메뉴 건너뛰기




Volumn 6, Issue 3, 2010, Pages 316-328

On maximizing reliability of real-time embedded applications under hard energy constraint

Author keywords

Dynamic voltage and frequency scaling; real time embedded systems; reliability

Indexed keywords

CUMULATIVE ENERGY CONSUMPTION; DYNAMIC VOLTAGE AND FREQUENCY SCALING; EMBEDDED APPLICATION; ENERGY BUDGETS; ENERGY CONSTRAINT; ENERGY MANAGEMENT SCHEMES; NEGATIVE IMPACTS; NON-LINEAR OPTIMIZATION PROBLEMS; OPTIMAL SCHEDULER; OPTIMAL SOLUTIONS; PERIODIC TASKS; REAL-TIME EMBEDDED SYSTEMS; REAL-TIME TASKS; RUNTIMES; SIMULATION RESULT; STATIC AND DYNAMIC; SYSTEM RELIABILITY; TASK MODELS; TIMING CONSTRAINTS;

EID: 77955712393     PISSN: 15513203     EISSN: None     Source Type: Journal    
DOI: 10.1109/TII.2010.2051970     Document Type: Article
Times cited : (103)

References (44)
  • 3
    • 84879362082 scopus 로고    scopus 로고
    • Energy-constrained scheduling for weakly-hard real-time systems
    • Miami, FL, Dec.
    • T. AlEnawy and H. Aydin, "Energy-constrained scheduling for weakly-hard real-time systems," in Proc. 26th IEEE Real-Time Syst. Symp. (RTSS05), Miami, FL, Dec. 2005.
    • (2005) Proc. 26th IEEE Real-Time Syst. Symp. RTSS 05
    • Alenawy, T.1    Aydin, H.2
  • 4
    • 34547993522 scopus 로고    scopus 로고
    • System-level energy management for periodic real-time tasks
    • Rio de Janeiro, Brazil, Dec.
    • H. Aydin, V. Devadas, and D. Zhu, "System-level energy management for periodic real-time tasks," in Proc. 27th IEEE Real-Time Syst. Symp. (RTSS06), Rio de Janeiro, Brazil, Dec. 2006.
    • (2006) Proc. 27th IEEE Real-Time Syst. Symp. RTSS 06
    • Aydin, H.1    Devadas, V.2    Zhu, D.3
  • 6
    • 3042585906 scopus 로고    scopus 로고
    • Power-aware scheduling for periodic real-time tasks
    • May
    • H. Aydin, R. Melhem, D. Mossá, and P. Mejia-Alvarez, "Power-aware scheduling for periodic real-time tasks," IEEE Trans. Computers, vol.53, no.10, pp. 584-600, May 2004.
    • (2004) IEEE Trans. Computers , vol.53 , Issue.10 , pp. 584-600
    • Aydin, H.1    Melhem, R.2    Mossá, D.3    Mejia-Alvarez, P.4
  • 9
    • 0020151687 scopus 로고
    • Derivation and calibration of a transient error reliability model
    • Jul.
    • X. Castillo, S. McConnel, and D. Siewiorek, "Derivation and calibration of a transient error reliability model," IEEE Trans. Computers, vol.31, no.7, pp. 658-671, Jul. 1982.
    • (1982) IEEE Trans. Computers , vol.31 , Issue.7 , pp. 658-671
    • Castillo, X.1    McConnel, S.2    Siewiorek, D.3
  • 10
    • 84879367655 scopus 로고    scopus 로고
    • Voltage-scaling scheduling for periodic real-time tasks in reward maximization
    • Miami, FL, Dec.
    • J.-J. Chen and T.-W. Kuo, "Voltage-scaling scheduling for periodic real-time tasks in reward maximization," in Proc. 26th IEEE Real-Time Syst. Symp. (RTSS05), Miami, FL, Dec. 2005.
    • (2005) Proc. 26th IEEE Real-Time Syst. Symp. RTSS 05
    • Chen, J.-J.1    Kuo, T.-W.2
  • 11
    • 69249220349 scopus 로고    scopus 로고
    • SYS-EDF: A system-wide energy efficient scheduling algorithm for hard real-time systems
    • H. Cheng and S. Goddard, "SYS-EDF: A system-wide energy efficient scheduling algorithm for hard real-time systems," Int. J. Embedded Syst. Low Power Real-Time Embedded Comput., vol.4, no.4, pp. 141-151, 2009.
    • (2009) Int. J. Embedded Syst. Low Power Real-Time Embedded Comput. , vol.4 , Issue.4 , pp. 141-151
    • Cheng, H.1    Goddard, S.2
  • 13
    • 15044339297 scopus 로고    scopus 로고
    • Razor: Circuit-level correction of timing errors for low-power operation
    • Nov.-Dec.
    • D. Ernst, S. Das, S. Lee, D. Blaauw, T. Austin, T. Mudge, N. S. Kim, and K. Flautner, "Razor: Circuit-level correction of timing errors for low-power operation," IEEE Micro, vol.24, no.6, pp. 10-20, Nov.-Dec. 2004.
    • (2004) IEEE Micro , vol.24 , Issue.6 , pp. 10-20
    • Ernst, D.1    Das, S.2    Lee, S.3    Blaauw, D.4    Austin, T.5    Mudge, T.6    Kim, N.S.7    Flautner, K.8
  • 15
    • 0034450511 scopus 로고    scopus 로고
    • Impact of CMOS technology scaling on the atmospheric neutron soft error rate
    • Dec.
    • P. Hazucha and C. Svensson, "Impact of CMOS technology scaling on the atmospheric neutron soft error rate," IEEE Trans. Nuclear Sci., vol.47, no.6, pp. 2586-2594, Dec. 2000.
    • (2000) IEEE Trans. Nuclear Sci. , vol.47 , Issue.6 , pp. 2586-2594
    • Hazucha, P.1    Svensson, C.2
  • 16
    • 0022734032 scopus 로고
    • A measurement-based model for workload dependence of CPU errors
    • June
    • R. K. Iyer and D. J. Rossetti, "A measurement-based model for workload dependence of CPU errors," IEEE Trans. Computers, vol.35, no.6, pp. 511-519, June 1986.
    • (1986) IEEE Trans. Computers , vol.35 , Issue.6 , pp. 511-519
    • Iyer, R.K.1    Rossetti, D.J.2
  • 17
    • 84976815079 scopus 로고
    • Measurement and modeling of computer reliability as affected by system activity
    • Aug.
    • R. K. Iyer, D. J. Rossetti, and M. Hsueh, "Measurement and modeling of computer reliability as affected by system activity," ACM Trans. Comput. Syst., vol.4, no.3, pp. 214-237, Aug. 1986.
    • (1986) ACM Trans. Comput. Syst. , vol.4 , Issue.3 , pp. 214-237
    • Iyer, R.K.1    Rossetti, D.J.2    Hsueh, M.3
  • 18
    • 33646914393 scopus 로고    scopus 로고
    • Design optimization of time-and cost-constrained fault-tolerant distributed embedded systems
    • Munich, Germany, Mar.
    • V. Izosimov, P. Pop, P. Eles, and Z. Peng, "Design optimization of time-and cost-constrained fault-tolerant distributed embedded systems," in Proc. Design, Autom. Test in Europe (DATE05), Munich, Germany, Mar. 2005.
    • (2005) Proc. Design, Autom. Test in Europe DATE 05
    • Izosimov, V.1    Pop, P.2    Eles, P.3    Peng, Z.4
  • 19
    • 0000412757 scopus 로고    scopus 로고
    • Task allocation algorithms for maximizing reliability of distributed computing systems
    • June
    • S. Kartik and C. S. R. Murthy, "Task allocation algorithms for maximizing reliability of distributed computing systems," IEEE Trans. Computers, vol.46, no.6, pp. 719-724, June 1997.
    • (1997) IEEE Trans. Computers , vol.46 , Issue.6 , pp. 719-724
    • Kartik, S.1    Murthy, C.S.R.2
  • 20
    • 84974687699 scopus 로고
    • Scheduling algorithms for multiprogramming in hard real-time environment
    • Jan
    • C. L. Liu and J. W. Layland, "Scheduling algorithms for multiprogramming in hard real-time environment," J. ACM, vol.20, no.1, pp. 46-61, Jan. 1973.
    • (1973) J. ACM , vol.20 , Issue.1 , pp. 46-61
    • Liu, C.L.1    Layland, J.W.2
  • 21
    • 0034854193 scopus 로고    scopus 로고
    • Power-aware scheduling under timing constraints for mission-critical embedded systems
    • Las Vegas, NV, Jul.
    • J. Liu, P. Chou, N. Bagherzadeh, and F. Kurdahi, "Power-aware scheduling under timing constraints for mission-critical embedded systems," in Proc. ACM/IEEE Design Autom. Conf. (DAC01), Las Vegas, NV, Jul. 2001.
    • (2001) Proc. ACM/IEEE Design Autom. Conf. DAC 01
    • Liu, J.1    Chou, P.2    Bagherzadeh, N.3    Kurdahi, F.4
  • 22
    • 0003747969 scopus 로고    scopus 로고
    • Upper Saddle River, NJ: Prentice- Hall
    • J. W. S. Liu, Real-Time Systems. Upper Saddle River, NJ: Prentice- Hall, 2000.
    • (2000) Real-Time Systems.
    • Liu, J.W.S.1
  • 24
    • 1342323873 scopus 로고    scopus 로고
    • The interplay of power management and fault recovery in real-time systems
    • Feb.
    • R. Melhem, D. Mossá, and E. Elnozahy, "The interplay of power management and fault recovery in real-time systems," IEEE Trans. Computers, vol.53, no.2, pp. 217-231, Feb. 2004.
    • (2004) IEEE Trans. Computers , vol.53 , Issue.2 , pp. 217-231
    • Melhem, R.1    Mossá, D.2    Elnozahy, E.3
  • 25
    • 34248328748 scopus 로고    scopus 로고
    • Transition-overhead-aware voltage scheduling for fixed-priority real-time systems
    • Apr.
    • B. Mochocki, X. S. Hu, and G. Quan, "Transition-overhead-aware voltage scheduling for fixed-priority real-time systems," ACM Trans. Design Autom. Electron. Syst. (TODAES), vol.12, no.2, pp. 1-26, Apr. 2007.
    • (2007) ACM Trans. Design Autom. Electron. Syst. Todaes , vol.12 , Issue.2 , pp. 1-26
    • Mochocki, B.1    Hu, X.S.2    Quan, G.3
  • 27
    • 0036036849 scopus 로고    scopus 로고
    • Real-time dynamic voltage scaling for low power embedded operating systems
    • Chateau Lake Louise, Banff, Canada, Oct.
    • P. Pillai and K. G. Shin, "Real-time dynamic voltage scaling for low power embedded operating systems," in Proc. ACM Symp. Oper. Syst. Principles (SOSP01), Chateau Lake Louise, Banff, Canada, Oct. 2001.
    • (2001) Proc. ACM Symp. Oper. Syst. Principles Sosp 01
    • Pillai, P.1    Shin, K.G.2
  • 29
    • 77955937293 scopus 로고    scopus 로고
    • Maximizing rewards for real-time applications with energy constraints
    • Nov.
    • C. Rusu, R. Melhem, and D. Mosse, "Maximizing rewards for real-time applications with energy constraints," ACM Trans. Embedded Comput. Syst., vol.2, no.4, pp. 537-559, Nov. 2003.
    • (2003) ACM Trans. Embedded Comput. Syst. , vol.2 , Issue.4 , pp. 537-559
    • Rusu, C.1    Melhem, R.2    Mosse, D.3
  • 31
    • 84893715933 scopus 로고    scopus 로고
    • Energy-efficient mapping and scheduling for DVS enabled distributed embedded systems
    • Paris, France, Mar.
    • M. T. Schmitz, B. M. Al-Hashimi, and P. Eles, "Energy-efficient mapping and scheduling for DVS enabled distributed embedded systems," in Proc. Design, Autom. Test in Europe (DATE02), Paris, France, Mar. 2002.
    • (2002) Proc. Design, Autom. Test in Europe DATE 02
    • Schmitz, M.T.1    Al-Hashimi, B.M.2    Eles, P.3
  • 32
    • 51549102260 scopus 로고    scopus 로고
    • Feedback-controlled reliability- aware power management for real-time embedded systems
    • Anaheim, CA, Jun.
    • R. Sridharan, N. Gupta, and R. Mahapatra, "Feedback-controlled reliability- aware power management for real-time embedded systems," in Proc. ACM/IEEE Design Autom. Conf. (DAC08), Anaheim, CA, Jun. 2008.
    • (2008) Proc. ACM/IEEE Design Autom. Conf. DAC 08
    • Sridharan, R.1    Gupta, N.2    Mahapatra, R.3
  • 33
    • 0032683084 scopus 로고    scopus 로고
    • Safety and reliability driven task allocation in distributed systems
    • Mar.
    • S. Srinivasan and N. Jha, "Safety and reliability driven task allocation in distributed systems," IEEE Trans. Parallel Distrib. Syst., vol.10, no.3, pp. 238-251, Mar. 1999.
    • (1999) IEEE Trans. Parallel Distrib. Syst. , vol.10 , Issue.3 , pp. 238-251
    • Srinivasan, S.1    Jha, N.2
  • 36
    • 34548727399 scopus 로고    scopus 로고
    • Utility accrual real-time scheduling under the unimodal arbitrary arrival model with energy bounds
    • Oct.
    • H. Wu, B. Ravindran, and E. Jensen, "Utility accrual real-time scheduling under the unimodal arbitrary arrival model with energy bounds," IEEE Trans. Computers, vol.56, no.10, pp. 1358-1371, Oct. 2007.
    • (2007) IEEE Trans. Computers , vol.56 , Issue.10 , pp. 1358-1371
    • Wu, H.1    Ravindran, B.2    Jensen, E.3
  • 37
    • 37049016851 scopus 로고    scopus 로고
    • Minimizing expected energy consumption in real-time systems through dynamic voltage scaling
    • Dec.
    • R. Xu, D. Mosse, and R. Melhem, "Minimizing expected energy consumption in real-time systems through dynamic voltage scaling," ACM Trans. Embedded Comput. Syst., vol.25, no.4, pp. 1-40, Dec. 2007.
    • (2007) ACM Trans. Embedded Comput. Syst. , vol.25 , Issue.4 , pp. 1-40
    • Xu, R.1    Mosse, D.2    Melhem, R.3
  • 38
    • 0347566155 scopus 로고    scopus 로고
    • Throughput and value maximization in wireless packet scheduling under energy and time constraints
    • Cancun, Mexico, Dec.
    • F. Zhang and S. Chanson, "Throughput and value maximization in wireless packet scheduling under energy and time constraints," in Proc. 24th IEEE Real-Time Syst. Symp. (RTSS03), Cancun, Mexico, Dec. 2003.
    • (2003) Proc. 24th IEEE Real-Time Syst. Symp. RTSS 03
    • Zhang, F.1    Chanson, S.2
  • 39
    • 84893775741 scopus 로고    scopus 로고
    • Energy-aware adaptive checkpointing in embedded real-time systems
    • Munich, Germany, Mar.
    • Y. Zhang and K. Chakrabarty, "Energy-aware adaptive checkpointing in embedded real-time systems," in Proc. Design, Autom. Test in Europe (DATE03), Munich, Germany, Mar. 2003.
    • (2003) Proc. Design, Autom. Test in Europe DATE 03
    • Zhang, Y.1    Chakrabarty, K.2
  • 40
    • 33749636129 scopus 로고    scopus 로고
    • Reliability-aware dynamic energy management in dependable embedded real-time systems
    • San Jose, CA, Apr.
    • D. Zhu, "Reliability-aware dynamic energy management in dependable embedded real-time systems," in Proc. IEEE Real-Time and Embedded Technol. Appl. Symp. (RTAS06), San Jose, CA, Apr. 2006.
    • (2006) Proc. IEEE Real-Time and Embedded Technol. Appl. Symp. RTAS 06
    • Zhu, D.1
  • 41
    • 70349443088 scopus 로고    scopus 로고
    • Reliability-aware energy management for periodic real-time tasks
    • Oct.
    • D. Zhu and H. Aydin, "Reliability-aware energy management for periodic real-time tasks," IEEE Trans. Computers, vol.58, no.10, pp. 1382-1397, Oct. 2009.
    • (2009) IEEE Trans. Computers , vol.58 , Issue.10 , pp. 1382-1397
    • Zhu, D.1    Aydin, H.2
  • 42
    • 46149083749 scopus 로고    scopus 로고
    • Energy management for real-time embedded systems with reliability requirements
    • San Jose, CA, Nov.
    • D. Zhu and H. Aydin, "Energy management for real-time embedded systems with reliability requirements," in Proc. IEEE/ACM Int. Conf. Comput.-Aided Design (ICCAD06), San Jose, CA, Nov. 2006.
    • (2006) Proc. IEEE/ACM Int. Conf. Comput.-Aided Design ICCAD06
    • Zhu, D.1    Aydin, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.