-
1
-
-
84866122553
-
Assessing the impacts of implementing lean construction
-
Kenley R (ed) UNSW, Sydney, Australia
-
Alarcon LF, Diethelm S, Rojo O, Calderon R (2005) Assessing the impacts of implementing lean construction. In: Kenley R (ed) 13th conference of the international group for lean construction. UNSW, Sydney, Australia, pp 387-393
-
(2005)
13th Conference of the International Group for Lean Construction
, pp. 387-393
-
-
Alarcon, L.F.1
Diethelm, S.2
Rojo, O.3
Calderon, R.4
-
2
-
-
0030093820
-
A data flow model to plan and manage the building design process
-
10.1080/09544829608907924
-
S Austin A Baldwin A Newton 1996 A data flow model to plan and manage the building design process J Eng Des 7 1 3 25 10.1080/09544829608907924
-
(1996)
J Eng des
, vol.7
, Issue.1
, pp. 3-25
-
-
Austin, S.1
Baldwin, A.2
Newton, A.3
-
3
-
-
0001641644
-
Modelling information flow during the conceptual and schematic stages of building design
-
10.1080/014461999371655
-
AN Baldwin SA Austin TM Hassan A Thorpe 1999 Modelling information flow during the conceptual and schematic stages of building design Constr Manage Econ 17 2 155 167 10.1080/014461999371655
-
(1999)
Constr Manage Econ
, vol.17
, Issue.2
, pp. 155-167
-
-
Baldwin, A.N.1
Austin, S.A.2
Hassan, T.M.3
Thorpe, A.4
-
6
-
-
0037362304
-
Lean project management
-
10.1080/09613210301997
-
G Ballard GA Howell 2003 Lean project management Build Res Inf 31 2 119 133 10.1080/09613210301997
-
(2003)
Build Res Inf
, vol.31
, Issue.2
, pp. 119-133
-
-
Ballard, G.1
Howell, G.A.2
-
7
-
-
12344273517
-
Production system loading-cycle time relationship in residential construction
-
10.1061/(ASCE)0733-9364(2005)131:1(15)
-
HH Bashford K Walsh A Sawhney 2005 Production system loading-cycle time relationship in residential construction J Constr Eng Manag 131 1 15 22 10.1061/(ASCE)0733-9364(2005)131:1(15)
-
(2005)
J Constr Eng Manag
, vol.131
, Issue.1
, pp. 15-22
-
-
Bashford, H.H.1
Walsh, K.2
Sawhney, A.3
-
8
-
-
0000435058
-
Metrics for design projects: A review
-
HA Bashir V Thomson 1999 Metrics for design projects: a review Des Stud 20 3 263 277
-
(1999)
Des Stud
, vol.20
, Issue.3
, pp. 263-277
-
-
Bashir, H.A.1
Thomson, V.2
-
9
-
-
38949153778
-
Information alignment and task coordination in organizations: An 'information clutch' metaphor
-
10.1080/10580530701777131
-
BS Caldwell RC Palmer HM Cuevas 2008 Information alignment and task coordination in organizations: an 'information clutch' metaphor Inf Syst Manag 25 1 33 44 10.1080/10580530701777131
-
(2008)
Inf Syst Manag
, vol.25
, Issue.1
, pp. 33-44
-
-
Caldwell, B.S.1
Palmer, R.C.2
Cuevas, H.M.3
-
10
-
-
84947745196
-
-
Blackwell Oxford 10.1002/9780470690758
-
Cooper R, Aouad G, Lee A, Wu S, Fleming A, Kagioglou M (2004) Process management in design and construction. Blackwell, Oxford
-
(2004)
Process Management in Design and Construction
-
-
Cooper, R.1
Aouad, G.2
Lee, A.3
Wu, S.4
Fleming, A.5
Kagioglou, M.6
-
13
-
-
38649094993
-
-
Wiley Hoboken, NJ
-
Eastman CM, Teicholz P, Sacks R, Liston K (2008) BIM handbook: a guide to building information modeling for owners, managers, architects, engineers, contractors, and fabricators. Wiley, Hoboken, NJ
-
(2008)
BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Architects, Engineers, Contractors, and Fabricators
-
-
Eastman, C.M.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
15
-
-
11144299339
-
A model-based method for organizing tasks in product development
-
10.1007/BF01588087
-
SD Eppinger DE Whitney RP Smith DA Gebala 1994 A model-based method for organizing tasks in product development Res Eng Des 6 1 1 13 10.1007/BF01588087
-
(1994)
Res Eng des
, vol.6
, Issue.1
, pp. 1-13
-
-
Eppinger, S.D.1
Whitney, D.E.2
Smith, R.P.3
Gebala, D.A.4
-
17
-
-
13944263231
-
Achieving lean design process: Improvement methodology
-
10.1061/(ASCE)0733-9364(2002)128:3(248)
-
J Freire LF Alarcon 2002 Achieving lean design process: improvement methodology J Constr Eng Manag 128 3 248 256 10.1061/(ASCE)0733-9364(2002)128: 3(248)
-
(2002)
J Constr Eng Manag
, vol.128
, Issue.3
, pp. 248-256
-
-
Freire, J.1
Alarcon, L.F.2
-
22
-
-
34249995943
-
Lean information management: Understanding and eliminating waste
-
BJ Hicks 2007 Lean information management: understanding and eliminating waste Int J Inf Manag 27 4 233 249
-
(2007)
Int J Inf Manag
, vol.27
, Issue.4
, pp. 233-249
-
-
Hicks, B.J.1
-
24
-
-
3242700301
-
A comparison of two editions of the RIBA plan of work
-
WP Hughes 2003 A comparison of two editions of the RIBA plan of work Eng Constr Archit Manag 10 5 301 311
-
(2003)
Eng Constr Archit Manag
, vol.10
, Issue.5
, pp. 301-311
-
-
Hughes, W.P.1
-
25
-
-
0004573260
-
Fast or concurrent: The art of getting construction improved
-
L.F. Alarcon (eds). Balkema Rotterdam. 10.4324/9780203345825-Fast-or- concurrent
-
Huovila P, Koskela L, Lautanala M (1997) Fast or concurrent: the art of getting construction improved. In: Alarcon LF (ed) Lean construction. Balkema, Rotterdam, pp 143-159
-
(1997)
Lean Construction
, pp. 143-159
-
-
Huovila, P.1
Koskela, L.2
Lautanala, M.3
-
26
-
-
0032593163
-
The causes and costs of defects in construction: A study of seven building projects
-
10.1016/S0926-5805(98)00114-9
-
PE Josephson Y Hammarlund 1999 The causes and costs of defects in construction: a study of seven building projects Autom Constr 8 681 687 10.1016/S0926-5805(98)00114-9
-
(1999)
Autom Constr
, vol.8
, pp. 681-687
-
-
Josephson, P.E.1
Hammarlund, Y.2
-
27
-
-
33644547340
-
The impact of information technology on design methods, products and practices
-
YE Kalay 2006 The impact of information technology on design methods, products and practices Des Stud 27 3 357 380
-
(2006)
Des Stud
, vol.27
, Issue.3
, pp. 357-380
-
-
Kalay, Y.E.1
-
28
-
-
84866134919
-
Dispelling the complexity myth: Founding lean construction on location-based planning
-
Sydney, Australia
-
Kenley R (2005) Dispelling the complexity myth: founding lean construction on location-based planning. 13th conference of the international group for lean construction. Sydney, Australia, pp 245-251
-
(2005)
13th Conference of the International Group for Lean Construction
, pp. 245-251
-
-
Kenley, R.1
-
32
-
-
4243129314
-
Information flow parameters for managing organizational processes
-
10.1145/606272.606277
-
R Krovi A Chandra B Rajagopalan 2003 Information flow parameters for managing organizational processes Commun ACM 46 2 77 82 10.1145/606272.606277
-
(2003)
Commun ACM
, vol.46
, Issue.2
, pp. 77-82
-
-
Krovi, R.1
Chandra, A.2
Rajagopalan, B.3
-
33
-
-
34247646925
-
Eliciting information for product modeling using process modeling
-
10.1016/j.datak.2006.08.005
-
G Lee CM Eastman R Sacks 2007 Eliciting information for product modeling using process modeling Data Knowl Eng 62 2 292 307 10.1016/j.datak.2006.08.005
-
(2007)
Data Knowl Eng
, vol.62
, Issue.2
, pp. 292-307
-
-
Lee, G.1
Eastman, C.M.2
Sacks, R.3
-
35
-
-
2142718584
-
Modeling the dynamics of design error induced rework in construction projects
-
10.1080/014461900407374
-
PED Love P Mandal J Smith H Li 2000 Modeling the dynamics of design error induced rework in construction projects Constr Manag Econ 18 5 567 574 10.1080/014461900407374
-
(2000)
Constr Manag Econ
, vol.18
, Issue.5
, pp. 567-574
-
-
Love, P.E.D.1
Mandal, P.2
Smith, J.3
Li, H.4
-
36
-
-
43749116883
-
Forensic project management: An exploratory examination of the causal behavior of design-induced rework
-
10.1109/TEM.2008.919677
-
PED Love DJ Edwards Z Irani 2008 Forensic project management: an exploratory examination of the causal behavior of design-induced rework IEEE Trans Eng Manag 55 2 234 247 10.1109/TEM.2008.919677
-
(2008)
IEEE Trans Eng Manag
, vol.55
, Issue.2
, pp. 234-247
-
-
Love, P.E.D.1
Edwards, D.J.2
Irani, Z.3
-
37
-
-
0035400029
-
Productivity oriented analysis of design revisions
-
10.1080/01446190010017141
-
MR Manavazhi Z Xunzhi 2001 Productivity oriented analysis of design revisions Constr Manag Econ 19 4 379 391 10.1080/01446190010017141
-
(2001)
Constr Manag Econ
, vol.19
, Issue.4
, pp. 379-391
-
-
Manavazhi, M.R.1
Xunzhi, Z.2
-
38
-
-
0034324948
-
Improving the design process with information management
-
10.1016/S0926-5805(99)00057-6
-
KA Moreau WE Back 2000 Improving the design process with information management Autom Constr 10 127 140 10.1016/S0926-5805(99)00057-6
-
(2000)
Autom Constr
, vol.10
, pp. 127-140
-
-
Moreau, K.A.1
Back, W.E.2
-
41
-
-
33847752149
-
Resistance based modeling of collaborative design
-
10.1177/1063293X07076273
-
KJ Ostergaard JD Summers 2007 Resistance based modeling of collaborative design Concurr Eng 15 1 21 32 10.1177/1063293X07076273
-
(2007)
Concurr Eng
, vol.15
, Issue.1
, pp. 21-32
-
-
Ostergaard, K.J.1
Summers, J.D.2
-
42
-
-
27844454911
-
Modelling detailed information flows in building design with the parameter-based design structure matrix
-
ST Pektas M Pultar 2006 Modelling detailed information flows in building design with the parameter-based design structure matrix Des Stud 27 1 99 122
-
(2006)
Des Stud
, vol.27
, Issue.1
, pp. 99-122
-
-
Pektas, S.T.1
Pultar, M.2
-
43
-
-
84973839922
-
Information management for concurrent engineering: Research issues
-
10.1177/1063293X9300100102
-
B Prasad RS Morenc RM Rangan 1993 Information management for concurrent engineering: research issues Concurr Eng 1 1 3 20 10.1177/1063293X9300100102
-
(1993)
Concurr Eng
, vol.1
, Issue.1
, pp. 3-20
-
-
Prasad, B.1
Morenc, R.S.2
Rangan, R.M.3
-
44
-
-
34247279276
-
Lean management model for construction of high-rise apartment buildings
-
10.1061/(ASCE)0733-9364(2007)133:5(374)
-
R Sacks M Goldin 2007 Lean management model for construction of high-rise apartment buildings J Const Eng Manag 133 5 374 384 10.1061/(ASCE)0733- 9364(2007)133:5(374)
-
(2007)
J Const Eng Manag
, vol.133
, Issue.5
, pp. 374-384
-
-
Sacks, R.1
Goldin, M.2
-
45
-
-
1642618587
-
Parametric 3D modeling in building construction with examples from precast concrete
-
10.1016/S0926-5805(03)00043-8
-
R Sacks CM Eastman G Lee 2004 Parametric 3D modeling in building construction with examples from precast concrete Autom Constr 13 291 312 10.1016/S0926-5805(03)00043-8
-
(2004)
Autom Constr
, vol.13
, pp. 291-312
-
-
Sacks, R.1
Eastman, C.M.2
Lee, G.3
-
46
-
-
13944284538
-
Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry
-
10.1061/(ASCE)0733-9364(2004)130:2(206)
-
R Sacks CM Eastman G Lee 2004 Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry ASCE J Constr Eng Manag 130 2 206 215 10.1061/(ASCE)0733-9364(2004)130:2(206)
-
(2004)
ASCE J Constr Eng Manag
, vol.130
, Issue.2
, pp. 206-215
-
-
Sacks, R.1
Eastman, C.M.2
Lee, G.3
-
47
-
-
0031199079
-
A predictive model of sequential iteration in engineering design
-
0887.90108 10.1287/mnsc.43.8.1104
-
RP Smith SD Eppinger 1997 A predictive model of sequential iteration in engineering design Manag Sci 43 8 1104 1120 0887.90108 10.1287/mnsc.43.8.1104
-
(1997)
Manag Sci
, vol.43
, Issue.8
, pp. 1104-1120
-
-
Smith, R.P.1
Eppinger, S.D.2
-
48
-
-
0032320533
-
Experimental observation of iteration in engineering design
-
10.1007/BF01616691
-
RP Smith P Tjandra 1998 Experimental observation of iteration in engineering design Res Eng Des 10 107 117 10.1007/BF01616691
-
(1998)
Res Eng des
, vol.10
, pp. 107-117
-
-
Smith, R.P.1
Tjandra, P.2
-
49
-
-
0019597497
-
The design structure system: A method for managing the design of complex systems
-
DV Steward 1981 The design structure system: a method for managing the design of complex systems IEEE Trans Eng Manag 28 71 74
-
(1981)
IEEE Trans Eng Manag
, vol.28
, pp. 71-74
-
-
Steward, D.V.1
-
50
-
-
0005153711
-
Conceptual model for measuring productivity of design and engineering
-
0959.53008 10.1061/(ASCE)1076-0431(1999)5:1(1)
-
HR Thomas C Korte VE Sanvido MK Parfitt 1999 Conceptual model for measuring productivity of design and engineering J Archit Eng 5 1 1 7 0959.53008 10.1061/(ASCE)1076-0431(1999)5:1(1)
-
(1999)
J Archit Eng
, vol.5
, Issue.1
, pp. 1-7
-
-
Thomas, H.R.1
Korte, C.2
Sanvido, V.E.3
Parfitt, M.K.4
-
51
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
10.1061/(ASCE)0733-9364(1998)124:4(279)
-
ID Tommelein 1998 Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique ASCE J Constr Eng Manag 124 4 279 288 10.1061/(ASCE)0733-9364(1998)124:4(279)
-
(1998)
ASCE J Constr Eng Manag
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
|