메뉴 건너뛰기




Volumn , Issue , 2005, Pages 189-198

Context of production control in construction

Author keywords

Decision functions; Methods; Production control; Typology

Indexed keywords

CRITICAL CHAIN; DECISION FUNCTIONS; FIELD OBSERVATIONS; LAST PLANNER SYSTEM; LINE OF BALANCES; METHODS; PROCESS STAGES; TYPOLOGY;

EID: 77952945013     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (12)

References (30)
  • 1
    • 33845702538 scopus 로고    scopus 로고
    • Project scheduling and monitoring: Current research status
    • Ahuja, V. Thiruvengadam, V. (2004). Project scheduling and monitoring: current research status. Construction and Innovation, 4(1) 19-31.
    • (2004) Construction and Innovation , vol.4 , Issue.1 , pp. 19-31
    • Ahuja, V.1    Thiruvengadam, V.2
  • 4
    • 0004011301 scopus 로고    scopus 로고
    • PhD. Thesis. Falculty of Engineering of The University of Birmingham, UK.
    • Ballard, G. (2000). "The last planner system of production control". PhD. Thesis. Falculty of Engineering of The University of Birmingham, UK.
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 8
    • 0037290655 scopus 로고    scopus 로고
    • Management control systems design within its organizational contex: Findings from contingency based research and directions for the future
    • Pergamon
    • Chenhall. R. H. (2003). "Management control systems design within its organizational contex: findings from contingency based research and directions for the future". Accounting, Organization and Society, 28 127-168. Pergamon.
    • (2003) Accounting, Organization and Society , vol.28 , pp. 127-168
    • Chenhall, R.H.1
  • 9
    • 0003926816 scopus 로고    scopus 로고
    • Great Barrington, MA: North River Press
    • Goldartt, E.H. (1997). Critical chain. Great Barrington, MA: North River Press.
    • (1997) Critical Chain
    • Goldartt, E.H.1
  • 14
    • 21344434620 scopus 로고    scopus 로고
    • Project micromanagement: Practical site planning and management of work flow
    • Denmark
    • Kenley, R. (2004). "Project micromanagement: practical site planning and management of work flow". 12th Annual Conference on Lean Construction, IGLC, Denmark.
    • (2004) 12th Annual Conference on Lean Construction, IGLC
    • Kenley, R.1
  • 22
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate order release planning for time-varying demand
    • Missbauer, H. (2002). "Aggregate order release planning for time-varying demand". International Journal of Production Research. 40(3). 699-718.
    • (2002) International Journal of Production Research , vol.40 , Issue.3 , pp. 699-718
    • Missbauer, H.1
  • 24
    • 0040196089 scopus 로고    scopus 로고
    • Production scheduling theory: Just where is it applicable?
    • Portougal, V. and Robb, D.J. (2000). "Production scheduling theory: just where is it applicable?" Interfaces 30 (6). 64-76.
    • (2000) Interfaces , vol.30 , Issue.6 , pp. 64-76
    • Portougal, V.1    Robb, D.J.2
  • 25
    • 0033896225 scopus 로고    scopus 로고
    • Critical chain: The theory of constraints applied to project management
    • Rand, G.K. (2000). "Critical chain: the theory of constraints applied to project management." International Journal of the Project Management. 18, 173-177.
    • (2000) International Journal of the Project Management , pp. 173-177
    • Rand, G.K.1
  • 26
    • 18144388787 scopus 로고    scopus 로고
    • A critical look at critical chain project management
    • December
    • Pergamon. Raz, T., Barnes, R. and Dvir, D. (2003). "A critical look at critical chain project management". Project Management Journal. December. 24-32.
    • (2003) Project Management Journal , pp. 24-32
    • Pergamon. Raz, T.1    Barnes, R.2    Dvir, D.3
  • 27
    • 84995940582 scopus 로고    scopus 로고
    • Implementation of line-of-balance based scheduling and project control system in a large construction company
    • IGLC, Denmark
    • Soini, M.; Leskela, I.; Seppanen, O. 2004. "Implementation of line-of-balance based scheduling and project control system in a large construction company". 12th Annual Conference on Lean Construction, IGLC, Denmark.
    • (2004) 12th Annual Conference on Lean Construction
    • Soini, M.1    Leskela, I.2    Seppanen, O.3
  • 28
    • 0032675551 scopus 로고    scopus 로고
    • Design requirements for health care production control systems
    • Vries, G., Bertrand, J.W.M. and Vissers, J.M.H. (1999). "Design requirements for health care production control systems." Production Planning & Control. 10(6). 559-569.
    • (1999) Production Planning & Control , vol.10 , Issue.6 , pp. 559-569
    • Vries, G.1    Bertrand, J.W.M.2    Vissers, J.M.H.3
  • 29
    • 0035454491 scopus 로고    scopus 로고
    • Comparison of linear scheduling model (LSM) and critical path method (CPM
    • September/October
    • Yamín, R.A. and Harmelink, D.J. (2001). "Comparison of linear scheduling model (LSM) and critical path method (CPM)." Journal of Construction Engineering and Management ASCE, 127(5), September/October. 374-381.
    • (2001) Journal of Construction Engineering and Management ASCE , Issue.5 , pp. 374-381
    • Yamín, R.A.1    Harmelink, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.