-
4
-
-
0040909326
-
Solving tool allocation problem in flexible manufacturing system
-
SK Mukhopadhyay PK Nandi 1999 Solving tool allocation problem in flexible manufacturing system J Ind Eng (India) 80 16 20
-
(1999)
J Ind Eng (India)
, vol.80
, pp. 16-20
-
-
Mukhopadhyay, S.K.1
Nandi, P.K.2
-
5
-
-
0031233993
-
Simultaneous scheduling of work pieces, fixtures and cutting tools with in FMCs
-
0943.90551 10.1080/002075497194552
-
S Rahimifard ST Newman 1997 Simultaneous scheduling of work pieces, fixtures and cutting tools with in FMCs Int J Prod Res 35 9 2379 2396 0943.90551 10.1080/002075497194552
-
(1997)
Int J Prod Res
, vol.35
, Issue.9
, pp. 2379-2396
-
-
Rahimifard, S.1
Newman, S.T.2
-
6
-
-
0032671437
-
Joint lot sizing and tool management in a CNC environment
-
10.1016/S0166-3615(98)00143-2
-
M Selim Akturk O Siraceddin 1999 Joint lot sizing and tool management in a CNC environment Comput Ind Eng 40 61 74 10.1016/S0166-3615(98)00143-2
-
(1999)
Comput Ind Eng
, vol.40
, pp. 61-74
-
-
Selim Akturk, M.1
Siraceddin, O.2
-
7
-
-
0032671434
-
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter
-
10.1109/70.768181
-
H-B Jun Y-D Kim H-W Suh 1999 Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter IEEE Trans Robot Autom 15 3 488 496 10.1109/70.768181
-
(1999)
IEEE Trans Robot Autom
, vol.15
, Issue.3
, pp. 488-496
-
-
Jun, H.-B.1
Kim, Y.-D.2
Suh, H.-W.3
-
8
-
-
33745710990
-
A synthesis of decision models for tool management in automated manufacturing
-
AE Gray A Seidmann KE Stecke 1990 A synthesis of decision models for tool management in automated manufacturing Manag Sci 39 249 567
-
(1990)
Manag Sci
, vol.39
, pp. 249-567
-
-
Gray, A.E.1
Seidmann, A.2
Stecke, K.E.3
-
9
-
-
34249836688
-
Cutting-tool in computer integrated manufacturing
-
10.1007/BF01324882
-
D Veeramani DM Upon MM Barash 1992 Cutting-tool in computer integrated manufacturing Int J Flex Manuf Syst 4 237 265 10.1007/BF01324882
-
(1992)
Int J Flex Manuf Syst
, vol.4
, pp. 237-265
-
-
Veeramani, D.1
Upon, D.M.2
Barash, M.M.3
-
10
-
-
0031275801
-
Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
-
0942.90542 10.1080/002075497194255
-
HK Roh YD Kim 1997 Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter Int J Prod Res 35 11 2989 3003 0942.90542 10.1080/002075497194255
-
(1997)
Int J Prod Res
, vol.35
, Issue.11
, pp. 2989-3003
-
-
Roh, H.K.1
Kim, Y.D.2
-
11
-
-
0027928107
-
Intermediate tool requirement planning for FMS
-
10.1016/0278-6125(94)90013-2
-
SK Kahator LC Leung 1994 Intermediate tool requirement planning for FMS J Manuf Syst 13 1 9 19 10.1016/0278-6125(94)90013-2
-
(1994)
J Manuf Syst
, vol.13
, Issue.1
, pp. 9-19
-
-
Kahator, S.K.1
Leung, L.C.2
-
12
-
-
0027595170
-
Giffler and Thompson algorithm for job shop scheduling is still good for flexible manufacturing systems
-
0775.90217
-
MA Nascimento 1993 Giffler and Thompson algorithm for job shop scheduling is still good for flexible manufacturing systems J Oper Res Soc 44 5 521 524 0775.90217
-
(1993)
J Oper Res Soc
, vol.44
, Issue.5
, pp. 521-524
-
-
Nascimento, M.A.1
-
13
-
-
0000131281
-
Algorithms for solving production scheduling problems
-
0248.90022 10.1287/opre.8.4.487 113721
-
B Giffler GL Thompson 1960 Algorithms for solving production scheduling problems Int J Oper Res 8 487 503 0248.90022 10.1287/opre.8.4.487 113721
-
(1960)
Int J Oper Res
, vol.8
, pp. 487-503
-
-
Giffler, B.1
Thompson, G.L.2
-
14
-
-
0034692672
-
Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach
-
DOI 10.1080/002075400418298
-
MK Tiwari NK Vidyarthi 2000 Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach Int J Prod Res 38 14 3357 3384 1094.90548 10.1080/002075400418298 (Pubitemid 35401964)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.14
, pp. 3357-3384
-
-
Tiwari, M.K.1
Vidyarthi, N.K.2
-
15
-
-
0031070617
-
Joint job/tool scheduling in a FMC with no on-board tool magazine
-
10.1016/S0951-5240(96)00023-7
-
A Agnetis A Alfieri P Brandimarte P Prinsecchi 1997 Joint job/tool scheduling in a FMC with no on-board tool magazine Comput Integr Manuf Syst 10 1 61 68 10.1016/S0951-5240(96)00023-7
-
(1997)
Comput Integr Manuf Syst
, vol.10
, Issue.1
, pp. 61-68
-
-
Agnetis, A.1
Alfieri, A.2
Brandimarte, P.3
Prinsecchi, P.4
-
17
-
-
0037302910
-
Problem difficulty for tabu search in job-shop scheduling
-
1079.90542 10.1016/S0004-3702(02)00363-6
-
J Jean-Paul Watson C Beck AE Howe L Darrell Whitley 2003 Problem difficulty for tabu search in job-shop scheduling Artif Intell 143 2 189 217 1079.90542 10.1016/S0004-3702(02)00363-6
-
(2003)
Artif Intell
, vol.143
, Issue.2
, pp. 189-217
-
-
Jean-Paul Watson, J.1
Beck, C.2
Howe, A.E.3
Darrell Whitley, L.4
-
18
-
-
34250219585
-
A very fast TS/SA algorithm for the job shop scheduling problem
-
DOI 10.1016/j.cor.2006.02.024, PII S0305054806000670
-
CY Zhang PeiGen Li YunQing Rao ZaiLin Guan 2008 A very fast TS/SA algorithm for the job shop scheduling problem Comput Oper Res 35 1 282 294 1149.90345 10.1016/j.cor.2006.02.024 2312271 (Pubitemid 46899361)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.1
, pp. 282-294
-
-
Zhang, C.Y.1
Li, P.2
Rao, Y.3
Guan, Z.4
-
20
-
-
33751191658
-
A hybrid particle swarm optimization for job shop scheduling problem
-
10.1016/j.cie.2006.09.002
-
DY Sha Cheng-Yu Hsu 2006 A hybrid particle swarm optimization for job shop scheduling problem Comput Ind Eng 51 4 791 808 10.1016/j.cie.2006.09.002
-
(2006)
Comput Ind Eng
, vol.51
, Issue.4
, pp. 791-808
-
-
Sha, D.Y.1
Cheng-Yu, H.2
-
21
-
-
59049093735
-
A discrete particle swarm optimization algorithm for scheduling parallel machines
-
10.1016/j.cie.2008.05.007
-
AH Kashan B Karimi 2009 A discrete particle swarm optimization algorithm for scheduling parallel machines Comput Ind Eng 59 216 233 10.1016/j.cie.2008. 05.007
-
(2009)
Comput Ind Eng
, vol.59
, pp. 216-233
-
-
Kashan, A.H.1
Karimi, B.2
-
22
-
-
0030759617
-
Ant colonies for the travelling salesman problem
-
M Dorigo LM Gambardella 1997 Ant colonies for the travelling salesman problem Bio Systems 43 73 81
-
(1997)
Bio Systems
, vol.43
, pp. 73-81
-
-
Dorigo, M.1
Gambardella, L.M.2
-
25
-
-
0003130594
-
Applying the ant system to the vehicle routing problem
-
Blum S. Vo S. Martello I.H. Osman C. Roucairol (eds). Kluwer Boston
-
Bullnheimer B, Hartl RF, Strauss C (1998) Applying the ant system to the vehicle routing problem. In: Vo S, Martello S, Osman IH, Roucairol C (eds) Meta-heuristics: advances and trends in local search paradigms for optimization. Kluwer, Boston, pp 109-120
-
(1998)
Meta-heuristics: Advances and Trends in Local Search Paradigms for Optimization
, pp. 109-120
-
-
Bullnheimer, B.1
Hartl, R.F.2
Strauss, C.3
-
26
-
-
18744404504
-
An ant colony optimization algorithm for shop scheduling problems
-
DOI 10.1023/B:JMMA.0000038614.39977.6f
-
C Blum M Samples 2004 An ant colony optimization algorithm for shop scheduling problems J Math Model Algorithms 3 285 308 1146.90405 10.1023/B:JMMA.0000038614.39977.6f 2231451 (Pubitemid 40678150)
-
(2004)
Journal of Mathematical Modelling and Algorithms
, vol.3
, Issue.3
, pp. 285-308
-
-
Blum, C.1
Sampels, M.2
-
29
-
-
0037120688
-
An Ant Colony Optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem
-
DOI 10.1016/S0377-2217(02)00265-5, PII S0377221702002655
-
V T'kindt N Monmarché F Tercinet D Laügt 2002 An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem Eur J Oper Res 142 250 257 1082.90592 10.1016/S0377-2217(02)00265-5 (Pubitemid 34803131)
-
(2002)
European Journal of Operational Research
, vol.142
, Issue.2
, pp. 250-257
-
-
T'kindt, V.1
Monmarche, N.2
Tercinet, F.3
Laugt, D.4
-
30
-
-
1642559633
-
Ant colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs
-
1045.90032 10.1016/S0377-2217(02)00908-6 2054703
-
C Rajendran H Ziegler 2004 Ant colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs Eur J Oper Res 155 426 438 1045.90032 10.1016/S0377-2217(02)00908-6 2054703
-
(2004)
Eur J Oper Res
, vol.155
, pp. 426-438
-
-
Rajendran, C.1
Ziegler, H.2
-
31
-
-
15344338961
-
Two ant-colony algorithms for minimizing total flowtime in permutation flowshops
-
DOI 10.1016/j.cie.2004.12.009, PII S0360835204001913, Selected Papers from the 30th International Conference on Computers and Industrial Engineering
-
C Rajendran H Ziegler 2005 Two ant-colony algorithms for minimizing total flowtime in permutation flowshops Comput Ind Eng 48 789 797 10.1016/j.cie.2004.12.009 (Pubitemid 40391497)
-
(2005)
Computers and Industrial Engineering
, vol.48
, Issue.4
, pp. 789-797
-
-
Rajendran, C.1
Ziegler, H.2
-
32
-
-
34548613299
-
Ant colony optimization combined with taboo search for the job shop scheduling problem
-
DOI 10.1016/j.cor.2006.07.003, PII S0305054806001481
-
K-L Huang C-J Liao 2008 Ant colony optimization combined with taboo search for the job shop scheduling problem Comput Oper Res 35 4 1030 1046 1180.90123 10.1016/j.cor.2006.07.003 2578042 (Pubitemid 47404760)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.4
, pp. 1030-1046
-
-
Huang, K.-L.1
Liao, C.-J.2
|