메뉴 건너뛰기




Volumn 128, Issue 3, 2002, Pages 257-264

Network creation and development for repetitive-unit projects

Author keywords

Construction industry; Networks; Project management; Scheduling

Indexed keywords

COMPUTATION THEORY; COMPUTER SOFTWARE; CONSTRUCTION INDUSTRY; CRITICAL PATH ANALYSIS; DATA REDUCTION; ELECTRIC NETWORK ANALYSIS; OPTIMIZATION; SPREADSHEETS;

EID: 1642438329     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:3(257)     Document Type: Article
Times cited : (9)

References (12)
  • 1
    • 0000981977 scopus 로고
    • Planning construction of repetitive building units
    • Carr, R. I., and Meyer, W. L. (1974). "Planning construction of repetitive building units." J. Constr. Div., Am. Soc. Civ. Eng., 100(3), 403-412.
    • (1974) J. Constr. Div., Am. Soc. Civ. Eng. , vol.100 , Issue.3 , pp. 403-412
    • Carr, R.I.1    Meyer, W.L.2
  • 2
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • Harmelink, D. J., and Rowings, J. E. (1998). "Linear scheduling model: Development of controlling activity path." J. Constr. Eng. Manage., 124(4), 263-268.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1    Rowings, J.E.2
  • 3
    • 0000674566 scopus 로고    scopus 로고
    • Scheduling projects with repeating activities
    • Harris, R. B., et al. (1998). "Scheduling projects with repeating activities." J. Constr. Eng. Manage., 124(4), 269-278.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 269-278
    • Harris, R.B.1
  • 4
    • 0000466018 scopus 로고    scopus 로고
    • Resource leveling of linear schedules using integer linear programming
    • Mattila, K. G., and Dulcy, M. A. (1998). "Resource leveling of linear schedules using integer linear programming." J. Constr. Eng. Manage., 124(3), 232-244.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.3 , pp. 232-244
    • Mattila, K.G.1    Dulcy, M.A.2
  • 6
    • 0016643558 scopus 로고
    • VPM scheduling for high-rise buildings
    • O'Brien, J. J. (1975). "VPM scheduling for high-rise buildings." J. Constr. Div., Am. Soc. Civ. Eng., 101(4), 895-905.
    • (1975) J. Constr. Div., Am. Soc. Civ. Eng. , vol.101 , Issue.4 , pp. 895-905
    • O'Brien, J.J.1
  • 8
    • 0019030431 scopus 로고
    • Construction planning for linear projects
    • Selinger, S. (1980). "Construction planning for linear projects." J. Constr. Div., Am. Soc. Civ. Eng., 106(2), 195-205.
    • (1980) J. Constr. Div., Am. Soc. Civ. Eng. , vol.106 , Issue.2 , pp. 195-205
    • Selinger, S.1
  • 11
    • 0030825017 scopus 로고    scopus 로고
    • SCaRC: Space-constrained resource-constrained scheduling system
    • Thabet, W. Y., and Beliveau, Y. J. (1997). "SCaRC: Space-constrained resource-constrained scheduling system." J. Comput. Civ. Eng., 11(1), 48-59.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.1 , pp. 48-59
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 12
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). "Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.