-
1
-
-
0002344794
-
Bootstrap methods: Another look at the jackknife
-
Efron, B., "Bootstrap methods: another look at the jackknife",Ann Stat, Vol.7, pp.-26, 1979.
-
(1979)
Ann Stat
, vol.7
, pp. 26
-
-
Efron, B.1
-
3
-
-
62749137146
-
An analysis of project risks using the non-parametric bootstrap technique
-
Singapore
-
Alborzi, S., A. Aminian, S.M.H. Mojtahedi, S.M. Mousavi, "AnAnalysis of Project Risks Using the Non-parametric Bootstrap Technique",The 5th of IEEE International Conference on Industrial Engineering andEngineering Management, Singapore, 2008.
-
(2008)
th of IEEE International Conference on IndustrialEngineering and Engineering Management
-
-
Alborzi, S.1
Aminian, A.2
Mojtahedi, S.M.H.3
Mousavi, S.M.4
-
4
-
-
63049113735
-
A non-parametric statistical approach for analyzing risk factor data inrisk management process
-
Mojtahedi, S.M.H., S.M. Mousavi, A. Aminian, "A Non- parametricStatistical Approach for Analyzing Risk Factor Data in Risk ManagementProcess", Journal of Applied Sciences, Vol.9, No.1, ppl 13-120, 2009.
-
(2009)
Journal of Applied Sciences
, vol.9
, Issue.1
, pp. 13-120
-
-
Mojtahedi, S.M.H.1
Mousavi, S.M.2
Aminian, A.3
-
5
-
-
33845655755
-
-
John Wiley & Sons Ltd.
-
Cooper, D.F., S. Grey, G. Raymond, P. Walker, "Project riskmanagement guidelines: managing risk in large projects and complexprocurements", John Wiley & Sons Ltd., 2005.
-
(2005)
Project Risk Management Guidelines: Managing Risk in Large Projects andComplex Procurements
-
-
Cooper, D.F.1
Grey, S.2
Raymond, G.3
Walker, P.4
-
6
-
-
0003486293
-
-
nd edition, John Wiley and Sons Ltd.
-
Chapman, C, S. Ward, "Project risk management: processes, techniquesand insights", 2nd edition, John Wiley and Sons Ltd., 2004.
-
(2004)
Project Risk Management: Processes, Techniques and Insights
-
-
Chapman, C.1
Ward, S.2
-
7
-
-
0035313962
-
"The controlling influences on effective risk identification andassessment for construction design management", International
-
Chapman, R., "The controlling influences on effective riskidentification and assessment for construction design management", International Journal of Project Management, Vol.19, No.6, pp147-160, 1999.
-
(1999)
Journal of Project Management
, vol.19
, Issue.6
, pp. 147-160
-
-
Chapman, R.1
-
8
-
-
62749188371
-
Fuzzy group decision making: A case using FTOPSIS in mega project riskidentification and analysis concurrently
-
Singapore
-
Mojtahedi, S.M.H., S.M. Mousavi, A. Aminian, "Fuzzy group decisionmaking: A case using FTOPSIS in mega project risk identification and analysisconcurrently", The 5th of IEEE International Conference on IndustrialEngineering and Engineering Management, Singapore, 2008.
-
(2008)
th of IEEE International Conference on IndustrialEngineering and Engineering Management
-
-
Mojtahedi, S.M.H.1
Mousavi, S.M.2
Aminian, A.3
-
9
-
-
62749109410
-
A fuzzy BOT project risk evaluation model in iranian power plant industry
-
Singapore
-
Ebrahimnejad, S., S.M. Mousavi, S.M.H. Mojtahedi, "A fuzzy BOTproject risk evaluation model in iranian power plant industry", The 5th ofIEEE International Conference on Industrial Engineering and EngineeringManagement, Singapore, 2008.
-
(2008)
th of IEEE International Conference on IndustrialEngineering and Engineering Management
-
-
Ebrahimnejad, S.1
Mousavi, S.M.2
Mojtahedi, S.M.H.3
-
10
-
-
0001610304
-
Notes on bias in estimation
-
Quenouille, M.H., "Notes on bias in estimation", Biometrika,Vol.43, pp353-360, 1956.
-
(1956)
Biometrika
, vol.43
, pp. 353-360
-
-
Quenouille, M.H.1
-
11
-
-
0001617782
-
Bias and confidence in not-quite large samples
-
Tukey, J.W., "Bias and confidence in not-quite large samples",Ann. Math Stat, Vol.29, pp614, 1958.
-
(1958)
Ann. Math Stat
, vol.29
, pp. 614
-
-
Tukey, J.W.1
-
12
-
-
0000930638
-
An Unbalanced Jackknife
-
Miller, R.G., "An Unbalanced Jackknife", Ann. Statist,.Vol. 2,pp880-891, 1974.
-
(1974)
Ann. Statist
, vol.2
, pp. 880-891
-
-
Miller, R.G.1
-
13
-
-
0002718318
-
Approximate tests of correlation in time series
-
Quenouille, M., "Approximate tests of correlation in timeseries", J. Royal. Statist. Soc, Vol.11, pp 18-44, 1949.
-
(1949)
J. Royal. Statist. Soc
, vol.11
, pp. 18-44
-
-
Quenouille, M.1
-
14
-
-
0003421415
-
The Jacknife, the bootstrap, and other resampling Plans
-
Efron, B., "The Jacknife, the Bootstrap, and other resamplingPlans", Society for Industrial and Applied Mathematics, CBMSNSF regionalconference series in applied mathematics, Vol.38, 1983.
-
(1983)
Society for Industrial and Applied Mathematics, CBMSNSF RegionalConference Series in Applied Mathematics
, vol.38
-
-
Efron, B.1
-
15
-
-
0035480039
-
Jacknife and Bootstrap methods in the identification of dynamic models
-
Duchesne, C, J.F. MacGregor, "Jacknife and Bootstrap methods in theidentification of dynamic models", Journal of Process Control, Vol.11,pp.553-564, 2001.
-
(2001)
Journal of Process Control
, vol.11
, pp. 553-564
-
-
Duchesne, C.1
MacGregor, J.F.2
-
16
-
-
85018505033
-
A guide to the project management body of knowledge
-
rd ed., USA, Project Management Institute Inc
-
PMI, "A guide to the project management body of knowledge", PMBOK Guide, 3rd ed., USA, Project Management Institute Inc., 2004.
-
(2004)
PMBOK Guide
-
-
-
17
-
-
85088737691
-
-
th ed., Oxford: Blackwell Science Ltd.
-
Armitage, P., G Berry, J.N.S. Matthews, "Statistical methods inmedical research", 4th ed., Oxford: Blackwell Science Ltd., pp. 1-817,2002.
-
(2002)
Statistical Methods in Medical Research
, pp. 1-817
-
-
Armitage, P.1
Berry, G.2
Matthews, J.N.S.3
-
18
-
-
0001514453
-
A general theory for jackknife variance estimation
-
Shao, J., CF.J. Wu, "A general theory for jackknife varianceestimation", Ann. Statist., Vol.17, pp1176-1197, 1989.
-
(1989)
Ann. Statist
, vol.17
, pp. 1176-1197
-
-
Shao, J.1
Wu, C.F.J.2
-
19
-
-
84948493784
-
Jackknifing in Unbalanced situations
-
Hinkley, D.V., "Jackknifing in Unbalanced situations", Techometrics, Vol.19, pp.285-292, 1977.
-
(1977)
Techometrics
, vol.19
, pp. 285-292
-
-
Hinkley, D.V.1
|