메뉴 건너뛰기




Volumn 224, Issue 1, 2010, Pages 169-176

Changing from conveyor to work-cell-based systems to deal with fluctuations in demand

(1)  Shishir, B N a  

a NONE   (India)

Author keywords

Conveyor; Demand variation; Material flow; Production systems

Indexed keywords

ALTERNATIVE PRODUCTION SYSTEMS; ASSEMBLY LINE; ASSEMBLY SYSTEMS; CELL-BASED; COMPETITIVE COSTS; CONSUMPTION PATTERNS; DEMAND VARIATIONS; MATERIAL FLOW; NEW PRODUCT; PRODUCTION SYSTEM;

EID: 76849092347     PISSN: 09544054     EISSN: None     Source Type: Journal    
DOI: 10.1243/09544054JEM1374     Document Type: Article
Times cited : (5)

References (19)
  • 1
    • 39149115366 scopus 로고    scopus 로고
    • Capacity analysis of a towline conveyor system in a distribution center
    • Pan, X. and Ding, F.-Y. Capacity analysis of a towline conveyor system in a distribution center. Int. J. Logistics Systems Mgmt, 2008, 4(2), 219-232.
    • (2008) Int. J. Logistics Systems Mgmt , vol.4 , Issue.2 , pp. 219-232
    • Pan, X.1    Ding, F.-Y.2
  • 2
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • Milind Dawande, H., Geismar, N., Sethi, S., and Sriskandarajah, C. Sequencing and scheduling in robotic cells: Recent developments. J. Scheduling, 2005, 8(5), 387-426.
    • (2005) J. Scheduling , vol.8 , Issue.5 , pp. 387-426
    • Milind Dawande, H.1    Geismar, N.2    Sethi, S.3    Sriskandarajah, C.4
  • 3
    • 52349093891 scopus 로고    scopus 로고
    • A novel approach for measuring agility in manufacturing firms
    • Garbie, I. H., Parsaei, H. R., and Leep, H. R. A novel approach for measuring agility in manufacturing firms. Int. J. Comput. Applic. Technol., 2008, 32(2), 95-103.
    • (2008) Int. J. Comput. Applic. Technol. , vol.32 , Issue.2 , pp. 95-103
    • Garbie, I.H.1    Parsaei, H.R.2    Leep, H.R.3
  • 4
    • 33144486490 scopus 로고    scopus 로고
    • A survey of automated material handling systems in 300mmsemiconductor fabs
    • Agrawal, G. K. and Heragu, S. S. A survey of automated material handling systems in 300mmsemiconductor fabs. IEEE Trans. Semiconductor Mfg, 2006, 19(1), 112-120.
    • (2006) IEEE Trans. Semiconductor Mfg , vol.19 , Issue.1 , pp. 112-120
    • Agrawal, G.K.1    Heragu, S.S.2
  • 5
    • 61549113997 scopus 로고    scopus 로고
    • Virtual factory approach for implementation of holonic control in industrial applications: A case study in die-casting industry
    • Bal, M. and Hashemipour, M. Virtual factory approach for implementation of holonic control in industrial applications: A case study in die-casting industry. Robotics and Computer-Integrated Mfg, 2009, 25(3), 570-581.
    • (2009) Robotics and Computer-Integrated Mfg , vol.25 , Issue.3 , pp. 570-581
    • Bal, M.1    Hashemipour, M.2
  • 6
    • 1642518668 scopus 로고    scopus 로고
    • Expected waiting times at loading stations in discrete-space closed - Loop conveyors
    • Bozer, Y. and Hsieh, Y.-J. Expected waiting times at loading stations in discrete-space closed - loop conveyors. Eur. J. Ops Res., 2004, 155, 516-532.
    • (2004) Eur. J. Ops Res. , vol.155 , pp. 516-532
    • Bozer, Y.1    Hsieh, Y.-J.2
  • 7
    • 2942562347 scopus 로고    scopus 로고
    • Flow shop scheduling with partial resource flexibility
    • Daniels, R. L., Mazzola, J. B., and Shi, D. Flow shop scheduling with partial resource flexibility. Mgmt Sci., 2004, 50(5), 658-669.
    • (2004) Mgmt Sci. , vol.50 , Issue.5 , pp. 658-669
    • Daniels, R.L.1    Mazzola, J.B.2    Shi, D.3
  • 8
    • 33750535173 scopus 로고    scopus 로고
    • A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs
    • Montoya-Torres, J. R. A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs. Prod. Planning Control, 2006, 17(7), 648-663.
    • (2006) Prod. Planning Control , vol.17 , Issue.7 , pp. 648-663
    • Montoya-Torres, J.R.1
  • 9
    • 4444280298 scopus 로고    scopus 로고
    • Some considerations relating to the reintroduction of assembly lines in the Swedish automotive industry
    • Jonsson, D., Medbo, L., and Engström, T. Some considerations relating to the reintroduction of assembly lines in the Swedish automotive industry. Int. J. Ops Prod. Mgmt, 2004, 24(8), 754-772.
    • (2004) Int. J. Ops Prod. Mgmt , vol.24 , Issue.8 , pp. 754-772
    • Jonsson, D.1    Medbo, L.2    Engström, T.3
  • 10
    • 53849129937 scopus 로고    scopus 로고
    • A cooperative control model for multi-agent based material handling systems
    • Lau, H. Y. K., Wong, V. W. K., and Ng, A. K. S. A cooperative control model for multi-agent based material handling systems. Expert Systems Applic.: Int. J., 2009, 36(1), 233-247.
    • (2009) Expert Systems Applic.: Int. J. , vol.36 , Issue.1 , pp. 233-247
    • Lau, H.Y.K.1    Wong, V.W.K.2    Ng, A.K.S.3
  • 11
    • 33947584391 scopus 로고    scopus 로고
    • Two-step simulation method for automatic material handling system of semiconductor fab
    • Kong, S. H. Two-step simulation method for automatic material handling system of semiconductor fab. Robotics Computer-Integrated Mfg, 2007, 23(4), 409-420.
    • (2007) Robotics Computer-Integrated Mfg , vol.23 , Issue.4 , pp. 409-420
    • Kong, S.H.1
  • 12
    • 46749096878 scopus 로고    scopus 로고
    • Implementing a hybrid simulation model for a Kanban-based material handling system
    • Hao, Q., Shen, W., and Stalk Jr, G. Implementing a hybrid simulation model for a Kanban-based material handling system. Robotics Computer-Integrated Mfg (Arch.), 2008, 24(5), 635-646.
    • (2008) Robotics Computer-Integrated Mfg (Arch.) , vol.24 , Issue.5 , pp. 635-646
    • Hao, Q.1    Shen, W.2    Stalk Jr., G.3
  • 13
    • 54949140734 scopus 로고    scopus 로고
    • Economic analysis for agility in manufacturing environment
    • Laith, A., Hadidi, I., and Rawabdeh, A. Economic analysis for agility in manufacturing environment. Int. J. Comput. Applic. Technol., 2008, 32(3), 232-241.
    • (2008) Int. J. Comput. Applic. Technol. , vol.32 , Issue.3 , pp. 232-241
    • Laith, A.1    Hadidi, I.2    Rawabdeh, A.3
  • 14
    • 44949140639 scopus 로고    scopus 로고
    • Hoshin Kanri planning: The system of five alignments behind the Toyota Production System
    • Mothersell, W. M., Moore, M. L., and Reinerth, M. W. Hoshin Kanri planning: the system of five alignments behind the Toyota Production System. Int. J. Business Innovation Res., 2008, 2(4), 381-401.
    • (2008) Int. J. Business Innovation Res. , vol.2 , Issue.4 , pp. 381-401
    • Mothersell, W.M.1    Moore, M.L.2    Reinerth, M.W.3
  • 15
    • 34248144929 scopus 로고    scopus 로고
    • A decision support tool to facilitate the design of cellular manufacturing layouts
    • Vitanov, V., Tjahjono, B., and Marghalany, I. A decision support tool to facilitate the design of cellular manufacturing layouts. Comput. Ind. Engng, 2007, 52(4), 380-403.
    • (2007) Comput. Ind. Engng , vol.52 , Issue.4 , pp. 380-403
    • Vitanov, V.1    Tjahjono, B.2    Marghalany, I.3
  • 16
    • 34648820050 scopus 로고    scopus 로고
    • Designing and redesigning cellular manufacturing systems to handle demand changes
    • Schaller, J. Designing and redesigning cellular manufacturing systems to handle demand changes. Comput. Ind. Engng, 2007, 53(3), 478-490.
    • (2007) Comput. Ind. Engng , vol.53 , Issue.3 , pp. 478-490
    • Schaller, J.1
  • 17
    • 24044464876 scopus 로고    scopus 로고
    • Study on integrated infrastructure for agile manufacturing systems
    • Lü, B., Li, Z., and Liu, K. Study on integrated infrastructure for agile manufacturing systems. J. Integrated Des. Process Sci., 2004, 8(4), 99-105.
    • (2004) J. Integrated Des. Process Sci. , vol.8 , Issue.4 , pp. 99-105
    • Lü, B.1    Li, Z.2    Liu, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.