-
1
-
-
0027274213
-
A software architecture for FMS simulation and control
-
D. A. Taglia and M. Santochi, "A software architecture for FMS simulation and control", Annals CIRP. 42(1), pp. 489-492, 1993.
-
(1993)
Annals CIRP
, vol.42
, Issue.1
, pp. 489-492
-
-
Taglia, D.A.1
Santochi, M.2
-
2
-
-
0001632220
-
Using unsupervised learning technologies to induce scheduling knowledge for FMS
-
D. C. Li and I.-S. She, "Using unsupervised learning technologies to induce scheduling knowledge for FMS", International Journal of Production Research, 32(9), pp. 2187-2199, 1995.
-
(1995)
International Journal of Production Research
, vol.32
, Issue.9
, pp. 2187-2199
-
-
Li, D.C.1
She, I.-S.2
-
3
-
-
0011782937
-
A review of job shop scheduling
-
P. Mellor, "A review of job shop scheduling", Operation Research Quarterly, 17(2), pp. 161-171, 1966.
-
(1966)
Operation Research Quarterly
, vol.17
, Issue.2
, pp. 161-171
-
-
Mellor, P.1
-
5
-
-
0001596526
-
Current and future issues concerning HMS scheduling
-
J. Hutchison, "Current and future issues concerning HMS scheduling", International Journal of Management Sciences, 19(6), pp. 529-537, 1991.
-
(1991)
International Journal of Management Sciences
, vol.19
, Issue.6
, pp. 529-537
-
-
Hutchison, J.1
-
6
-
-
0343699904
-
Real-time routeing selection in flexible manufacturing systems
-
New Delhi
-
M. P. Fanti, E. L. O. Valvo, M. Piecentini and G. Piscitellil, "Real-time routeing selection in flexible manufacturing systems", Proceedings of IMTDR Conference, New Delhi, pp. 727-732, 1993.
-
(1993)
Proceedings of IMTDR Conference
, pp. 727-732
-
-
Fanti, M.P.1
Valvo, E.L.O.2
Piecentini, M.3
Piscitellil, G.4
-
7
-
-
0025482435
-
Job shop scheduling with alternative machines
-
N. Nasr and E. A. Elsayed, "Job shop scheduling with alternative machines", International Journal Production Research, 28(9), pp. 1595-1609, 1990.
-
(1990)
International Journal Production Research
, vol.28
, Issue.9
, pp. 1595-1609
-
-
Nasr, N.1
Elsayed, E.A.2
-
8
-
-
0027595170
-
Giffler and Thompson algorithm for job shop scheduling is still good for flexible manufacturing systems
-
M. A. Nascimento, "Giffler and Thompson algorithm for job shop scheduling is still good for flexible manufacturing systems", Journal of the Operational Research Society, 44(5), pp. 521-524, 1993.
-
(1993)
Journal of the Operational Research Society
, vol.44
, Issue.5
, pp. 521-524
-
-
Nascimento, M.A.1
-
10
-
-
0028594405
-
Simulation based real-time scheduling in FMS
-
M. H. Kirn and Y.-D. Kim, "Simulation based real-time scheduling in FMS", Journal of Manufacturing System, 13(2), pp. 85-93, 1994.
-
(1994)
Journal of Manufacturing System
, vol.13
, Issue.2
, pp. 85-93
-
-
Kirn, M.H.1
Kim, Y.-D.2
-
11
-
-
0000711418
-
A branch and bound solution to the general scheduling problem
-
H. H. Greenberg, "A branch and bound solution to the general scheduling problem", International Journal of Operation Research, 16, pp. 353-361, 1968.
-
(1968)
International Journal of Operation Research
, vol.16
, pp. 353-361
-
-
Greenberg, H.H.1
-
12
-
-
11344283936
-
Branch bound technique in combination with priority dispatching rules for scheduling FMS
-
New Delhi
-
N. Jawahar, P. Aravindan, S. G. Ponnambalam and A. Arvindkarthikeyan, "Branch bound technique in combination with priority dispatching rules for scheduling FMS", Proceedings of the International Conference on CAD/CAM, Automation, Robotics and Factories of the future (INCARF'96), New Delhi, pp. 143-150, 1996.
-
(1996)
Proceedings of the International Conference on CAD/CAM, Automation, Robotics and Factories of the Future (INCARF'96)
, pp. 143-150
-
-
Jawahar, N.1
Aravindan, P.2
Ponnambalam, S.G.3
Arvindkarthikeyan, A.4
-
17
-
-
0011743532
-
A comparison between an expert system, a GA and priority for production scheduling
-
J. Schultz, and P. Mertens, "A comparison between an expert system, a GA and priority for production scheduling", Proceedings of the First International Conference on Operations and Quantitative Management", vol.2, pp. 505-513, 1997.
-
(1997)
Proceedings of the First International Conference on Operations and Quantitative Management
, vol.2
, pp. 505-513
-
-
Schultz, J.1
Mertens, P.2
-
18
-
-
0025682531
-
Genetic algorithms and job shop scheduling
-
J. E. Biegel and J. J. Davern, "Genetic algorithms and job shop scheduling", International Journal of Computers and Industrial Engineering, 19(1-4), pp. 81-90, 1990.
-
(1990)
International Journal of Computers and Industrial Engineering
, vol.19
, Issue.1-4
, pp. 81-90
-
-
Biegel, J.E.1
Davern, J.J.2
-
19
-
-
0011747472
-
Combining genetic and local search for solving the job shop scheduling problem
-
Budapest
-
U. Dorndorf and E. Pesche, "Combining genetic and local search for solving the job shop scheduling problem", APMOD93 Proceedings, Budapest, pp. 142-149, 1993.
-
(1993)
APMOD93 Proceedings
, pp. 142-149
-
-
Dorndorf, U.1
Pesche, E.2
-
21
-
-
0028014263
-
Decentral production scheduling of assembly systems with genetic algorithm
-
E. h. H.-P. Weindahl and R. Garlichs, "Decentral production scheduling of assembly systems with genetic algorithm". Annals CIRP, 43(1), pp. 389-395, 1994.
-
(1994)
Annals CIRP
, vol.43
, Issue.1
, pp. 389-395
-
-
Weindahl, E.H.H.-P.1
Garlichs, R.2
-
22
-
-
0029215084
-
Evolution based learning in a job shop environment
-
U. Dorndorf and E. Pesch, "Evolution based learning in a job shop environment", Computers and Operations Research, 22, pp. 25-40, 1995.
-
(1995)
Computers and Operations Research
, vol.22
, pp. 25-40
-
-
Dorndorf, U.1
Pesch, E.2
-
23
-
-
0030192321
-
Scheduling in flow shop and cellular manufacturing with multiple objectives - A genetic algorithmic approach
-
J. Sridhar and C. Rajendran, "Scheduling in flow shop and cellular manufacturing with multiple objectives - a genetic algorithmic approach", International Journal of Production Planning and Control, 7(4). pp. 374-382, 1996.
-
(1996)
International Journal of Production Planning and Control
, vol.7
, Issue.4
, pp. 374-382
-
-
Sridhar, J.1
Rajendran, C.2
|