-
1
-
-
33845702538
-
Project scheduling and monitoring: Current research status
-
Ahuja, V. Thiruvengadam, V. (2004). Project scheduling and monitoring: current research status. Construction and Innovation, 4(1) 19-31.
-
(2004)
Construction and Innovation
, vol.4
, Issue.1
, pp. 19-31
-
-
Ahuja, V.1
Thiruvengadam, V.2
-
4
-
-
0004011301
-
-
PhD. Thesis. Falculty of Engineering of The University of Birmingham, UK.
-
Ballard, G. (2000). "The last planner system of production control". PhD. Thesis. Falculty of Engineering of The University of Birmingham, UK.
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.1
-
8
-
-
0037290655
-
Management control systems design within its organizational contex: Findings from contingency based research and directions for the future
-
Pergamon
-
Chenhall. R. H. (2003). "Management control systems design within its organizational contex: findings from contingency based research and directions for the future". Accounting, Organization and Society, 28 127-168. Pergamon.
-
(2003)
Accounting, Organization and Society
, vol.28
, pp. 127-168
-
-
Chenhall, R.H.1
-
9
-
-
0003926816
-
-
Great Barrington, MA: North River Press
-
Goldartt, E.H. (1997). Critical chain. Great Barrington, MA: North River Press.
-
(1997)
Critical Chain
-
-
Goldartt, E.H.1
-
13
-
-
85044160449
-
Critical-path planning and scheduling
-
Boston, MA
-
Kelley, J. E. and Walker, M. R. (1959). Critical-Path Planning and Scheduling. Proceedings of the Eastern Joint Computer Conference, Boston, MA, 16, 160-172.
-
(1959)
Proceedings of the Eastern Joint Computer Conference
, vol.16
, pp. 160-172
-
-
Kelley, J.E.1
Walker, M.R.2
-
14
-
-
21344434620
-
Project micromanagement: Practical site planning and management of work flow
-
Denmark
-
Kenley, R. (2004). "Project micromanagement: practical site planning and management of work flow". 12th Annual Conference on Lean Construction, IGLC, Denmark.
-
(2004)
12th Annual Conference on Lean Construction, IGLC
-
-
Kenley, R.1
-
22
-
-
0037085145
-
Aggregate order release planning for time-varying demand
-
Missbauer, H. (2002). "Aggregate order release planning for time-varying demand". International Journal of Production Research. 40(3). 699-718.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.3
, pp. 699-718
-
-
Missbauer, H.1
-
24
-
-
0040196089
-
Production scheduling theory: Just where is it applicable?
-
Portougal, V. and Robb, D.J. (2000). "Production scheduling theory: just where is it applicable?" Interfaces 30 (6). 64-76.
-
(2000)
Interfaces
, vol.30
, Issue.6
, pp. 64-76
-
-
Portougal, V.1
Robb, D.J.2
-
25
-
-
0033896225
-
Critical chain: The theory of constraints applied to project management
-
Rand, G.K. (2000). "Critical chain: the theory of constraints applied to project management." International Journal of the Project Management. 18, 173-177.
-
(2000)
International Journal of the Project Management
, pp. 173-177
-
-
Rand, G.K.1
-
27
-
-
84995940582
-
Implementation of line-of-balance based scheduling and project control system in a large construction company
-
IGLC, Denmark
-
Soini, M.; Leskela, I.; Seppanen, O. 2004. "Implementation of line-of-balance based scheduling and project control system in a large construction company". 12th Annual Conference on Lean Construction, IGLC, Denmark.
-
(2004)
12th Annual Conference on Lean Construction
-
-
Soini, M.1
Leskela, I.2
Seppanen, O.3
-
28
-
-
0032675551
-
Design requirements for health care production control systems
-
Vries, G., Bertrand, J.W.M. and Vissers, J.M.H. (1999). "Design requirements for health care production control systems." Production Planning & Control. 10(6). 559-569.
-
(1999)
Production Planning & Control
, vol.10
, Issue.6
, pp. 559-569
-
-
Vries, G.1
Bertrand, J.W.M.2
Vissers, J.M.H.3
-
29
-
-
0035454491
-
Comparison of linear scheduling model (LSM) and critical path method (CPM
-
September/October
-
Yamín, R.A. and Harmelink, D.J. (2001). "Comparison of linear scheduling model (LSM) and critical path method (CPM)." Journal of Construction Engineering and Management ASCE, 127(5), September/October. 374-381.
-
(2001)
Journal of Construction Engineering and Management ASCE
, Issue.5
, pp. 374-381
-
-
Yamín, R.A.1
Harmelink, D.J.2
-
30
-
-
1642438329
-
Network creation and development for repetitiveunit projects
-
June
-
Yi, K.J., Lee, H. and Choi, Y. K. (2002). "Network creation and development for repetitiveunit projects." Journal of Construction Engineering and Management ASCE, 128(3), June, 257-264.
-
(2002)
Journal of Construction Engineering and Management ASCE
, vol.128
, Issue.3
, pp. 257-264
-
-
Yi, K.J.1
Lee, H.2
Choi, Y.K.3
|