-
1
-
-
0033726367
-
High performance computing for large-scale analysis, optimization, and control
-
Adeli, H. (2000). "High performance computing for large-scale analysis, optimization, and control." J. Aerosp. Eng., 13(1), 1-10.
-
(2000)
J. Aerosp. Eng.
, vol.13
, Issue.1
, pp. 1-10
-
-
Adeli, H.1
-
2
-
-
0000191706
-
Scheduling/cost optimization and neural dynamics model for construction projects
-
Adeli, H., and Karim, A. (1997). "Scheduling/cost optimization and neural dynamics model for construction projects." J. Constr. Eng. Manage., 123(4), 450-458.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.4
, pp. 450-458
-
-
Adeli, H.1
Karim, A.2
-
3
-
-
0033947079
-
Parallel computing in water network analysis and leakage minimization
-
Alonso, J., et al. (2000). "Parallel computing in water network analysis and leakage minimization." J. Water Resour. Plan. Manage., 126(4), 251-260.
-
(2000)
J. Water Resour. Plan. Manage.
, vol.126
, Issue.4
, pp. 251-260
-
-
Alonso, J.1
-
4
-
-
0034230332
-
Distributed genetic algorithm model on network of personal computers
-
Balla, M., and Lingireddy, S. (2000). "Distributed genetic algorithm model on network of personal computers." J. Comput. Civ. Eng., 14(3), 199-205.
-
(2000)
J. Comput. Civ. Eng.
, vol.14
, Issue.3
, pp. 199-205
-
-
Balla, M.1
Lingireddy, S.2
-
5
-
-
4544318435
-
The LP/IP hybrid method for construction time-cost trade-off analysis
-
Burns, S., Liu, L., and Feng, C. (1996). "The LP/IP hybrid method for construction time-cost trade-off analysis." Constr. Mgt. Econ., 14, 265-276.
-
(1996)
Constr. Mgt. Econ.
, vol.14
, pp. 265-276
-
-
Burns, S.1
Liu, L.2
Feng, C.3
-
6
-
-
77955879410
-
A survey of parallel genetic algorithms
-
Illinois Genetic Algorithms Laboratory, University of Illinois at Urbana Champaign, Urbana, Ill.
-
Cantú-Paz, E. (1997). "A survey of parallel genetic algorithms." ILLGAL Rep. No. 97003, Illinois Genetic Algorithms Laboratory, University of Illinois at Urbana Champaign, Urbana, Ill.
-
(1997)
ILLGAL Rep. No. 97003
-
-
Cantú-Paz, E.1
-
8
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W.-T., Chua, D. K. H., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.-T.1
Chua, D.K.H.2
Kannan, G.3
-
9
-
-
23244436354
-
-
Computation Science and Engineering Program (CSE), University of Illinois at Urbana Champaign. (2003). "The Turing Linux cluster." 〈http://turing.cse.uiuc.edu〉.
-
(2003)
The Turing Linux Cluster
-
-
-
11
-
-
0004095338
-
A fast elitist non-dominated sorting genetic algorithm for multi-objective optimi zation
-
Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India
-
Deb, K., Agrawal, S., Pratap, A., and Meyarivan, T. (2001). "A fast elitist non-dominated sorting genetic algorithm for multi-objective optimi zation." KANGAL Rep. 200001, Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India.
-
(2001)
KANGAL Rep. 200001
-
-
Deb, K.1
Agrawal, S.2
Pratap, A.3
Meyarivan, T.4
-
12
-
-
0033909266
-
A distributed implementation of an adaptive finite element method for fluid problems
-
De Santiago, E., and Law, K. H. (2000). "A distributed implementation of an adaptive finite element method for fluid problems." Comput. Struct., 74(1), 97-119.
-
(2000)
Comput. Struct.
, vol.74
, Issue.1
, pp. 97-119
-
-
De Santiago, E.1
Law, K.H.2
-
13
-
-
0035392410
-
Optimum planning of highway construction under the A+B bidding method
-
El-Rayes, K. (2001). "Optimum planning of highway construction under the A+B bidding method." J. Constr. Eng. Manage., 127(4), 261-269.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 261-269
-
-
El-Rayes, K.1
-
14
-
-
15944361924
-
Time-cost-quality trade off analysis for highway construction
-
El-Rayes, K., and Kandil, A. (2005). "Time-cost-quality trade off analysis for highway construction." J. Constr. Eng. Manage., 131(4), 477-486.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 477-486
-
-
El-Rayes, K.1
Kandil, A.2
-
15
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
El-Rayes, K., and Moselhi, O. (2001). "Optimizing resource utilization for repetitive construction projects." J. Constr. Eng. Manage., 127(1), 18-27.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
16
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C., Liu, L., and Burns, S. A. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.1
Liu, L.2
Burns, S.A.3
-
17
-
-
0034172005
-
Stochastic construction time-cost trade-off analysis
-
Feng, C., Liu, L., and Burns, S. (2000). "Stochastic construction time-cost trade-off analysis." J. Comput. Civ. Eng., 14(2), 117-126.
-
(2000)
J. Comput. Civ. Eng.
, vol.14
, Issue.2
, pp. 117-126
-
-
Feng, C.1
Liu, L.2
Burns, S.3
-
20
-
-
0003417931
-
-
Massachusetts Institute of Technology, Cambridge, Mass.
-
Gropp, W., Lusk, E., and Thakur, R. (1999). Using MPI-2: Advanced features of the message passing interface, Massachusetts Institute of Technology, Cambridge, Mass.
-
(1999)
Using MPI-2: Advanced Features of the Message Passing Interface
-
-
Gropp, W.1
Lusk, E.2
Thakur, R.3
-
21
-
-
13944255840
-
Genetic optimization for dynamic project control
-
Hegazy, T., and Petzold, K. (2003). "Genetic optimization for dynamic project control." J. Constr. Eng. Manage., 129(4), 396-404.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.4
, pp. 396-404
-
-
Hegazy, T.1
Petzold, K.2
-
22
-
-
4344619377
-
MOGADES: Multi-objective genetic algorithm with distributed environment scheme
-
Doshisha University, Kyoto, Japan
-
Hiroyashu, T., Miki, M., Watanabe, S., Kamiura, J., and Okuda, T. (2002). "MOGADES: Multi-objective genetic algorithm with distributed environment scheme." Special Rep., Doshisha University, Kyoto, Japan.
-
(2002)
Special Rep.
-
-
Hiroyashu, T.1
Miki, M.2
Watanabe, S.3
Kamiura, J.4
Okuda, T.5
-
23
-
-
0032670219
-
CONSCOM: An 00 construction scheduling and change management system
-
Karim, A., and Adeli, H. (1999). "CONSCOM: An 00 construction scheduling and change management system." J. Constr. Eng. Manage., 125(5), 368-376.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 368-376
-
-
Karim, A.1
Adeli, H.2
-
24
-
-
0032638332
-
Using machine learning and GA to solve time-cost trade-off problems
-
Li, H., Cao, J.-N., and Love, P. E. D. (1999). "Using machine learning and GA to solve time-cost trade-off problems." J. Constr. Eng. Manage., 125(5), 347-353.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.-N.2
Love, P.E.D.3
-
25
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
Li, H., and Love, P. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr. Eng. Manage., 123(3), 233-237.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
26
-
-
0035279805
-
Project management in construction: Software use and research directions
-
Liberatore, M., Pollack-Johnson, B., and Smith, C. (2001). "Project management in construction: Software use and research directions." J. Constr. Eng. Manage., 127(2), 101-107.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.2
, pp. 101-107
-
-
Liberatore, M.1
Pollack-Johnson, B.2
Smith, C.3
-
27
-
-
0009613182
-
A user's guide to MPI
-
Dept. of Mathematics, University of San Francisco, San Francisco
-
Pacheco, P. S. (1998). "A user's guide to MPI." Technical Rep., Dept. of Mathematics, University of San Francisco, San Francisco.
-
(1998)
Technical Rep.
-
-
Pacheco, P.S.1
-
30
-
-
0003710740
-
-
Massachusetts Institute of Technology, Cambridge, Mass.
-
Snir, M., Otto, S., Huss-Lederman, S., Walker, D., and Dongarra, J. (1998). MPI: The complete reference. Volume 1: The MPI core, Massachusetts Institute of Technology, Cambridge, Mass.
-
(1998)
MPI: the Complete Reference. Volume 1: The MPI Core
, vol.1
-
-
Snir, M.1
Otto, S.2
Huss-Lederman, S.3
Walker, D.4
Dongarra, J.5
-
31
-
-
0034172257
-
Transient dynamic nonlinear analysis using MIMD computer architectures
-
Sziveri, J., and Topping, B. H. V. (2000). "Transient dynamic nonlinear analysis using MIMD computer architectures." J. Comput. Civ. Eng., 14(2), 79-91.
-
(2000)
J. Comput. Civ. Eng.
, vol.14
, Issue.2
, pp. 79-91
-
-
Sziveri, J.1
Topping, B.H.V.2
-
32
-
-
0036160726
-
Parallelization strategies for element-by-element preconditioned conjugate gradient solver using high performance Fortran for unstructured finite-element applications on Linux clusters
-
Thiagarajan, G., and Aravamuthan, V. (2002). "Parallelization strategies for element-by-element preconditioned conjugate gradient solver using high performance Fortran for unstructured finite-element applications on Linux clusters." J. Comput. Civ. Eng., 16(1), 1-10.
-
(2002)
J. Comput. Civ. Eng.
, vol.16
, Issue.1
, pp. 1-10
-
-
Thiagarajan, G.1
Aravamuthan, V.2
-
33
-
-
23244439548
-
Parallel evolutionary multi-criterion optimization for block layout problems
-
Doshisha University, Kyoto, Japan
-
Watanabe, S., Hiroyashu, T., and Miki, M. (2002). "Parallel evolutionary multi-criterion optimization for block layout problems." Special Rep., Doshisha University, Kyoto, Japan.
-
(2002)
Special Rep.
-
-
Watanabe, S.1
Hiroyashu, T.2
Miki, M.3
-
34
-
-
1642474729
-
SPEA2: Improving the strength Pareto evolutionary algorithm
-
Swiss Federal Institute of Technology, Zurich, Switzerland
-
Zitzler, E., Laumanns, M., and Thiele, L. (2001). "SPEA2: Improving the strength Pareto evolutionary algorithm." TIK-Rep. 103, Swiss Federal Institute of Technology, Zurich, Switzerland.
-
(2001)
TIK-Rep.
, vol.103
-
-
Zitzler, E.1
Laumanns, M.2
Thiele, L.3
|