메뉴 건너뛰기




Volumn 42, Issue 6, 2010, Pages 422-434

Split and merge production systems: Performance analysis and structural properties

Author keywords

Circulate; Merge; Percentage; Priority; Split; Strictly circulate; Throughput

Indexed keywords

ANALYTICAL METHOD; CIRCULATE; CONTROL ACTIVITIES; MACHINE RELIABILITY; MANUFACTURING SYSTEM; PERFORMANCE ANALYSIS; PRODUCT QUALITY; PRODUCTION CAPACITY; PRODUCTION SYSTEM; RECURSIVE PROCEDURE; ROUTING POLICIES; SPLIT-AND-MERGE;

EID: 77951141401     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170903394348     Document Type: Article
Times cited : (28)

References (18)
  • 2
  • 3
    • 42449123014 scopus 로고    scopus 로고
    • Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliablemachines and finite homogeneous buffers
    • Colledani,M., Gandola, F.,Matta, A. and Tolio, T. (2008) Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliablemachines and finite homogeneous buffers. IIE Transactions, 40, 612-626.
    • (2008) IIE Transactions , vol.40 , pp. 612-626
    • Colledani, M.1    Gandola, F.2    Matta, A.3    Tolio, T.4
  • 4
    • 17444424631 scopus 로고    scopus 로고
    • Performance evaluation of production lines with finite buffer capacity producing two different products
    • Colledani,M., Matta, A. and Tolio, T. (2005) Performance evaluation of production lines with finite buffer capacity producing two different products. OR Spectrum, 27, 243-263.
    • (2005) OR Spectrum , vol.27 , pp. 243-263
    • Colledani, M.1    Matta, A.2    Tolio, T.3
  • 5
    • 33748302072 scopus 로고    scopus 로고
    • Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures
    • Diamantidis, A.C. and Papadopoulos, C.T. (2006) Markovian analysis of a discrete material manufacturing system with merge operations, operation-dependent and idleness failures. Computer & Industrial Engineering, 50, 466-487.
    • (2006) Computer & Industrial Engineering , vol.50 , pp. 466-487
    • Diamantidis, A.C.1    Papadopoulos, C.T.2
  • 6
    • 1342308560 scopus 로고    scopus 로고
    • Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines
    • Diamantidis, A.C., Papadopoulos, C.T. and Vidalis, M. (2004) Exact analysis of a discrete material three-station one-buffer merge system with unreliable machines. International Journal of Production Research, 42, 651-675.
    • (2004) International Journal of Production Research , vol.42 , pp. 651-675
    • Diamantidis, A.C.1    Papadopoulos, C.T.2    Vidalis, M.3
  • 8
    • 0034381835 scopus 로고    scopus 로고
    • Approximate analysis of unreliable transfer lines with splits in the flow of material
    • Helber, S. (2000) Approximate analysis of unreliable transfer lines with splits in the flow of material. Annals of Operations Research, 93, 217-243.
    • (2000) Annals of Operations Research , vol.93 , pp. 217-243
    • Helber, S.1
  • 9
    • 33746836791 scopus 로고    scopus 로고
    • Exact analysis of continuous material merge system with limited buffer capacity and three stations
    • Gershwin, S., Dallery, Y., Papadopoulos, C.T., and Smith, J.M. ( eds), Kluwer Academic Publisher, Norwell, MA
    • Helber, S. and Mehrtens,N. (2003) Exact analysis of continuous material merge system with limited buffer capacity and three stations, in Analysis and Modeling of Manufacturing Systems, Gershwin, S., Dallery, Y., Papadopoulos, C.T., and Smith, J.M. (eds), Kluwer Academic Publisher, Norwell, MA, pp. 85-121.
    • (2003) Analysis and Modeling of Manufacturing Systems , pp. 85-121
    • Helber, S.1    Mehrtens, N.2
  • 10
    • 7244239535 scopus 로고    scopus 로고
    • Modeling and analysis of manufacturing systems with parallel lines
    • Li, J. (2004a) Modeling and analysis of manufacturing systems with parallel lines. IEEE Transactions on Automatic Control, 49, 1824-1829.
    • (2004) IEEE Transactions on Automatic Control , vol.49 , pp. 1824-1829
    • Li, J.1
  • 11
    • 3242682462 scopus 로고    scopus 로고
    • Performance analysis of production systems with rework loops
    • Li, J. (2004b) Performance analysis of production systems with rework loops. IIE Transactions, 36, 755-765.
    • (2004) IIE Transactions , vol.36 , pp. 755-765
    • Li, J.1
  • 13
    • 12844287589 scopus 로고    scopus 로고
    • Overlapping decomposition: A system-theoretic method for modeling and analysis of complex production systems
    • Li, J. (2005) Overlapping decomposition: a system-theoretic method for modeling and analysis of complex production systems. IEEE Transactions on Automation Sciences and Engineering, 2, 40-53.
    • (2005) IEEE Transactions on Automation Sciences and Engineering , vol.2 , pp. 40-53
    • Li, J.1
  • 15
    • 27844593045 scopus 로고    scopus 로고
    • Modeling and analysis of a multiple product manufacturing system with split and merge
    • Li, J. and Huang, N. (2005) Modeling and analysis of a multiple product manufacturing system with split and merge. International Journal of Production Research, 43, 4049-4066.
    • (2005) International Journal of Production Research , vol.43 , pp. 4049-4066
    • Li, J.1    Huang, N.2
  • 17
    • 70449629243 scopus 로고    scopus 로고
    • Modeling and analysis of split andmerge systems with bernoulli reliability machines
    • Liu,Y. and Li, J. (2009) Modeling and analysis of split andmerge systems with bernoulli reliability machines. International Journal of Production Research, 47, 4373-4397.
    • (2009) International Journal of Production Research , vol.47 , pp. 4373-4397
    • Liu, Y.1    Li, J.2
  • 18
    • 0035831088 scopus 로고    scopus 로고
    • A three-station merge system with unreliable stations and a shared buffer
    • Tan, B. (2001) A three-station merge system with unreliable stations and a shared buffer. Mathematical and Computer Modeling, 33, 1011-1026.
    • (2001) Mathematical and Computer Modeling , vol.33 , pp. 1011-1026
    • Tan, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.