-
1
-
-
72249092997
-
Optimal control of a production inventory system with Weibull distributed deterioration
-
A. Al-Khedhairi and L. Tadj. Optimal control of a production inventory system with Weibull distributed deterioration. Applied Mathematical Sciences, 1(35):1703-1714, 2007.
-
(2007)
Applied Mathematical Sciences
, vol.1
, Issue.35
, pp. 1703-1714
-
-
Al-Khedhairi, A.1
Tadj, L.2
-
2
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
A. Allahverdi, J. N. D. Gupta, and T. Aldowaisan. A review of scheduling research involving setup considerations. Omega, 27(2):219-239, 1999.
-
(1999)
Omega
, vol.27
, Issue.2
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
4
-
-
41149118126
-
Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
-
DOI 10.1016/j.cor.2007.04.003, PII S0305054807000858
-
P. Beraldi, G. Ghiani, A. Grieco, and E. Guerriero. Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs. Computers & Operations Research, 35(11):3644-3656, 2008. (Pubitemid 351443068)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.11
, pp. 3644-3656
-
-
Beraldi, P.1
Ghiani, G.2
Grieco, A.3
Guerriero, E.4
-
5
-
-
0020103083
-
Hierarchical production planning: A two stage system
-
G.R. Bitran, E.A. Haas, and A.C. Hax. Hierarchical production planning: A two stage system. Operations Research, 30:232-251, 1982.
-
(1982)
Operations Research
, vol.30
, pp. 232-251
-
-
Bitran, G.R.1
Haas, E.A.2
Hax, A.C.3
-
6
-
-
33748504144
-
A note on capacitated lot sizing with setup carry over
-
DOI 10.1080/07408170500245562, PII V5V520L346P86711
-
D. Briskorn. A note on capacitated lot sizing with setup carry over. IIE Transactions, 38:1045-1047, 2006. (Pubitemid 44355865)
-
(2006)
IIE Transactions (Institute of Industrial Engineers)
, vol.38
, Issue.11
, pp. 1045-1047
-
-
Briskorn, D.1
-
7
-
-
0141859880
-
A concise survey of scheduling with time-dependent processing times
-
T.C.E. Cheng, Q. Ding, and B.M.T. Lin. A concise survey of scheduling with time-dependent processing times. European Journal of Operational Research, 152(1):1-13, 2004.
-
(2004)
European Journal of Operational Research
, vol.152
, Issue.1
, pp. 1-13
-
-
Cheng, T.C.E.1
Ding, Q.2
Lin, B.M.T.3
-
9
-
-
0011790680
-
An improved algorithm for solving the economic lot size problem (ELSP)
-
S.G. Davis. An improved algorithm for solving the economic lot size problem (ELSP). International Journal of Production Research, 33(4):1007-1026, 1995.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.4
, pp. 1007-1026
-
-
Davis, S.G.1
-
10
-
-
34547145422
-
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups
-
DOI 10.1007/s10732-007-9011-9, Special CLAIO XII Issue on Advances and Applications of Heuristics
-
S. de Araujo, M. Arenales, and A. Clark. Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. Journal of Heuristics, 13(4):337-358, 2007. (Pubitemid 47117880)
-
(2007)
Journal of Heuristics
, vol.13
, Issue.4
, pp. 337-358
-
-
De Araujo, S.A.1
Arenales, M.N.2
Clark, A.R.3
-
12
-
-
84985793300
-
Joint lot sizing and scheduling of multiple items with sequence-dependent setup costs
-
D.M. Dilts and K.D. Ramsing. Joint lot sizing and scheduling of multiple items with sequence-dependent setup costs. Decision Sciences, 20(1):120-133, 1989.
-
(1989)
Decision Sciences
, vol.20
, Issue.1
, pp. 120-133
-
-
Dilts, D.M.1
Ramsing, K.D.2
-
13
-
-
0026895316
-
Cyclic lot scheduling problem with sequence-dependent setups
-
G. Dobson. The cyclic lot scheduling problem with sequence-dependent setups. Operations Research, 40(4):736-749, 1992. (Pubitemid 23581870)
-
(1992)
Operations Research
, vol.40
, Issue.4
, pp. 736-749
-
-
Dobson, G.1
-
14
-
-
0031170482
-
Lot sizing and scheduling - Survey and extensions
-
PII S0377221797000301
-
A. Drexl and A. Kimms. Lot sizing and scheduling - survey and extensions. European Journal of Operational Research, 99:221-235, 1997. (Pubitemid 127418431)
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.2
, pp. 221-235
-
-
Drexl, A.1
Kimms, A.2
-
15
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
S.E. Elmaghraby. The economic lot scheduling problem (ELSP): Review and extensions. Management Science, 24(6):587-598, 1978.
-
(1978)
Management Science
, vol.24
, Issue.6
, pp. 587-598
-
-
Elmaghraby, S.E.1
-
16
-
-
0008655177
-
The general lotsizing and scheduling problem
-
B. Fleischmann and H. Meyr. The general lotsizing and scheduling problem. OR Spectrum, 19(1):11-21, 1997.
-
(1997)
OR Spectrum
, vol.19
, Issue.1
, pp. 11-21
-
-
Fleischmann, B.1
Meyr, H.2
-
17
-
-
0019032810
-
DETERMINISTIC PRODUCTION PLANNING: ALGORITHMS and COMPLEXITY
-
M. Florian, J. K. Lenstra, and A. H. G. Rinnooy Kan. Deterministic production planning: Algorithms and complexity. Management Science, 26(7):669-679, 1980. (Pubitemid 11442296)
-
(1980)
Management Science
, vol.26
, Issue.7
, pp. 669-679
-
-
Florian, M.1
Lenstra, J.K.2
Kan, A.M.G.R.3
-
18
-
-
0035382004
-
A tabu-search heuristic for the capacitated lot-sizing problem with set-up carryover
-
M. Gopalakrishnan, K. Ding, J.-M. Bourjolly, and S. Mohan. A Tabu- Search heuristic for the capacitated lot-sizing problem with set-up carryover. Management Science, 47(6):851-863, 2001. (Pubitemid 34192802)
-
(2001)
Management Science
, vol.47
, Issue.6
, pp. 851-863
-
-
Gopalakrishnan, M.1
Ding, K.2
Bourjolly, J.-M.3
Mohan, S.4
-
19
-
-
0029341661
-
A framework for modelling setup carryover in the capacitated lot sizing problem
-
M. Gopalakrishnan, D. M. Miller, and C. P. Schmidt. A framework for modelling setup carryover in the capacitated lot sizing problem. International Journal of Production Research, 33(7):1973, 1995.
-
(1973)
International Journal of Production Research
, vol.33
, Issue.7
, pp. 1995
-
-
Gopalakrishnan, M.1
Miller, D.M.2
Schmidt, C.P.3
-
20
-
-
5644274147
-
The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
-
D. Gupta and T. Magnusson. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers & Operations Research, 32(4):727-747, 2005.
-
(2005)
Computers & Operations Research
, vol.32
, Issue.4
, pp. 727-747
-
-
Gupta, D.1
Magnusson, T.2
-
21
-
-
21344476870
-
Lotsizing and Scheduling for Production Planning
-
Springer, Berlin et al.
-
K. Haase. Lotsizing and Scheduling for Production Planning, volume 408 of Lecture Notes in Economics and Mathematical Systems. Springer, Berlin et al., 1994.
-
(1994)
Lecture Notes in Economics and Mathematical Systems
, vol.408
-
-
Haase, K.1
-
22
-
-
0010775487
-
Capacitated lot-sizing with sequence dependent setup costs
-
K. Haase. Capacitated lot-sizing with sequence dependent setup costs. OR Spectrum, 18(1):51-59, 1996.
-
(1996)
OR Spectrum
, vol.18
, Issue.1
, pp. 51-59
-
-
Haase, K.1
-
23
-
-
0033690423
-
Lot-sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
-
K. Haase and A. Kimms. Lot-sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. European Journal of Operational Research, 66:159-169, 2000.
-
(2000)
European Journal of Operational Research
, vol.66
, pp. 159-169
-
-
Haase, K.1
Kimms, A.2
-
24
-
-
33748974092
-
The profit maximizing capacitated lot-size (PCLSP) problem
-
DOI 10.1016/j.ejor.2005.08.001, PII S0377221705005898
-
K.K. Haugen, A. Olstad, and B.I. Pettersen. The profit maximizing capacitated lot-size (PCLSP) problem. European Journal of Operational Research, 176(1):165-176, 2007. (Pubitemid 44442708)
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.1
, pp. 165-176
-
-
Haugen, K.K.1
Olstad, A.2
Pettersen, B.I.3
-
25
-
-
31444445264
-
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over
-
DOI 10.1057/palgrave.jors.2601968, PII 2601968
-
B. Karimi, SMT Fatemi Ghomi, and J. M. Wilson. A tabu search heuristic for solving the CLSP with backlogging and set-up carryover. Journal of the Operational Research Society, 57:140-147, 2006. (Pubitemid 43149280)
-
(2006)
Journal of the Operational Research Society
, vol.57
, Issue.2
, pp. 140-147
-
-
Karimi, B.1
Ghomi, S.M.T.F.2
Wilson, J.M.3
-
27
-
-
0033903519
-
Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
-
DOI 10.1016/S0377-2217(99)00159-9
-
H. Meyr. Simultaneous lotsizing and scheduling by combining local search with dual reoptimization. European Journal of Operational Research, 120(2):311-326, 2000. (Pubitemid 30542650)
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 311-326
-
-
Meyr, H.1
-
28
-
-
0029404198
-
Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
-
I.M. Ovacik and R. Uzsoy. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. International Journal of Production Research, 33(11):3173-3192, 1995.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.11
, pp. 3173-3192
-
-
Ovacik, I.M.1
Uzsoy, R.2
-
29
-
-
77953966457
-
Discrete lot-sizing and scheduling including deterioration and perishability constraints
-
Advanced Manufacturing and Sustainable Logistics, Springer Berlin Heidelberg 10.1007/978-3-642-12494-5 31
-
J. Pahl and S. Voß. Discrete lot-sizing and scheduling including deterioration and perishability constraints. In Advanced Manufacturing and Sustainable Logistics, Lecture Notes in Business Information Processing, 46, pages 345-357. Springer Berlin Heidelberg, 2010. 10.1007/978-3-642-12494-5 31.
-
(2010)
Lecture Notes in Business Information Processing
, vol.46
, pp. 345-357
-
-
Pahl, J.1
Voß, S.2
-
30
-
-
29144457726
-
Load dependent lead times - From empirical evidence to mathematical modeling
-
H. Kotzab, S. Seuring, M. Müller, and G. Reiner, editors, Physica, Heidelberg
-
J. Pahl, S. Voß, and D.L. Woodruff. Load dependent lead times - from empirical evidence to mathematical modeling. In H. Kotzab, S. Seuring, M. Müller, and G. Reiner, editors, Research Methodologies in Supply Chain Management, pages 539-554. Physica, Heidelberg, 2005.
-
(2005)
Research Methodologies in Supply Chain Management
, pp. 539-554
-
-
Pahl, J.1
Voß, S.2
Woodruff, D.L.3
-
31
-
-
29144447714
-
Production planning with load dependent lead times
-
DOI 10.1007/s10288-005-0083-9
-
J. Pahl, S. Voß, and D.L. Woodruff. Production planning with load dependent lead times. 4OR: A Quarterly Journal of Operations Research, 3(4):257-302, 2005. (Pubitemid 41806893)
-
(2005)
4OR
, vol.3
, Issue.4
, pp. 257-302
-
-
Pahl, J.1
Voss, S.2
Woodruff, D.L.3
-
32
-
-
84879014514
-
Production planning with deterioration constraints: A survey
-
J.A. Ceroni, editor
-
J. Pahl, S. Voß, and D.L. Woodruff. Production planning with deterioration constraints: A survey. In J.A. Ceroni, editor, The Development of Collaborative Production and Service Systems in Emergent Economies, Proceedings of the 19th International Conference on Production Research, IFPR, Valparaiso, Chile, 2007.
-
The Development of Collaborative Production and Service Systems in Emergent Economies, Proceedings of the 19th International Conference on Production Research, IFPR, Valparaiso, Chile, 2007
-
-
Pahl, J.1
Voß, S.2
Woodruff, D.L.3
-
33
-
-
34250195301
-
Production planning with load dependent lead times: An update of research
-
J. Pahl, S. Voß, and D.L. Woodruff. Production planning with load dependent lead times: An update of research. Annals of Operations Research, 153(1):297-345, 2007.
-
(2007)
Annals of Operations Research
, vol.153
, Issue.1
, pp. 297-345
-
-
Pahl, J.1
Voß, S.2
Woodruff, D.L.3
-
35
-
-
0242301580
-
Multiperiod production planning carrying over set-up time
-
P. Porkka, A. P. J. Vepsäläinen, and M. Kuula. Multiperiod production planning carrying over set-up time. International Journal of Production Research, 41(6):1133-1148, 2003.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.6
, pp. 1133-1148
-
-
Porkka, P.1
Vepsäläinen, A.P.J.2
Kuula, M.3
-
36
-
-
84974861854
-
Integrating scheduling with batching and Lot-Sizing: A review of algorithms and complexity
-
C.N. Potts and L.N. Van Wassenhove. Integrating scheduling with batching and Lot-Sizing: a review of algorithms and complexity. Journal of the Operational Research Society, 43(5):395-406, 1992.
-
(1992)
Journal of the Operational Research Society
, vol.43
, Issue.5
, pp. 395-406
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
38
-
-
67649794649
-
Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over
-
D. Quadt and H. Kuhn. Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over. Naval Research Logistics, 56(4):366-384, 2009.
-
(2009)
Naval Research Logistics
, vol.56
, Issue.4
, pp. 366-384
-
-
Quadt, D.1
Kuhn, H.2
-
40
-
-
0032627684
-
The capacitated lot sizing problem with setup carry-over
-
C.R. Sox and Y. Gao. The capacitated lot sizing problem with setup carry-over. IIE Transactions, 31(2):173-181, 1999.
-
(1999)
IIE Transactions
, vol.31
, Issue.2
, pp. 173-181
-
-
Sox, C.R.1
Gao, Y.2
-
42
-
-
33846273647
-
Economic lot scheduling problem with returns
-
O. Tang and R. Teunter. Economic lot scheduling problem with returns. Production & Operations Management, 15(4):488-497, 2006.
-
(2006)
Production & Operations Management
, vol.15
, Issue.4
, pp. 488-497
-
-
Tang, O.1
Teunter, R.2
-
44
-
-
59549097415
-
A heuristic for the dynamic multilevel capacitated lotsizing problem with linked lotsizes for general product structures
-
H. Tempelmeier and L. Buschkühl. A heuristic for the dynamic multilevel capacitated lotsizing problem with linked lotsizes for general product structures. OR Spectrum, 31:385-404, 2009.
-
(2009)
OR Spectrum
, vol.31
, pp. 385-404
-
-
Tempelmeier, H.1
Buschkühl, L.2
-
45
-
-
0000555407
-
Capacitated lot-sizing with setup times
-
W.W. Trigeiro, L.J. Thomas, and J.O. McClain. Capacitated lot-sizing with setup times. Management Science, 35(3):353-366, 1989.
-
(1989)
Management Science
, vol.35
, Issue.3
, pp. 353-366
-
-
Trigeiro, W.W.1
Thomas, L.J.2
McClain, J.O.3
-
46
-
-
17544378248
-
The effect of expiration dates and perceived risk on purchasing behavior in grocery store perishable categories
-
DOI 10.1509/jmkg.69.2.114.60762
-
M. Tsiros and C.M. Heilman. The effect of expiration dates and perceived risk on purchasing behavior in grocery store perishable categories. Journal of Marketing, 69:114-129, 2005. (Pubitemid 40554522)
-
(2005)
Journal of Marketing
, vol.69
, Issue.2
, pp. 114-129
-
-
Tsiros, M.1
Heilman, C.M.2
-
47
-
-
0031139978
-
MIP modelling of changeovers in production planning and scheduling problems
-
PII S03772217962940
-
L.A. Wolsey. MIP modelling of changeovers in production planning and scheduling problems. European Journal of Operational Research, 99(1):154-165, 1997. (Pubitemid 127443697)
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.1
, pp. 154-165
-
-
Wolsey, L.A.1
-
48
-
-
15244351164
-
The economic lot scheduling problem without capacity constraints
-
DOI 10.1007/s10479-004-5033-y
-
M.-J. Yao. The economic lot scheduling problem without capacity constraints. Annals of Operations Research, 133(1-4):193-205, 2005. (Pubitemid 40389749)
-
(2005)
Annals of Operations Research
, vol.133
, Issue.1-4
, pp. 193-205
-
-
Yao, M.-J.1
-
49
-
-
71349083639
-
Dynamic parallel machine scheduling with sequence-dependent setup-times using an iterated greedy heuristic
-
K.-C Ying and H.-M. Cheng. Dynamic parallel machine scheduling with sequence-dependent setup-times using an iterated greedy heuristic. Expert Systems with Applications, 37(4):2848-2852, 2010.
-
(2010)
Expert Systems with Applications
, vol.37
, Issue.4
, pp. 2848-2852
-
-
Ying, K.-C.1
Cheng, H.-M.2
-
51
-
-
0027625964
-
Production planning and control (PPC) systems including load-oriented order release - Problems and research perspectives
-
DOI 10.1016/0925-5273(93)90085-Y
-
G. Zäpfel and H. Missbauer. Production planning and control (PPC) systems including load-oriented order release - problems and research perspectives. International Journal of Production Economics, 30:107-122, 1993. (Pubitemid 23715802)
-
(1993)
International Journal of Production Economics
, vol.30-31
, pp. 107-122
-
-
Zapfel, G.1
Missbauer, H.2
-
52
-
-
33748492325
-
Scheduling and lot sizing with sequence-dependent setup: A literature review
-
DOI 10.1080/07408170600559706, PII J784373L461611VQ
-
X. Zhu and W.E. Wilhelm. Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions, 38:987-1007, 2006. (Pubitemid 44355862)
-
(2006)
IIE Transactions (Institute of Industrial Engineers)
, vol.38
, Issue.11
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm, W.E.2
-
53
-
-
0002144959
-
Computing optimal lot sizes in the economic lot scheduling problem
-
P.H. Zipkin. Computing optimal lot sizes in the economic lot scheduling problem. Operations Research, 39(1):56-63, 1991.
-
(1991)
Operations Research
, vol.39
, Issue.1
, pp. 56-63
-
-
Zipkin, P.H.1
|