메뉴 건너뛰기




Volumn 150, Issue 1, 2005, Pages 53-76

Erratum to "On computing the latest starting times and floats of activities in a network with imprecise durations" [Fuzzy Sets and Systems 150 (2005) 53-76] (DOI:10.1016/j.fss.2004.08.007);On computing the latest starting times and floats of activities in a network with imprecise durations

Author keywords

Critical path analysis; Data intervals; Project management and scheduling

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; CRITICAL PATH ANALYSIS; DATA REDUCTION; POLYNOMIALS; PROBLEM SOLVING; PROJECT MANAGEMENT; SCHEDULING;

EID: 11144288983     PISSN: 01650114     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.fss.2007.11.002     Document Type: Erratum
Times cited : (67)

References (21)
  • 5
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in the network with fuzzy activity times
    • S. Chanas, and P. Zieliński Critical path analysis in the network with fuzzy activity times Fuzzy Sets and Systems 122 2001 195 204
    • (2001) Fuzzy Sets and Systems , vol.122 , pp. 195-204
    • Chanas, S.1    Zieliński, P.2
  • 6
    • 0036466460 scopus 로고    scopus 로고
    • The computational complexity of the criticality problems in a network with interval activity times
    • S. Chanas, and P. Zieliński The computational complexity of the criticality problems in a network with interval activity times European J. of Oper. Res. 136 3 2002 541 550
    • (2002) European J. of Oper. Res. , vol.136 , Issue.3 , pp. 541-550
    • Chanas, S.1    Zieliński, P.2
  • 7
    • 0037211593 scopus 로고    scopus 로고
    • On the hardness of evaluating criticality of activities in a planar network with duration intervals
    • S. Chanas, and P. Zieliński On the hardness of evaluating criticality of activities in a planar network with duration intervals Oper. Res. Lett. 31 2003 53 59
    • (2003) Oper. Res. Lett. , vol.31 , pp. 53-59
    • Chanas, S.1    Zieliński, P.2
  • 8
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
    • D. Dubois, H. Fargier, and P. Fortemps Fuzzy scheduling Modelling flexible constraints vs. coping with incomplete knowledge European J. Oper. Res. 147 2003 231 252
    • (2003) European J. Oper. Res. , vol.147 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 9
    • 0037410243 scopus 로고    scopus 로고
    • On latest starting times and floats in activity networks with ill-known durations
    • D. Dubois, H. Fargier, and V. Galvagnon On latest starting times and floats in activity networks with ill-known durations European J. Oper. Res. 147 2003 266 280
    • (2003) European J. Oper. Res. , vol.147 , pp. 266-280
    • Dubois, D.1    Fargier, H.2    Galvagnon, V.3
  • 13
  • 17
    • 0027592830 scopus 로고
    • Using PERT as an Approximation of Fuzzy Project-Network Analysis
    • C.S. McCahon Using PERT as an Approximation of Fuzzy Project-Network Analysis IEEE Trans. Eng. Manage. 40 1993 146 153
    • (1993) IEEE Trans. Eng. Manage. , vol.40 , pp. 146-153
    • McCahon, C.S.1
  • 18
    • 38249030792 scopus 로고
    • Project network analysis with fuzzy activity times
    • C.S. McCahon, and E.S. Lee Project network analysis with fuzzy activity times Comput. Math. Appl. 15 1988 829 838
    • (1988) Comput. Math. Appl. , vol.15 , pp. 829-838
    • McCahon, C.S.1    Lee, E.S.2
  • 20
    • 0001497209 scopus 로고
    • Using fuzzy sets theory in a scheduling problem: A case study
    • H. Prade Using fuzzy sets theory in a scheduling problem a case study Fuzzy Sets and Systems 2 1979 153 165
    • (1979) Fuzzy Sets and Systems , vol.2 , pp. 153-165
    • Prade, H.1
  • 21
    • 0028528165 scopus 로고
    • Network analysis and information flow in fuzzy environment
    • H. Rommelfanger Network analysis and information flow in fuzzy environment Fuzzy Sets and Systems 67 1994 119 128
    • (1994) Fuzzy Sets and Systems , vol.67 , pp. 119-128
    • Rommelfanger, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.