 3 (1997) 273-286.
    • (1997) Intell. Automat. Soft Comput. , vol.3 , pp. 273-286
    • Cheng, R.1    Gen, M.2
  • 14
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • R. Kolisch, Serial and parallel resource-constrained project scheduling methods revisited: theory and computation, Eur. J. Operat. Res. 90 (1996) 320-333.
    • (1996) Eur. J. Operat. Res. , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 15
    • 33845274958 scopus 로고
    • Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
    • V.J. Leon, R. Balakrishnan, Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling, OR Spektrum 17 (1995) 173-182.
    • (1995) OR Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Balakrishnan, R.2
  • 16
    • 0036642806 scopus 로고    scopus 로고
    • Advanced scheduling problem using constraint programming techniques in SCM environment
    • Y.S. Yun, M. Gen, Advanced scheduling problem using constraint programming techniques in SCM environment, Comput. Ind. Eng. 43 (2002) 213-229.
    • (2002) Comput. Ind. Eng. , vol.43 , pp. 213-229
    • Yun, Y.S.1    Gen, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.