Alternative Loading and Dispatching Policies for Furnace Operations in Semiconductor Manufacturing: A Comparison by Simulation
-
ed .J. A. Joines, R.R. Barton, K. Kang, and P. A. Fishwick
-
Akçali, E., Uzsoy, R., Hiscock, D.G., Moser, A.L. and Teyner, T.J. 2000. "Alternative Loading and Dispatching Policies for Furnace Operations in Semiconductor Manufacturing: A Comparison by Simulation". In Proceedings of the 2000 Winter Simulation Conference, ed .J. A. Joines, R.R. Barton, K. Kang, and P. A. Fishwick, 1428-1435.
-
(2000)
Proceedings of the 2000 Winter Simulation Conference
, pp. 1428-1435
-
-
Akçali, E.1
Uzsoy, R.2
Hiscock, D.G.3
Moser, A.L.4
Teyner, T.J.5
-
2
-
-
0004118346
-
-
Kluwer Academic Publishers, Boston, Dordrecht, London
-
Atherton, L.F. and Atherton, R.W. 1995. "Wafer Fabrication: Factory Performance and Analysis". Kluwer Academic Publishers, Boston, Dordrecht, London.
-
(1995)
"Wafer Fabrication: Factory Performance and Analysis"
-
-
Atherton, L.F.1
Atherton, R.W.2
-
3
-
-
1542685255
-
Genetic Algorithm Based Scheduling of Parallel Batch Machines with Incompatible Job Families to Minimize Total Weighted Tardiness
-
Balasubramanian, H., Mönch, L., Fowler, J.W. and Pfund, M.E. 2004. "Genetic Algorithm Based Scheduling of Parallel Batch Machines with Incompatible Job Families to Minimize Total Weighted Tardiness". International Journal of Production Research 42(8): 1621-1638.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.8
, pp. 1621-1638
-
-
Balasubramanian, H.1
Mönch, L.2
Fowler, J.W.3
Pfund, M.E.4
-
4
-
-
0347647939
-
A New Dynamic Look-Ahead Scheduling Procedure for Batching Machines
-
Cigolini, R., Perona, M., Portioli, A. and Zambeli, T. 2002. "A New Dynamic Look-Ahead Scheduling Procedure for Batching Machines". Journal of Scheduling 5: 185-204.
-
(2002)
Journal of Scheduling
, vol.5
, pp. 185-204
-
-
Cigolini, R.1
Perona, M.2
Portioli, A.3
Zambeli, T.4
-
5
-
-
0031506199
-
Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates
-
Chand, S., Traub, R. and Uzsoy, R. 1997. "Rolling Horizon Procedures for the Single Machine Deterministic Total Completion Time Scheduling Problem with Release Dates". Annals of Operations Research 70:115-125.
-
(1997)
Annals of Operations Research
, vol.70
, pp. 115-125
-
-
Chand, S.1
Traub, R.2
Uzsoy, R.3
-
6
-
-
0034135518
-
Control of Multiproduct Bulk Server Diffusion/ Oxidation Processes, Part Two: Multiple Servers
-
Fowler, J.W., Hogg, G.L. and Phillips, D.T. 2000. "Control of Multiproduct Bulk Server Diffusion/ Oxidation Processes, Part Two: Multiple Servers". IIE Transactions on Scheduling and Logistics 32(2): 167-176.
-
(2000)
IIE Transactions on Scheduling and Logistics
, vol.32
, Issue.2
, pp. 167-176
-
-
Fowler, J.W.1
Hogg, G.L.2
Phillips, D.T.3
-
7
-
-
0026866908
-
Real-time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes
-
Fowler, J.W., Phillips, D.T. and Hogg, G.L. 1992. "Real-time Control of Multiproduct Bulk-Service Semiconductor Manufacturing Processes". IEEE Transactions on Semiconductor Manufacturig, 5(2): 158-163.
-
(1992)
IEEE Transactions on Semiconductor Manufacturig
, vol.5
, Issue.2
, pp. 158-163
-
-
Fowler, J.W.1
Phillips, D.T.2
Hogg, G.L.3
-
8
-
-
0003446035
-
-
Technical Report 95062861A-TR, SEMATECH, Austin, TX
-
Fowler, J.W. and Robinson, J. 1995. "Measurement and Improvement of Manufacturing Capacities (MIMAC): Final Report". Technical Report 95062861A-TR, SEMATECH, Austin, TX.
-
(1995)
"Measurement and Improvement of Manufacturing Capacities (MIMAC): Final Report"
-
-
Fowler, J.W.1
Robinson, J.2
-
10
-
-
0036927906
-
A Finite-Capacity Beam-Search Algorithm for Production Scheduling in Semiconductor Manufacturing
-
ed. E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes
-
Habenicht, I. and Mönch, L. 2002. "A Finite-Capacity Beam-Search Algorithm for Production Scheduling in Semiconductor Manufacturing". In Proceedings of the 2002 Winter Simulation Conference, ed. E. Yücesan, C.-H. Chen, J. L. Snowdon, and J. M. Charnes, 1406-1413.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1406-1413
-
-
Habenicht, I.1
Mönch, L.2
-
11
-
-
0042622980
-
A Modified Shifting Bottleneck Heuristic for Minimizing Total Weighted Tardiness in Complex Job Shops
-
Mason, S., Fowler, J.W. and Carlyle, W.M. 2002. "A Modified Shifting Bottleneck Heuristic for Minimizing Total Weighted Tardiness in Complex Job Shops". Journal of Scheduling 5: 247-262.
-
(2002)
Journal of Scheduling
, vol.5
, pp. 247-262
-
-
Mason, S.1
Fowler, J.W.2
Carlyle, W.M.3
-
13
-
-
1642477915
-
Simulation-Based Assessment of Batching Heuristics in Semiconductor Manufacturing
-
ed. S Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice
-
Mönch, L. and Habenicht, I. 2003. "Simulation-Based Assessment of Batching Heuristics in Semiconductor Manufacturing". In Proceedings of the 2003 Winter Simulation Conference, ed. S Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice, 1338-1345.
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 1338-1345
-
-
Mönch, L.1
Habenicht, I.2
-
14
-
-
18544406120
-
Simulation Framework for the Performance Assessment of Shop-Floor Control Systems
-
Mönch, L., Rose, O. and Sturm, R. 2003. "Simulation Framework for the Performance Assessment of Shop-Floor Control Systems". SIMULATION: Transactions of the Society for Modeling and Simulation International 79(3): 121-128.
-
(2003)
SIMULATION: Transactions of the Society for Modeling and Simulation International
, vol.79
, Issue.3
, pp. 121-128
-
-
Mönch, L.1
Rose, O.2
Sturm, R.3
-
15
-
-
13844256873
-
Heuristic Scheduling of Jobs on Parallel Batch Machines with Incompatible Job Families and Unequal Ready Times
-
Mönch, L., Balasubramanian, H., Fowler, J.W. and Pfund, M.E. 2005. "Heuristic Scheduling of Jobs on Parallel Batch Machines with Incompatible Job Families and Unequal Ready Times". To Appear in Computers & Operations Research.
-
(2005)
To Appear in Computers & Operations Research
-
-
Mönch, L.1
Balasubramanian, H.2
Fowler, J.W.3
Pfund, M.E.4
-
17
-
-
0029341463
-
The Use of Upstream and Downstream Information in Scheduling Semiconductor Batch Operations
-
Robinson, J.K., Fowler, J.W. and Bard, J.F. 1995. "The Use of Upstream and Downstream Information in Scheduling Semiconductor Batch Operations". International Journal of Production Research 33(7): 1849-1869.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.7
, pp. 1849-1869
-
-
Robinson, J.K.1
Fowler, J.W.2
Bard, J.F.3
-
19
-
-
84952240555
-
A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning
-
Uzsoy, R., Lee, C.-Y. and Martin-Vega, L.A. 1992. "A Review of Production Planning and Scheduling Models in the Semiconductor Industry, Part I: System Characteristics, Performance Evaluation and Production Planning". IIE Transactions on Scheduling and Logistics 24: 47-61.
-
(1992)
IIE Transactions on Scheduling and Logistics
, vol.24
, pp. 47-61
-
-
Uzsoy, R.1
Lee, C.-Y.2
Martin-Vega, L.A.3
-
20
-
-
1642559538
-
Look-Ahead Strategies for Controlling Batch Operations in Industry-an Overview
-
ed. S Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice
-
Van der Zee, D.-J. 2003. "Look-Ahead Strategies for Controlling Batch Operations in Industry-an Overview". In Proceedings of the 2003 Winter Simulation Conference, ed. S Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice, 1480-1487.
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 1480-1487
-
-
Van Der Zee, D.-J.1
-
21
-
-
0023399009
-
Priority Rules for Job Shop Scheduling with Weighted Tardiness Costs
-
Vepsalainen, A. and Morton, T.E. 1987. "Priority Rules for Job Shop Scheduling with Weighted Tardiness Costs". Management Science 33: 1036-1047.
-
(1987)
Management Science
, vol.33
, pp. 1036-1047
-
-
Vepsalainen, A.1
Morton, T.E.2
|