-
1
-
-
0024944070
-
AHGR, Single-machine flow-time scheduling with a single breakdown
-
Adiri, L, Bruno, J., Frostig, E. and Rinnoay Kan, A.H.G., AHGR, Single-machine flow-time scheduling with a single breakdown. Acta Informatics, 1989, 26, 679-696.
-
(1989)
Acta Informatics
, vol.26
, pp. 679-696
-
-
Adiri, L.1
Bruno, J.2
Frostig, E.3
Rinnoay Kan, A.H.G.4
-
2
-
-
2342558624
-
Scheduling with tool changes to minimize total completion time: Basic results and SPT performance
-
Akturk, M.S., Ghosh, J.B. and Gunes, E.D., Scheduling with tool changes to minimize total completion time: basic results and SPT performance. Eur. J. Oper. Res., 2004, 157, 784-790.
-
(2004)
Eur. J. Oper. Res
, vol.157
, pp. 784-790
-
-
Akturk, M.S.1
Ghosh, J.B.2
Gunes, E.D.3
-
3
-
-
33947281650
-
Machining conditions-based preventive maintenance
-
Akturk, M.S. and Gurel, S., Machining conditions-based preventive maintenance. Int. J. Prod. Res., 2007, 45, 1725-1743.
-
(2007)
Int. J. Prod. Res
, vol.45
, pp. 1725-1743
-
-
Akturk, M.S.1
Gurel, S.2
-
5
-
-
0038813446
-
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
-
Cassady, C.R. and Kutanoglu, E., Minimizing job tardiness using integrated preventive maintenance planning and production scheduling. IIE Trans., 2003, 35, 503-513.
-
(2003)
IIE Trans
, vol.35
, pp. 503-513
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
6
-
-
22444439337
-
Integrating preventive maintenance planning and production scheduling for a single machine
-
Cassady, C.R. and Kutanoglu, E., Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Trans. Reliabil., 2005, 54, 304-309.
-
(2005)
IEEE Trans. Reliabil
, vol.54
, pp. 304-309
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
7
-
-
0032671338
-
Scheduling maintenance and semi-resumable jobs on a single machine
-
Graves, G.H. and Lee, C.Y., Scheduling maintenance and semi-resumable jobs on a single machine. Nav. Res. Logist., 1999, 46, 845-863.
-
(1999)
Nav. Res. Logist
, vol.46
, pp. 845-863
-
-
Graves, G.H.1
Lee, C.Y.2
-
8
-
-
13544266187
-
Multicriteria scheduling
-
Hoogeveen, H., Multicriteria scheduling. Eur. J. Oper. Res., 2005,167, 592-623.
-
(2005)
Eur. J. Oper. Res
, vol.167
, pp. 592-623
-
-
Hoogeveen, H.1
-
9
-
-
33847041127
-
Integrated decision-support system for diagnosis, maintenance planning, and scheduling of manufacturing systems
-
Jeong, I.J., Leon, V.J. and Villalobos, J.R., Integrated decision-support system for diagnosis, maintenance planning, and scheduling of manufacturing systems. Int. J. Prod. Res., 2006, 45, 267-285.
-
(2006)
Int. J. Prod. Res
, vol.45
, pp. 267-285
-
-
Jeong, I.J.1
Leon, V.J.2
Villalobos, J.R.3
-
10
-
-
13544276185
-
A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
-
Kayan, R.K. and Akturk, M.S., A new bounding mechanism for the CNC machine scheduling problems with controllable processing times. Eur. J. Oper. Res., 2005, 167, 624-643.
-
(2005)
Eur. J. Oper. Res
, vol.167
, pp. 624-643
-
-
Kayan, R.K.1
Akturk, M.S.2
-
11
-
-
27744578861
-
Integrated process control and condition-based maintenance scheduler for distributed manufacturing control systems
-
Koomsap, P., Shaikh, N.I. and Prabhu, V.V., Integrated process control and condition-based maintenance scheduler for distributed manufacturing control systems. Int. J. Prod. Res., 2005, 43, 1625-1641.
-
(2005)
Int. J. Prod. Res
, vol.43
, pp. 1625-1641
-
-
Koomsap, P.1
Shaikh, N.I.2
Prabhu, V.V.3
-
12
-
-
29144471680
-
Machine scheduling with availability constraints
-
CRC Press: USA
-
Lee, C.Y., Machine scheduling with availability constraints. Handbook of Scheduling, pp. 1-22, 2004 (CRC Press: USA).
-
(2004)
Handbook of Scheduling
, pp. 1-22
-
-
Lee, C.Y.1
-
13
-
-
0035200203
-
Machine scheduling with a rate modifying activity
-
Lee, C.Y. and Leon, V.J., Machine scheduling with a rate modifying activity. Eur. J. Oper. Res., 2001, 128, 119-128.
-
(2001)
Eur. J. Oper. Res
, vol.128
, pp. 119-128
-
-
Lee, C.Y.1
Leon, V.J.2
-
14
-
-
0026897390
-
Single machine flow-time scheduling with scheduled maintenance
-
Lee, C.Y. and Liman, S.D., Single machine flow-time scheduling with scheduled maintenance. Acta Informatica, 1992, 29, 375-382.
-
(1992)
Acta Informatica
, vol.29
, pp. 375-382
-
-
Lee, C.Y.1
Liman, S.D.2
-
15
-
-
0023844415
-
Filtered beam search in scheduling
-
Ow, P.S. and Morton, T.E., Filtered beam search in scheduling. Int. J. Prod. Res., 1988, 26, 35-62.
-
(1988)
Int. J. Prod. Res
, vol.26
, pp. 35-62
-
-
Ow, P.S.1
Morton, T.E.2
-
16
-
-
33751164384
-
A note on worst-case performance of heuristics for maintenance scheduling problems
-
Qi, X., A note on worst-case performance of heuristics for maintenance scheduling problems. Discr. Appl. Math., 2007, 155, 416-422.
-
(2007)
Discr. Appl. Math
, vol.155
, pp. 416-422
-
-
Qi, X.1
-
17
-
-
0033446820
-
Scheduling the maintenance on a single machine
-
Qi, X., Chen, T. and Tu, F., Scheduling the maintenance on a single machine. J. Oper. Res. Soc., 1999, 50, 1071-1078.
-
(1999)
J. Oper. Res. Soc
, vol.50
, pp. 1071-1078
-
-
Qi, X.1
Chen, T.2
Tu, F.3
|