Volumn 12, Issue 1, 2005, Pages 38-51

Bidding ratios to predict highway project costs

Author keywords

Construction industry; Costs; Neural nets; Regression analysis; Roads

Indexed keywords

CIVIL ENGINEERING; CONSTRUCTION INDUSTRY; CORRELATION METHODS; COSTS; HIGHWAY ENGINEERING; LINEARIZATION; MANAGERS; MATHEMATICAL MODELS; NEURAL NETWORKS; PROJECT MANAGEMENT; REGRESSION ANALYSIS; ROADS AND STREETS; STEEL;

EID: 13844297452     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980510576880     Document Type: Article
Times cited : (25)

References (16)
  • 1
    • 0032142404 scopus 로고    scopus 로고
    • Bid awarding systems: An overview
    • Assaf, S.A., Bubshait, A. and Aitah, R. (1998), "Bid awarding systems: an overview", Cost Engineering, Vol. 40 No. 8, pp. 37-9.
    • (1998) Cost Engineering , vol.40 , Issue.8 , pp. 37-39
    • Assaf, S.A.1    Bubshait, A.2    Aitah, R.3
  • 7
    • 0036744325 scopus 로고    scopus 로고
    • Data modeling and the application of a neural network approach to the prediction of total construction costs
    • Emsley, M.W., Lowe, D.J., Duff, A.R., Harding, A. and Hickson, A. (2002), "Data modeling and the application of a neural network approach to the prediction of total construction costs", Construction Management and Economics, Vol. 20 No. 6, pp. 465-72.
    • (2002) Construction Management and Economics , vol.20 , Issue.6 , pp. 465-472
    • Emsley, M.W.1    Lowe, D.J.2    Duff, A.R.3    Harding, A.4    Hickson, A.5
  • 11
  • 12
    • 2142681559 scopus 로고
    • SPSS and Recognition Systems Inc., Chicago, IL
    • SPSS and Recognition Systems (1995), Neural Connection 1.0 Applications Guide, SPSS and Recognition Systems Inc., Chicago, IL.
    • (1995) Neural Connection 1.0 Applications Guide
  • 13
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • Trost, S.M. and Oberlander, G.D. (2003), "Predicting accuracy of early cost estimates using factor analysis and multivariate regression", Journal of Construction Engineering and Management, Vol. 129 No. 2, pp. 198-204.
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlander, G.D.2
  • 14
    • 0036540409 scopus 로고    scopus 로고
    • Predicting completed project cost using bidding data
    • Williams, T. (2002), "Predicting completed project cost using bidding data", Construction Management and Economics, Vol. 20 No. 3, pp. 225-35.
    • (2002) Construction Management and Economics , vol.20 , Issue.3 , pp. 225-235
    • Williams, T.1