메뉴 건너뛰기




Volumn 4, Issue 2, 2008, Pages 219-232

Capacity analysis of a towline conveyor system in a distribution center

Author keywords

Material handling; Maximum network flow; Towline conveyor

Indexed keywords


EID: 39149115366     PISSN: 17427967     EISSN: 17427975     Source Type: Journal    
DOI: 10.1504/IJLSM.2008.016572     Document Type: Article
Times cited : (4)

References (17)
  • 1
    • 0032396631 scopus 로고    scopus 로고
    • Network configuration and machine layout in fixed-path material handling systems
    • Al-Sultan, K.S. and Bozer, Y.A. (1998) 'Network configuration and machine layout in fixed-path material handling systems', Annals of Operations Research, Vol. 76, pp.21-54.
    • (1998) Annals of Operations Research , vol.76 , pp. 21-54
    • Al-Sultan, K.S.1    Bozer, Y.A.2
  • 2
    • 0034175326 scopus 로고    scopus 로고
    • Determination of vehicle requirements in automated guided vehicle systems: A statistical approach
    • Arifin, R. and Egbelu, P.J. (2000) 'Determination of vehicle requirements in automated guided vehicle systems: A statistical approach', Production planning & control, Vol. 11, pp.258-270.
    • (2000) Production planning & control , vol.11 , pp. 258-270
    • Arifin, R.1    Egbelu, P.J.2
  • 3
    • 0030380252 scopus 로고    scopus 로고
    • Bakst, J., Hoffner, J. and Jacoby, K. (1996) 'Evaluation of a distribution center tow-line material handling system through simulation modeling', Paper presented in the Proceedings of the 1996 Winter Simulation Conference, pp.1099-1106.
    • Bakst, J., Hoffner, J. and Jacoby, K. (1996) 'Evaluation of a distribution center tow-line material handling system through simulation modeling', Paper presented in the Proceedings of the 1996 Winter Simulation Conference, pp.1099-1106.
  • 4
    • 0033097441 scopus 로고    scopus 로고
    • Optimization-based planning heuristic for material flow congestion avoidance in conveyor network design
    • Banerjee, P., Banerjee, A. and Tesic, R. (1999) 'Optimization-based planning heuristic for material flow congestion avoidance in conveyor network design', Production Planning and Control, Vol. 10, pp.181-193.
    • (1999) Production Planning and Control , vol.10 , pp. 181-193
    • Banerjee, P.1    Banerjee, A.2    Tesic, R.3
  • 5
    • 0037323581 scopus 로고    scopus 로고
    • MaxFlow theory for availability calculation of automated material handling systems
    • Beschorner, A. and Glüer, D. (2003) 'MaxFlow theory for availability calculation of automated material handling systems', Robotics and Computer Integrated Manufacturing, Vol. 19, pp.141-145.
    • (2003) Robotics and Computer Integrated Manufacturing , vol.19 , pp. 141-145
    • Beschorner, A.1    Glüer, D.2
  • 6
    • 0033221999 scopus 로고    scopus 로고
    • Intelligent scheduling and control of rail-guided vehicles and load/unload operations in a flexible manufacturing system
    • Chen, F.F., Huang, J. and Centeno, M.A. (1999) 'Intelligent scheduling and control of rail-guided vehicles and load/unload operations in a flexible manufacturing system', Journal of Intelligent Manufacturing Vol. 10, pp.405-421.
    • (1999) Journal of Intelligent Manufacturing , vol.10 , pp. 405-421
    • Chen, F.F.1    Huang, J.2    Centeno, M.A.3
  • 7
    • 27944439698 scopus 로고    scopus 로고
    • A coloured Petri net model for automated storage and retrieval systems serviced by rail-guided vehicles: A control perspective
    • Dotoli, M. and Fanti, M. (2005) 'A coloured Petri net model for automated storage and retrieval systems serviced by rail-guided vehicles: A control perspective', Int. J. Integrated Manufacturing Vol. 18, pp.122-136.
    • (2005) Int. J. Integrated Manufacturing , vol.18 , pp. 122-136
    • Dotoli, M.1    Fanti, M.2
  • 8
    • 0002894516 scopus 로고
    • The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system
    • Egbelu, P.J. (1987) 'The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system', Material Flow, Vol. 4, pp.17-32.
    • (1987) Material Flow , vol.4 , pp. 17-32
    • Egbelu, P.J.1
  • 9
    • 0031375136 scopus 로고    scopus 로고
    • Estimating mean response time and positioning idle vehicles of Automated Guided Vehicle Systems in loop layout
    • Kim, K.H. and Kim, J.Y. (1997) 'Estimating mean response time and positioning idle vehicles of Automated Guided Vehicle Systems in loop layout', Computers and Industrial Engineering, Vol. 33, pp.669-672.
    • (1997) Computers and Industrial Engineering , vol.33 , pp. 669-672
    • Kim, K.H.1    Kim, J.Y.2
  • 10
    • 39149111102 scopus 로고    scopus 로고
    • Cumins engine: The power of flexibility
    • Lecrone, R. (2005) 'Cumins engine: The power of flexibility', Modern Materials Handling, pp.51-52.
    • (2005) Modern Materials Handling , pp. 51-52
    • Lecrone, R.1
  • 11
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle system
    • Maxwell, W.L. and Muckstadt, J.A. (1982) 'Design of automatic guided vehicle system', IIE Transactions, Vol. 14, pp.114-124.
    • (1982) IIE Transactions , vol.14 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 12
    • 33751425926 scopus 로고    scopus 로고
    • Performance analysis of a multiple vehicle tandem system with inter-vehicle buffers and blocking
    • Petering, M.E.H., Seo, J. and Lee C. (2007) 'Performance analysis of a multiple vehicle tandem system with inter-vehicle buffers and blocking', Computers in Industry, Vol. 58, pp.3-11.
    • (2007) Computers in Industry , vol.58 , pp. 3-11
    • Petering, M.E.H.1    Seo, J.2    Lee, C.3
  • 13
    • 0025417539 scopus 로고
    • An analytical method for configuring fixed-path, closed-loop material handling systems
    • Sharp, G.P. and Liu, F.F. (1990) 'An analytical method for configuring fixed-path, closed-loop material handling systems', Int. J. Production Research, Vol. 28, pp.757-783.
    • (1990) Int. J. Production Research , vol.28 , pp. 757-783
    • Sharp, G.P.1    Liu, F.F.2
  • 14
    • 0026938781 scopus 로고
    • Impact of empty vehicle flow on performance of single-loop AGV systems
    • Sinriech, D. and Tanchoco, J.M.A. (1992) 'Impact of empty vehicle flow on performance of single-loop AGV systems', Int. J. Production Research, Vol. 30, pp.2237-2252.
    • (1992) Int. J. Production Research , vol.30 , pp. 2237-2252
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 15
    • 0028195172 scopus 로고
    • Trip-based material handling systems: Throughput capacity analysis
    • Srinivasan, M.M., Bozer, Y.A. and Cho, M. (1994) 'Trip-based material handling systems: Throughput capacity analysis', IIE Transactions, Vol. 26, pp.70-89
    • (1994) IIE Transactions , vol.26 , pp. 70-89
    • Srinivasan, M.M.1    Bozer, Y.A.2    Cho, M.3
  • 16
    • 1642587713 scopus 로고    scopus 로고
    • Performance evaluation of an automated material handling system for a wafer fab
    • Wang, F.K. and J.T. Lin (2004) 'Performance evaluation of an automated material handling system for a wafer fab', Robotics and Computer-Integrated Manufacturing, Vol. 20, pp.91-100.
    • (2004) Robotics and Computer-Integrated Manufacturing , vol.20 , pp. 91-100
    • Wang, F.K.1    Lin, J.T.2
  • 17
    • 39149122376 scopus 로고    scopus 로고
    • Assembly line a cut above
    • April, pp
    • Witt, C. (2006) 'Assembly line a cut above', Material Handling Management, April, pp.43-44.
    • (2006) Material Handling Management , pp. 43-44
    • Witt, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.