메뉴 건너뛰기




Volumn 8, Issue , 2003, Pages 137-166

The product model and fourth dimension project

Author keywords

4D CAD; Construction Pilot; Industry Foundation Classes; Information Sharing; Interoperability; Life Cycle Analysis; Product Model

Indexed keywords

CONSTRUCTION PILOT; INDUSTRY FOUNDATION CLASSES (IFC); INFORMATION SHARING; LIFE-CYCLE ANALYSIS; PRODUCT MODEL;

EID: 2942740922     PISSN: 14006529     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (87)

References (10)
  • 2
    • 84888958947 scopus 로고    scopus 로고
    • Project brief
    • Building Lifecycle Interoperable Software (BLIS). (1999). "Project Brief." Project Info, http://www.blis-project.org/index2.html.
    • (1999) Project Info
  • 3
    • 0347779697 scopus 로고    scopus 로고
    • Product model and the fourth dimension-final report
    • Stanford University, Stanford, CA
    • Fischer, M. and Kam, C. (2002). "Product Model and the Fourth Dimension-Final Report." CIFE Technical Report 143, Stanford University, Stanford, CA.
    • (2002) CIFE Technical Report , vol.143
    • Fischer, M.1    Kam, C.2
  • 4
    • 84888941610 scopus 로고
    • About IAI
    • International Alliance of Interoperability (IAI). (1995). "About IAI." Background, http://iaiweb.lbl.gov.
    • (1995) Background
  • 5
    • 2942746884 scopus 로고    scopus 로고
    • Capitalizing on early project opportunities to improve facility life-cycle performance
    • William Stone (Editor), National Institute of Standards and Technology, Gaithersburg, MD. September 23-25, 2002
    • Kam, C.; Fischer, M.; Hänninen, R.; Lehto, S.; and Laitinen, J. (2002). "Capitalizing on Early Project Opportunities to Improve Facility Life-Cycle Performance." Proceedings of the 19th International Symposium on Automation and Robotics in Construction, William Stone (Editor), National Institute of Standards and Technology, Gaithersburg, MD. September 23-25, 2002, pp. 73-78.
    • (2002) Proceedings of the 19th International Symposium on Automation and Robotics in Construction , pp. 73-78
    • Kam, C.1    Fischer, M.2    Hänninen, R.3    Lehto, S.4    Laitinen, J.5
  • 6
    • 84888950621 scopus 로고    scopus 로고
    • Industry foundation classes and 3D/4D models
    • Stanford University, Stanford, CA, September 10
    • Kam, C. and Fischer, M (2001). "Industry Foundation Classes and 3D/4D Models." Presentation at CIFE Summer Program 2001, Stanford University, Stanford, CA, September 10.
    • (2001) CIFE Summer Program 2001
    • Kam, C.1    Fischer, M.2
  • 7
    • 84888958907 scopus 로고    scopus 로고
    • Experiences from HUT-600 auditorium project
    • Helsinki, Finland, November 20
    • Kam, C. and Fischer, M (2001). "Experiences from HUT-600 Auditorium Project." Presentation at VERA Seminar, Helsinki, Finland, November 20.
    • (2001) VERA Seminar
    • Kam, C.1    Fischer, M.2
  • 8
    • 0017135463 scopus 로고
    • Designing to reduce construction costs
    • ASCE, Proc. Paper 12600, December
    • Paulson, B. (1976). "Designing to Reduce Construction Costs." Journal of the Construction Division, ASCE, Vol. 102, No. CO4, Proc. Paper 12600, December, pp. 587-592.
    • (1976) Journal of the Construction Division , vol.102 , Issue.CO4 , pp. 587-592
    • Paulson, B.1
  • 10
    • 0042861949 scopus 로고    scopus 로고
    • Industrial case study of electronic design, cost, and schedule integration
    • Stanford University, Stanford, CA
    • Staub-French, S. and Fischer, M. (2001). "Industrial Case Study of Electronic Design, Cost, and Schedule Integration." CIFE Technical Report 122, Stanford University, Stanford, CA.
    • (2001) CIFE Technical Report , vol.122
    • Staub-French, S.1    Fischer, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.