메뉴 건너뛰기




Volumn 137, Issue 8, 2011, Pages 600-608

Bootstrap technique for risk analysis with interval numbers in bridge construction projects

Author keywords

Bootstrap technique; Bridge construction projects; Bridges; Construction; Interval risk score; Non parametric statistics; Risk management; Statistics

Indexed keywords

ACCURATE INFERENCE; BOOTSTRAP TECHNIQUE; BRIDGE CONSTRUCTION PROJECTS; BRIDGE CONSTRUCTIONS; BRIDGE PROJECTS; CONVENTIONAL APPROACH; DATA SET SIZE; HYBRID APPROACH; INTERVAL COMPUTATIONS; INTERVAL NUMBER; INTERVAL RISK SCORE; INTERVAL VALUE; NON-PARAMETRIC; NON-PARAMETRIC STATISTICS; PARAMETRIC STATISTICAL TECHNIQUE; RESAMPLING TECHNIQUE; RISK IMPACT; RISK PARAMETER; RISK PROBABILITIES; SMALL DATA SET; STANDARD DEVIATION; STATISTICAL DISTRIBUTION; TRANSPORTATION STRUCTURES;

EID: 80051747339     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000344     Document Type: Article
Times cited : (30)

References (46)
  • 2
    • 0034323729 scopus 로고    scopus 로고
    • Capturing data and model uncertainties in highway performance estimation
    • 0733-947X, 10.1061/(ASCE)0733-947X(2000)126:6(455)
    • Amekudzi, A., and McNeil, S. (2000). Capturing data and model uncertainties in highway performance estimation.. J. Transp. Eng. 0733-947X, 126 (6), 455-463. 10.1061/(ASCE)0733-947X(2000)126:6(455)
    • (2000) J. Transp. Eng. , vol.126 , Issue.6 , pp. 455-463
    • Amekudzi, A.1    McNeil, S.2
  • 3
    • 34247580828 scopus 로고    scopus 로고
    • Prioritization of bridges and tunnels in earthquake risk mitigation using multicriteria decision analysis: Application to Lisbon
    • 0305-0483 10.1016/j.omega.2006.05.008
    • Bana e Costa, C. A., Oliveira, C. S., and Vieira, V. (2008). Prioritization of bridges and tunnels in earthquake risk mitigation using multicriteria decision analysis: Application to Lisbon.. Omega, 36, 442-450. 0305-0483 10.1016/j.omega.2006.05.008
    • (2008) Omega , vol.36 , pp. 442-450
    • Bana Costa E, C.A.1    Oliveira, C.S.2    Vieira, V.3
  • 4
    • 80051712208 scopus 로고    scopus 로고
    • Project risk management handbook
    • California Department of Transportation (Caltrans), Sacramento, CA
    • California Department of Transportation (Caltrans). (2007). Project risk management handbook.. Office of project management process improvement, Sacramento, CA.
    • (2007) Office of Project Management Process Improvement
  • 5
    • 0030244103 scopus 로고    scopus 로고
    • Life-cycle cost analysis with natural hazard risk
    • 1076-0342, 10.1061/(ASCE)1076-0342(1996)2:3(118)
    • Chang, S. E., and Shinozuka, M. (1996). Life-cycle cost analysis with natural hazard risk.. J. Infrastruct. Syst. 1076-0342, 2 (3), 118-126. 10.1061/(ASCE)1076-0342(1996)2:3(118)
    • (1996) J. Infrastruct. Syst. , vol.2 , Issue.3 , pp. 118-126
    • Chang, S.E.1    Shinozuka, M.2
  • 6
    • 41249086680 scopus 로고    scopus 로고
    • Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis
    • DOI 10.1016/j.finel.2007.12.004, PII S0168874X07001746
    • Cho, T., and Kim, T. S. (2008). Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis.. Finite Elem. Anal. Des., 44, 383-400. 0168-874X 10.1016/j.finel.2007.12.004 (Pubitemid 351444713)
    • (2008) Finite Elements in Analysis and Design , vol.44 , Issue.6-7 , pp. 383-400
    • Cho, T.1    Kim, T.S.2
  • 8
    • 79151479343 scopus 로고    scopus 로고
    • A fuzzy decision making model for risk ranking with application to the onshore gas refinery
    • 0957-4174 10.1016/j.eswa.2009.05.037
    • Ebrahimnejad, S., Mousavi, S. M., and Mojtahedi, S. M. H. (2009). A fuzzy decision making model for risk ranking with application to the onshore gas refinery.. Int. J. Bus. Continuity Risk Manage. 0957-4174 10.1016/j.eswa.2009. 05.037
    • (2009) Int. J. Bus. Continuity Risk Manage.
    • Ebrahimnejad, S.1    Mousavi, S.M.2    Mojtahedi, S.M.H.3
  • 9
    • 0002344794 scopus 로고
    • Bootstrap methods: Another look at the jackknife
    • 0090-5364 10.1214/aos/1176344552
    • Efron, B. (1979). Bootstrap methods: Another look at the jackknife.. Ann. Stat., 7, 1-26. 0090-5364 10.1214/aos/1176344552
    • (1979) Ann. Stat. , vol.7 , pp. 1-26
    • Efron, B.1
  • 11
    • 84945737762 scopus 로고
    • A leisurely look at the bootstrap, the jackknife, and cross-validation
    • 0003-1305 10.2307/2685844
    • Efron, B., and Gong, B. (1983). A leisurely look at the bootstrap, the jackknife, and cross-validation.. Am. Stat., 37 (1), 36-48. 0003-1305 10.2307/2685844
    • (1983) Am. Stat. , vol.37 , Issue.1 , pp. 36-48
    • Efron, B.1    Gong, B.2
  • 13
    • 43849092152 scopus 로고    scopus 로고
    • Risk assessment and allocation in the UAE construction industry
    • DOI 10.1016/j.ijproman.2007.07.004, PII S026378630700110X
    • El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry.. Int. J. Proj. Manage., 26 (4), 431-438. (Pubitemid 351696563)
    • (2008) International Journal of Project Management , vol.26 , Issue.4 , pp. 431-438
    • El-Sayegh, S.M.1
  • 16
    • 0035366978 scopus 로고    scopus 로고
    • Risk factors affecting management and maintenance cost of urban infrastructure
    • DOI 10.1061/(ASCE)1076-0342(2001)7:2(67)
    • Hastak, M., and Baim, E. J. (2001). Risk factors affecting management and maintenance cost of urban infrastructure.. J. Infrastruct. Syst. 1076-0342, 7 (2), 67-76. 10.1061/(ASCE)1076-0342(2001)7:2(67) (Pubitemid 32548394)
    • (2001) Journal of Infrastructure Systems , vol.7 , Issue.2 , pp. 67-76
    • Hastak, M.1    Baim, E.J.2
  • 17
    • 23644442557 scopus 로고    scopus 로고
    • The bootstrap: A technique for data-driven statistics. Using computer-intensive analyses to explore experimental data
    • DOI 10.1016/j.cccn.2005.04.002, PII S0009898105002433
    • Henderson, A. R. (2005). The bootstrap: A technique for data-driven statistics. Using computer-intensive analyses to explore experimental data.. Clin. Chim. Acta 0009-8981, 359 (1-2), 1-26. 10.1016/j.cccn.2005.04.002 (Pubitemid 41116294)
    • (2005) Clinica Chimica Acta , vol.359 , Issue.1-2 , pp. 1-26
    • Henderson, A.R.1
  • 18
    • 85114846341 scopus 로고    scopus 로고
    • Quantifying uncertainties in a national forecasting model
    • 0733-9364 10.1061/(ASCE)0733-9364(2008)134:6(398)
    • Hugosson, M. B. (2005). Quantifying uncertainties in a national forecasting model.. Transp. Res. Part A Policy Pract. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:6(398)
    • (2005) Transp. Res. Part A Policy Pract.
    • Hugosson, M.B.1
  • 19
    • 15844392541 scopus 로고    scopus 로고
    • Fast bootstrap methodology for regression model selection
    • DOI 10.1016/j.neucom.2004.11.017, PII S092523120400517X
    • Lendasse, A., Simon, G., Wertz, V., and Verleysen, M. (2005). Fast bootstrap methodology for regression model selection.. Neurocomputing;Variable Star Bulletin, 64, 161-181. 0925-2312 10.1016/j.neucom.2004.11.017 (Pubitemid 40425317)
    • (2005) Neurocomputing , vol.64 , Issue.SPEC. ISS. 1-4 , pp. 161-181
    • Lendasse, A.1    Simon, G.2    Wertz, V.3    Verleysen, M.4
  • 20
    • 77950189840 scopus 로고    scopus 로고
    • Project risk identification and analysis based on group decision making methodology in a fuzzy environment
    • 0957-4174, 10.1016/j.eswa.2009.12.024
    • Makui, A., Mojtahedi, S. M. H., and Mousavi, S. M. (2010). Project risk identification and analysis based on group decision making methodology in a fuzzy environment.. Int. J. Manage. Sci. Eng. Manage. 0957-4174, 37, 4910-4920. 10.1016/j.eswa.2009.12.024
    • (2010) Int. J. Manage. Sci. Eng. Manage. , vol.37 , pp. 4910-4920
    • Makui, A.1    Mojtahedi, S.M.H.2    Mousavi, S.M.3
  • 21
    • 0036773528 scopus 로고    scopus 로고
    • Life cycle impact assessment: A challenge for risk analysts
    • DOI 10.1111/1539-6924.00256
    • Matthews, H. S., Lave, L., and MacLean, H. (2002). Life cycle impact assessment: A challenge for risk analysts.. Risk Anal., 22 (5), 853-860. 0272-4332 10.1111/1539-6924.00256 (Pubitemid 35239732)
    • (2002) Risk Analysis , vol.22 , Issue.5 , pp. 853-860
    • Matthews, H.S.1    Lave, L.2    MacLean, H.3
  • 22
    • 33744510576 scopus 로고    scopus 로고
    • Conditional resampling of hydrologic time series using multiple predictor variables: A K-nearest neighbour approach
    • DOI 10.1016/j.advwatres.2005.08.007, PII S0309170805002137
    • Mehrotra, R., and Sharma, A. (2006). Conditional resampling of hydrologic time series using multiple predictor variables: A K-nearest neighbor approach.. Adv. Water Resour., 29 (7), 987-999. 0309-1708 10.1016/j.advwatres.2005.08.007 (Pubitemid 43812203)
    • (2006) Advances in Water Resources , vol.29 , Issue.7 , pp. 987-999
    • Mehrotra, R.1    Sharma, A.2
  • 23
    • 63049113735 scopus 로고    scopus 로고
    • A non-parametric statistical approach for analyzing risk factor data in risk management process
    • 1812-5654 10.3923/jas.2009.113.120
    • Mojtahedi, S. M. H., Mousavi, S. M., and Aminian, A. (2009). A non-parametric statistical approach for analyzing risk factor data in risk management process.. J. Appl. Sci., 9 (1), 113-120. 1812-5654 10.3923/jas.2009.113.120
    • (2009) J. Appl. Sci. , vol.9 , Issue.1 , pp. 113-120
    • Mojtahedi, S.M.H.1    Mousavi, S.M.2    Aminian, A.3
  • 24
    • 76749119364 scopus 로고    scopus 로고
    • Project risk identification and assessment simultaneously using multi-attribute group decision making technique
    • 0925-7535 10.1016/j.ssci.2009.12.016
    • Mojtahedi, S. M. H., Mousavi, S. M., and Makui, A. (2010). Project risk identification and assessment simultaneously using multi-attribute group decision making technique.. Saf. Sci., 48 (4), 499-507. 0925-7535 10.1016/j.ssci.2009.12.016
    • (2010) Saf. Sci. , vol.48 , Issue.4 , pp. 499-507
    • Mojtahedi, S.M.H.1    Mousavi, S.M.2    Makui, A.3
  • 27
    • 80051763875 scopus 로고    scopus 로고
    • On project risk management
    • Project Management Institute (PMI).. ., 4th Ed., Ch., Newton Square, PA
    • Project Management Institute (PMI). (2008). On project risk management.. A guide to the project management body of knowledge (PMBOK guide), 4th Ed., Ch., Newton Square, PA.
    • (2008) A Guide to the Project Management Body of Knowledge (PMBOK Guide)
  • 28
    • 0032628293 scopus 로고    scopus 로고
    • Evaluating machine learning models for engineering problems
    • 0954-1810, 10.1016/S0954-1810(98)00021-1
    • Reich, Y., and Barai, S. V. (1999). Evaluating machine learning models for engineering problems.. Artif. Intell. Eng. 0954-1810, 13 (3), 257-272. 10.1016/S0954-1810(98)00021-1
    • (1999) Artif. Intell. Eng. , vol.13 , Issue.3 , pp. 257-272
    • Reich, Y.1    Barai, S.V.2
  • 29
    • 0842301356 scopus 로고    scopus 로고
    • Bootstrapped spatial statistics: A more robust approach to the analysis of finite strain data
    • DOI 10.1016/j.jsg.2003.08.011
    • Roy, D., Satpathy, S., and Kumar, V. A. (2004). Bootstrapped spatial statistics: A more robust approach to the analysis of finite strain data Malay Mukul.. J. Struct. Geol., 26 (3), 595-600. 0191-8141 10.1016/j.jsg.2003.08.011 (Pubitemid 38171729)
    • (2004) Journal of Structural Geology , vol.26 , Issue.3 , pp. 595-600
    • Mukul, M.1    Roy, D.2    Satpathy, S.3    Kumar, V.A.4
  • 31
    • 54249164585 scopus 로고    scopus 로고
    • Methodology for integrated risk management and proactive scheduling of construction projects
    • 0733-9364 10.1061/(ASCE)0733-9364(2008)134:11(885)
    • Schatteman, D., Herroelen, W., Van De Vonder, S., and Boone, A. (2008). Methodology for integrated risk management and proactive scheduling of construction projects.. J. Constr. Eng. Manage., 134 (11), 885-893. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:11(885)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.11 , pp. 885-893
    • Schatteman, D.1    Herroelen, W.2    Van De Vonder, S.3    Boone, A.4
  • 34
    • 56349131859 scopus 로고    scopus 로고
    • Parametric range estimating of building costs using regression models and bootstrap
    • 0733-9364 10.1061/(ASCE)0733-9364(2008)134:12(1011)
    • Sonmez, R. (2008). Parametric range estimating of building costs using regression models and bootstrap.. J. Constr. Eng. Manage., 134 (12), 1011-1016. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:12(1011)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.12 , pp. 1011-1016
    • Sonmez, R.1
  • 35
    • 11144316075 scopus 로고    scopus 로고
    • Hybrid moving block bootstrap for stochastic simulation of multi-site multi-season streamflows
    • DOI 10.1016/j.jhydrol.2004.07.011, PII S0022169404003828
    • Srinivas, V. V., and Srinivasan, K. (2005). Hybrid moving block bootstrap for stochastic simulation of multi-site multi-season streamflows.. J. Hydrol. (Amsterdam) 0022-1694, 302 (1-4), 307-330. 10.1016/j.jhydrol.2004.07.011 (Pubitemid 40020312)
    • (2005) Journal of Hydrology , vol.302 , Issue.1-4 , pp. 307-330
    • Srinivas, V.V.1    Srinivasan, K.2
  • 36
    • 33748307485 scopus 로고    scopus 로고
    • Hybrid matched-block bootstrap for stochastic simulation of multiseason streamflows
    • DOI 10.1016/j.jhydrol.2006.01.023, PII S0022169406000539
    • Srinivas, V. V., and Srinivasan, K. (2006). Hybrid matched-block bootstrap for stochastic simulation of multiseason streamflows.. J. Hydrol. (Amsterdam) 0022-1694, 329 (1-2), 1-15. 10.1016/j.jhydrol.2006.01.023 (Pubitemid 44331884)
    • (2006) Journal of Hydrology , vol.329 , Issue.1-2 , pp. 1-15
    • Srinivas, V.V.1    Srinivasan, K.2
  • 37
    • 0000629975 scopus 로고
    • Cross-validation choice and assessment of statistical predictions
    • Stone, M. (1974). Cross-validation choice and assessment of statistical predictions.. J. R. Stat., Soc. B, 36 (2), 111-147.
    • (1974) J. R. Stat., Soc. B , vol.36 , Issue.2 , pp. 111-147
    • Stone, M.1
  • 39
    • 80051713580 scopus 로고    scopus 로고
    • Tehran Municipality (TM)
    • Tehran Municipality (TM). (2009). http://www.tehran.ir/Default.aspx? tabid=16428&language=fa-IR.
    • (2009)
  • 40
    • 33750437220 scopus 로고    scopus 로고
    • A comparison of neural network, evidential reasoning and multiple regression analysis in modelling bridge risks
    • DOI 10.1016/j.eswa.2005.11.029, PII S095741740500343X
    • Wang, Y.-M., and Elhag, T. M. S. (2007 a). A comparison of neural network, evidential reasoning and multiple regression analysis in modeling bridge risks.. Expert Syst. Appl., 32 (2), 336-348. 0957-4174 10.1016/j.eswa.2005.11.029 (Pubitemid 44647803)
    • (2007) Expert Systems with Applications , vol.32 , Issue.2 , pp. 336-348
    • Wang, Y.-M.1    Elhag, T.M.S.2
  • 41
    • 34447287061 scopus 로고    scopus 로고
    • A fuzzy group decision making approach for bridge risk assessment
    • DOI 10.1016/j.cie.2007.04.009, PII S0360835207000721
    • Wang, Y.-M., and Elhag, T. M. S. (2007 b). A fuzzy group decision making approach for bridge risk assessment.. Comput. Ind. Eng. 0360-8352, 53 (1), 137-148. 10.1016/j.cie.2007.04.009 (Pubitemid 47042309)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.1 , pp. 137-148
    • Wang, Y.-M.1    Elhag, T.M.S.2
  • 42
    • 38849142595 scopus 로고    scopus 로고
    • An integrated AHP-DEA methodology for bridge risk assessment
    • DOI 10.1016/j.cie.2007.09.002, PII S0360835207002045
    • Wang, Y.-M., Liu, J., and Elhag, T. M. S. (2008). An integrated AHP-DEA methodology for bridge risk assessment.. Comput. Ind. Eng. 0360-8352, 54 (3), 513-525. 10.1016/j.cie.2007.09.002 (Pubitemid 351199802)
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.3 , pp. 513-525
    • Wang, Y.-M.1    Liu, J.2    Elhag, T.M.S.3
  • 43
    • 0034578786 scopus 로고    scopus 로고
    • The bootstrap: A tutorial
    • 0169-7439, 10.1016/S0169-7439(00)00102-7
    • Wehrens, R., Putter, H., and Buydens, L. M. C. (2000). The bootstrap: A tutorial.. Chemom. Intell. Lab. Syst. 0169-7439, 54 (1), 35-52. 10.1016/S0169-7439(00)00102-7
    • (2000) Chemom. Intell. Lab. Syst. , vol.54 , Issue.1 , pp. 35-52
    • Wehrens, R.1    Putter, H.2    Buydens, L.M.C.3
  • 44
    • 33745286368 scopus 로고    scopus 로고
    • Ranking method of a kind of uncertain multi-attribute decision making problem
    • Xu, Z., and Sun, Z. (2002). Ranking method of a kind of uncertain multi-attribute decision making problem.. Management Science Journal, 5 (3), 35-39.
    • (2002) Management Science Journal , vol.5 , Issue.3 , pp. 35-39
    • Xu, Z.1    Sun, Z.2
  • 45
    • 44049083501 scopus 로고    scopus 로고
    • Assessing risk and uncertainty inherent in Chinese highway projects using AHP
    • DOI 10.1016/j.ijproman.2007.05.012, PII S0263786307000932
    • Zayed, T., Amer, M., and Pan, J. (2008). Assessing risk and uncertainty inherent in Chinese highway projects using AHP.. Int. J. Proj. Manage., 26 (4), 408-419. doi:10.1016/j.ijproman.2007.05.012 (Pubitemid 351709369)
    • (2008) International Journal of Project Management , vol.26 , Issue.4 , pp. 408-419
    • Zayed, T.1    Amer, M.2    Pan, J.3
  • 46
    • 0031677647 scopus 로고    scopus 로고
    • The bootstrap and its application in signal processing
    • 1053-5888 10.1109/79.647043
    • Zoubir, A. M., and Boashash, B. (1998). The bootstrap and its application in signal processing.. IEEE Signal Process. Mag., 15 (1), 56-76. 1053-5888 10.1109/79.647043
    • (1998) IEEE Signal Process. Mag. , vol.15 , Issue.1 , pp. 56-76
    • Zoubir, A.M.1    Boashash, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.