Volumn , Issue , 2003, Pages 33-40

Construction Productivity Improvement: A Study of Human, Management and External Issues

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION PRODUCTIVITY; CONSTRUCTION PROJECT MANAGEMENT; TRAINING MATERIALS;

EID: 2342445207     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (54)

References (26)
  • 4
    • 2342444775 scopus 로고
    • Human Factors and Productivity Improvement
    • Institute for Research in Construction
    • Dozzi, S.P., and AbouRizk, S.M. (1993). "Human Factors and Productivity Improvement." Productivity in construction, Institute for Research in Construction, 17-26.
    • (1993) Productivity in Construction , pp. 17-26
    • Dozzi, S.P.1    Abourizk, S.M.2
  • 13
    • 60449099894 scopus 로고    scopus 로고
    • Master Thesis that will be submitted to Graz University of Technology, Austria, as an exchange student at University of Calgary, Canada
    • Liberda, M. (2003). "Construction Productivity Improvement: A Study of Human, External and Management Factors", Master Thesis that will be submitted to Graz University of Technology, Austria, as an exchange student at University of Calgary, Canada.
    • (2003) Construction Productivity Improvement: A Study of Human, External and Management Factors
    • Liberda, M.1
  • 14
    • 2342438961 scopus 로고    scopus 로고
    • Most critical factors that affect construction productivity in Alberta
    • submitted ASCE
    • Liberda, M. and Ruwanpura, J. (2003). "Most critical factors that affect construction productivity in Alberta," Under perpetration to be submitted to Journal of Construction Engineering and Management, ASCE.
    • (2003) Journal of Construction Engineering and Management
    • Liberda, M.1    Ruwanpura, J.2
  • 16
    • 0016928504 scopus 로고
    • Seasonal Effects on Building Construction
    • ASCE
    • Morris, D. (1976). "Seasonal Effects on Building Construction." Journal of the Construction Division, ASCE, 102(1), 29-39.
    • (1976) Journal of the Construction Division , vol.102 , Issue.1 , pp. 29-39
    • Morris, D.1
  • 21
    • 0034225578 scopus 로고    scopus 로고
    • Schedule Acceleration, Work Flow, and Labour Productivity
    • ASCE
    • Thomas, R. (2000). "Schedule Acceleration, Work Flow, and Labour Productivity." Journal of Construction Engineering and Management, ASCE, 126(4), 261-267.
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.4 , pp. 261-267
    • Thomas, R.1
  • 23
    • 0000849119 scopus 로고    scopus 로고
    • Scheduled overtime and labour productivity: Quantitative analysis
    • ASCE
    • Thomas, H.R., and Raynar, K.A. (1997). "Scheduled overtime and labour productivity: Quantitative analysis." Journal of Construction Engineering and Management, ASCE, 123(2), 181-188.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.2 , pp. 181-188
    • Thomas, H.R.1    Raynar, K.A.2
  • 24
    • 0026837613 scopus 로고
    • Effect of Scheduled Overtime on Labour Productivity
    • ASCE
    • Thomas, R. (1992). "Effect of Scheduled Overtime on Labour Productivity." Journal of Construction Engineering and Management, ASCE, 118(1), 60-76.
    • (1992) Journal of Construction Engineering and Management , vol.118 , Issue.1 , pp. 60-76
    • Thomas, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.