-
1
-
-
39749159847
-
Optimízation of cost and downtime for replacement model following the expiration of warranty
-
Mun Jung Ki, Sung Sil Han and Dong Ho Park, Optimízation of cost and downtime for replacement model following the expiration of warranty, Reliab Eng Sys Safety, 93 (2008) 995-1003.
-
(2008)
Reliab. Eng. Sys. Safety
, vol.93
, pp. 995-1003
-
-
Ki, M.J.1
Han, S.S.2
Park, D.H.3
-
2
-
-
0035479768
-
Optimizing preventive maintenance for mechanical components Using genetic algorithms
-
Tsai Y-T, Wang K-S and Teng H-Y, Optimizing preventive maintenance for mechanical components using genetic algorithms, Reliab Eng Sys Safety, 74 (2001) 89-97.
-
(2001)
Reliab. Eng. Sys. Safety
, vol.74
, pp. 89-97
-
-
Tsai, Y.-T.1
Wang, K.-S.2
Teng, H.-Y.3
-
3
-
-
0022706987
-
An algorithm for preventive maintenance policy
-
Lie C H and Chun Y H, An algorithm for preventive maintenance policy, IEEE Trans Reliab, 35 (1986) 71-75.
-
(1986)
IEEE Trans. Reliab.
, vol.35
, pp. 71-75
-
-
Lie, C.H.1
Chun, Y.H.2
-
4
-
-
0026837810
-
Cost optimization of maintenance scheduling for a system with assured reliability
-
Jayabalan V and Chudhuri D, Cost optimization of maintenance scheduling for a system with assured reliability, IEEE Trans Reliab, 41 (1992) 21-25.
-
(1992)
IEEE Trans. Reliab.
, vol.41
, pp. 21-25
-
-
Jayabalan, V.1
Chudhuri, D.2
-
5
-
-
0002362385
-
Optimum preventive maintenance policies
-
Barlow R E and Hunter L C, Optimum preventive maintenance policies, Oper Res, 8 (1960) 90-100.
-
(1960)
Oper. Res.
, vol.8
, pp. 90-100
-
-
Barlow, R.E.1
Hunter, L.C.2
-
6
-
-
0001178588
-
A generalized age and block replacement of a system subject to shocks
-
Sheu S-H, A generalized age and block replacement of a system subject to shocks, Euro J Opel Res, 108 (1998) 345-362.
-
(1998)
Euro. J. Opel. Res.
, vol.108
, pp. 345-362
-
-
S-H, S.1
-
8
-
-
0020792814
-
Optimum replacement of a system subject to shocks
-
(Pubitemid 13605209) Boland P J and Proschan F, Optimum replacement of a system subject to shocks, Oper Res, 31 (1983) 697-704.
-
(1983)
Oper. Res.
, vol.31
, pp. 697-704
-
-
Boland, P.J.1
Proschan, F.2
-
10
-
-
0032630496
-
A bayesian perspective on age replacement with minimal repair
-
Sheu S H, Yeh R H, Lin Y B and Juang M G, A Bayesian perspective on age replacement with minimal repair, Reliab Eng Syst Safety, 65 (1999) 55-64.
-
(1999)
Reliab. Eng. Syst. safety
, vol.65
, pp. 55-64
-
-
Sheu, S.H.1
Yeh, R.H.2
Lin, Y.B.3
Juang, M.G.4
-
11
-
-
0034702119
-
Optimal replacement policy for a cumulative damage model with time deterioration
-
(Pubitemid 30368874) Satow T K, Teramoto, S and Nakagawa T, Optimal replacement policy for a cumulative damage model with time deterioration,. Math Comp Modeling, 31 (2000) 313-319.
-
(2000)
Math Comp. Modeling
, vol.31
, pp. 313-319
-
-
Satow, T.K.1
Teramoto, S.2
Nakagawa, T.3
-
12
-
-
0242494867
-
Replacement and minimal repair policies for a cumulative damage model with maintenance
-
Qian C, Nakamura S and Nakagawa T, Replacement and minimal repair policies for a cumulative damage model with maintenance, Comp Math with Appl, 46 (2003) 1111-1118.
-
(2003)
Comp. Math with Appl.
, vol.46
, pp. 1111-1118
-
-
Qian, C.1
Nakamura, S.2
Nakagawa, T.3
-
13
-
-
1642388569
-
A heuristic algorithm for determining replacement policies in consecutive k-out-of-n systems
-
Flynn J and Chung C-S, A heuristic algorithm for determining replacement policies in consecutive k-out-of-n systems, Comp Oper Res, 31 (2004) 1335-1348.
-
(2004)
Comp. Oper. Res.
, vol.31
, pp. 1335-1348
-
-
Flynn, J.1
Chung, C.-S.2
-
14
-
-
0020252462
-
Fast solutions for consecutive k-out-of-n: F system
-
Hwang F K, Fast solutions for consecutive k-out-of-n: F system, IEEE Trans Reliab, 31 (1982) 447-448.
-
(1982)
IEEE Trans. Reliab.
, vol.31
, pp. 447-448
-
-
Hwang, F.K.1
-
15
-
-
0018479619
-
Optimal number of minimal repairs before replacement
-
Park K S, Optimal number of minimal repairs before replacement, IEEE Trans Reliab, 28 (1979) 137-140.
-
(1979)
IEEE Trans. Reliab.
, vol.28
, pp. 137-140
-
-
Park, K.S.1
-
16
-
-
0002192597
-
Some results for repairable system with general repair
-
Kijima M, Some results for repairable system with general repair, J Appl Probab, 26 (1989) 89-102.
-
(1989)
J. Appl. Probab.
, vol.26
, pp. 89-102
-
-
Kijima, M.1
-
17
-
-
0027641904
-
A note on optimal replacement policy under general repay
-
(Pubitemid 23713204) Makis V and Jardine A, A note on optimal replacement policy under general repay, Euro J Oper Res, 69 (1993) 75-82.
-
(1993)
Euro. J. Oper. Res.
, vol.69
, pp. 75-82
-
-
Makis, V.1
Jardine, A.2
-
19
-
-
0030656766
-
Optimal replacement policy and the structure of software for condition-based maintenance
-
Jardine A K S, Banjevic D and Makis V, Optimal replacement policy and the structure of software for condition-based maintenance, J Qual Maintenance Eng, 2 (1997) 109-119.
-
(1997)
J. Qual. Maintenance Eng.
, vol.2
, pp. 109-119
-
-
Jardine, A.K.S.1
Banjevic, D.2
Makis, V.3
-
20
-
-
0033701507
-
A discrete semi-markov decision model to determine the optimal repair/replacement policy under general repairs
-
Love C E, Zhang Z G, Zitron M A and Guo R, A discrete semi-Markov decision model to determine the optimal repair/replacement policy under general repairs, Euro J Oper Res, 125 (2000) 398-409.
-
(2000)
Euro. J. Oper. Res.
, vol.125
, pp. 398-409
-
-
Love, C.E.1
Zhang, Z.G.2
Zitron, M.A.3
Guo, R.4
-
21
-
-
0036504803
-
Optimal replacement policy for a multistate repairable system
-
Zhang Y L, Yam R C M and Zuo M J, Optimal replacement policy for a multistate repairable system, J Oper Res Soc, 53 (2002) 336-341.
-
(2002)
J. Oper Res. Soc.
, vol.53
, pp. 336-341
-
-
Zhang, Y.L.1
Yam, R.C.M.2
Zuo, M.J.3
-
22
-
-
33845777427
-
A bivariate optimal replacement policy for a multistate repairable system
-
(Pubitemid 46001571) Zhang Y L, Yam R C M and Zuo M J, A bivariate optimal replacement policy for a multistate repairable system, Reliab Eng Sys Safety, 92 (2007) 535-542.
-
(2007)
Reliab. Eng. Sys. Safety
, vol.92
, pp. 535-542
-
-
Zhang, Y.L.1
Yam, R.C.M.2
Zuo, M.J.3
-
23
-
-
0022784147
-
Optimum replacement of a system subject to shocks: A mathematical lemma
-
(Pubitemid 17590495) Puri P S and Singh H, Optimum replacement of a system subject to shocks: a mathematical lemma, Oper Res, 34 (1986) 782-789.
-
(1986)
Oper. Res.
, vol.34
, pp. 782-789
-
-
Puri, P.S.1
Singh, H.2
-
24
-
-
0003373474
-
Periodic preventive maintenance policies following the expiration of warranty
-
Jung G M, Lee J H and Park D H, Periodic preventive maintenance policies following the expiration of warranty, Asia-Pac J Oper Res, 17 (2000) 17-26.
-
(2000)
Asia-Pac. J. Oper. Res.
, vol.17
, pp. 17-26
-
-
Jung, G.M.1
Lee, J.H.2
Park, D.H.3
-
25
-
-
29344441274
-
Study of the optimal used period and number of minimal repairs of a repairable product after the warranty expires
-
Jhang J P A, study of the optimal used period and number of minimal repairs of a repairable product after the warranty expires, Int J Syst Sci, 36 (2005) 697-704.
-
(2005)
Int. J. Syst. Sci.
, vol.36
, pp. 697-704
-
-
Jhang, J.P.A.1
-
26
-
-
0035546214
-
Optimal just-in-time buffer inventory for regular preventive maintenance
-
Salameh M K & Ghattas R E, Optimal just-in-time buffer inventory for regular preventive maintenance, Int J Prod Econ, 74 (2001) 157-161.
-
(2001)
Int J. Prod. Econ.
, vol.74
, pp. 157-161
-
-
Salameh, M.K.1
Ghattas, R.E.2
-
27
-
-
0037278646
-
Hierarchical control of production and maintenance rates in manufacturing systems
-
Kenne J P and Boukas E K, Hierarchical control of production and maintenance rates in manufacturing systems, J Qual Maintenance Eng, 9 (2003) 66-82.
-
(2003)
J. Qual. Maintenance Eng.
, vol.9
, pp. 66-82
-
-
Kenne, J.P.1
Boukas, E.K.2
-
28
-
-
15344350551
-
Maintenance scheduling and production control of multiple-machine manufacturing systems
-
Gharbi A and Kenne J P, Maintenance scheduling and production control of multiple-machine manufacturing systems, Comp Ind Eng, 48 (2005) 693-707.
-
(2005)
Comp. Ind. Eng.
, vol.48
, pp. 693-707
-
-
Gharbi, A.1
Kenne, J.P.2
-
29
-
-
0036604021
-
Age replacement policy: A multi-attribute value model
-
Jiang R and Ji P, Age replacement policy: a multi-attribute value model, Reliab Eng Sys Safety, 76 (2002) 311-318.
-
(2002)
Reliab. Eng. Sys. Safety
, vol.76
, pp. 311-318
-
-
Jiang, R.1
Ji, P.2
-
30
-
-
0031707966
-
Some aspects of measuring maintenance performance in the process industry
-
Arts R H P M, Knapp G M and Mann Jr L, Some aspects of measuring maintenance performance in the process industry, J Qual Maintenance Eng, 4 (1998) 6-11.
-
(1998)
J. Qual. Maintenance Eng.
, vol.4
, pp. 6-11
-
-
Arts, R.H.P.M.1
Knapp, G.M.2
Mann Jr., L.3
-
31
-
-
0031062254
-
Concepts for measuring maintenance performance and methods for analyzing competing failure modes
-
(Pubitemid 127380851) Cooke R and Paulsen J, Concepts for measuring maintenance performance and methods for analyzing competing failure modes, Reliab Eng Sys Safety, 55 (1997) 135-141.
-
(1997)
Reliab. Eng. Sys. Safety
, vol.55
, pp. 135-141
-
-
Cooke, R.1
Paulsen, J.2
|