메뉴 건너뛰기




Volumn 30, Issue 6, 2000, Pages 64-76

Production scheduling theory: Just where is it applicable?

Author keywords

Applications; Planning; Production scheduling

Indexed keywords


EID: 0040196089     PISSN: 00922102     EISSN: None     Source Type: Journal    
DOI: 10.1287/inte.30.6.64.11623     Document Type: Article
Times cited : (42)

References (18)
  • 1
    • 0004047288 scopus 로고
    • Division of Research, Harvard University Graduate School of Business, Boston, Massachusetts
    • Anthony, R. N. 1965, Planning and Control Systems: A Framework for Analysis, Division of Research, Harvard University Graduate School of Business, Boston, Massachusetts.
    • (1965) Planning and Control Systems: A Framework for Analysis
    • Anthony, R.N.1
  • 2
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: A review
    • Baker, K. R. and Scudder, G. D. 1990, "Sequencing with earliness and tardiness penalties: A review," Operations Research, Vol. 38, No. 1, pp. 22-36.
    • (1990) Operations Research , vol.38 , Issue.1 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0010903490 scopus 로고
    • Linking the shop floor to the top floor
    • Beischel, M. E. and Smith, K. R. 1991, "Linking the shop floor to the top floor," Management Accounting, Vol. 73, No. 4, pp. 25-29.
    • (1991) Management Accounting , vol.73 , Issue.4 , pp. 25-29
    • Beischel, M.E.1    Smith, K.R.2
  • 5
    • 0024962824 scopus 로고
    • Production scheduling: Theory and practice
    • Buxey, G. 1989, "Production scheduling: Theory and practice," European Journal of Operational Research, Vol. 39, No. 1, pp. 17-31.
    • (1989) European Journal of Operational Research , vol.39 , Issue.1 , pp. 17-31
    • Buxey, G.1
  • 6
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E. and Gupta, M. C. 1989, "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Vol. 38, No. 2, pp. 156-166.
    • (1989) European Journal of Operational Research , vol.38 , Issue.2 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 7
    • 0002499542 scopus 로고
    • The lessons of flow shop scheduling research
    • Dudek, R. A.; Panwalker, S. S.; and Smith, M. L. 1992, "The lessons of flow shop scheduling research," Operations Research, Vol. 40, No. 1, pp. 7-13.
    • (1992) Operations Research , vol.40 , Issue.1 , pp. 7-13
    • Dudek, R.A.1    Panwalker, S.S.2    Smith, M.L.3
  • 8
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S. C. 1981, "A review of production scheduling," Operations Research, Vol. 29, No. 2, pp. 646-675.
    • (1981) Operations Research , vol.29 , Issue.2 , pp. 646-675
    • Graves, S.C.1
  • 10
    • 0003075019 scopus 로고
    • Optimal two-and three-stage production schedules with set-up times included
    • Johnson, S. M. 1954, "Optimal two-and three-stage production schedules with set-up times included," Naval Research Logistics Quarterly, Vol. 1, No. 1, pp. 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 11
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • MacCarthy, B. L. and Liu, J. 1993, "Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling," International Journal of Production Research, Vol. 31, No. 1, pp. 59-79.
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • MacCarthy, B.L.1    Liu, J.2
  • 12
    • 0002748923 scopus 로고
    • Job-shop scheduling theory: What is relevant?
    • McKay, K. N.; Safayeni, F. R.; and Buzacott, J. A. 1988, "Job-shop scheduling theory: What is relevant?" Interfaces, Vol. 18, No. 4, pp. 84-90.
    • (1988) Interfaces , vol.18 , Issue.4 , pp. 84-90
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 13
    • 0029323355 scopus 로고
    • 'common sense' realities of planning and scheduling in printed circuit board production
    • McKay, K. N.; Safayeni, F. R.; and Buzacott, J. A. 1995, "'Common sense' realities of planning and scheduling in printed circuit board production," International Journal of Production Research, Vol. 33, No. 6, pp. 1587-1603.
    • (1995) International Journal of Production Research , vol.33 , Issue.6 , pp. 1587-1603
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 14
    • 0022737401 scopus 로고
    • Scheduling, sequencing, and dispatching: Alternative perspectives
    • Melnyk, S. A.; Vickery, S. K.; and Carter, P. L. 1986, "Scheduling, sequencing, and dispatching: Alternative perspectives," Production and Inventory Management Journal, Vol. 27, No. 2 (second quarter), pp. 58-67.
    • (1986) Production and Inventory Management Journal , vol.27 , Issue.2 SECOND QUARTER , pp. 58-67
    • Melnyk, S.A.1    Vickery, S.K.2    Carter, P.L.3
  • 17
    • 0002501521 scopus 로고
    • A state-of-art survey of static scheduling research involving due dates
    • Sen, T. and Gupta, S. K. 1984, "A state-of-art survey of static scheduling research involving due dates," OMEGA, Vol. 12, No. 1, pp. 63-76.
    • (1984) OMEGA , vol.12 , Issue.1 , pp. 63-76
    • Sen, T.1    Gupta, S.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.