메뉴 건너뛰기




Volumn 2, Issue , 2003, Pages 1480-1487

Look-ahead strategies for controlling batch operations in industry - An overview

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COST EFFECTIVENESS; CUSTOMER SATISFACTION; DECISION MAKING; FABRICATION; FORECASTING; OVENS; SCHEDULING; SILICON WAFERS; THROUGHPUT;

EID: 1642559538     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (8)

References (18)
  • 1
    • 0031514083 scopus 로고    scopus 로고
    • Stochastic scheduling of a batch processing machine with incompatible job families
    • Duenyas, I. and J.J. Neale. 1997. Stochastic scheduling of a batch processing machine with incompatible job families. Annals of the Operations Research 70:191-220.
    • (1997) Annals of the Operations Research , vol.70 , pp. 191-220
    • Duenyas, I.1    Neale, J.J.2
  • 2
    • 84952175124 scopus 로고
    • Control of multiproduct bulk service diffusion/oxidation processes
    • Fowler, J.W., Hogg, G.L. and D.T. Phillips. 1992. Control of multiproduct bulk service diffusion/oxidation processes. IIE Transactions 24:84-96.
    • (1992) IIE Transactions , vol.24 , pp. 84-96
    • Fowler, J.W.1    Hogg, G.L.2    Phillips, D.T.3
  • 3
    • 0034135518 scopus 로고    scopus 로고
    • Control of multiproduct bulk service diffusion/oxidation processes. Part 2: Multiple servers
    • Fowler, J.W., Hogg, G.L and D.T. Phillips. 2000. Control of multiproduct bulk service diffusion/oxidation processes. Part 2: Multiple servers. IIE Transactions 32:167-176.
    • (2000) IIE Transactions , vol.32 , pp. 167-176
    • Fowler, J.W.1    Hogg, G.L.2    Phillips, D.T.3
  • 6
    • 0003937136 scopus 로고
    • On line planning van ovens
    • University of Twente, The Netherlands (in Dutch)
    • Hodes, B., Schoonhoven, B. and R. Swart. 1992. On line planning van ovens. Technical Report, University of Twente, The Netherlands (in Dutch).
    • (1992) Technical Report
    • Hodes, B.1    Schoonhoven, B.2    Swart, R.3
  • 7
    • 0034311102 scopus 로고    scopus 로고
    • Control of manufacturing networks which contain a batch processing machine
    • Neale, J.J. and I. Duenyas. 2000. Control of manufacturing networks which contain a batch processing machine. IIE Transactions 32:1027-1041.
    • (2000) IIE Transactions , vol.32 , pp. 1027-1041
    • Neale, J.J.1    Duenyas, I.2
  • 8
    • 0000688623 scopus 로고
    • A general class of bulk queues with Poisson input
    • Neuts, M.F. 1967. A general class of bulk queues with Poisson input. Annals of Mathematical Statistics, 38:759-770.
    • (1967) Annals of Mathematical Statistics , vol.38 , pp. 759-770
    • Neuts, M.F.1
  • 10
    • 0029341463 scopus 로고
    • The use of upstream and downstream information in scheduling semiconductor batch operations
    • Robinson, J.K., Fowler, J.W. and J.F. Bard. 1995. The use of upstream and downstream information in scheduling semiconductor batch operations. International Journal of Production Research 33:1849-1869.
    • (1995) International Journal of Production Research , vol.33 , pp. 1849-1869
    • Robinson, J.K.1    Fowler, J.W.2    Bard, J.F.3
  • 11
    • 0002657699 scopus 로고
    • A heuristic for selecting lot size quantities for the case of a deterministic time varying demand rate and discrete opportunities for replenishment
    • Silver, E.A. and H.C. Meal. 1973. A heuristic for selecting lot size quantities for the case of a deterministic time varying demand rate and discrete opportunities for replenishment. Production and Inventory Management 14, 64-74.
    • (1973) Production and Inventory Management , vol.14 , pp. 64-74
    • Silver, E.A.1    Meal, H.C.2
  • 12
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.Y. and L.A. Martin-Vega. 1992. A review of production planning and scheduling models in the semiconductor industry, Part I: System characteristics, performance evaluation and production planning. IIE Transactions 24:47-60
    • (1992) IIE Transactions , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 13
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part II: Shop-floor control
    • Uzsoy, R., Lee, C.Y. and L.A. Martin-Vega. 1994. A review of production planning and scheduling models in the semiconductor industry, Part II: Shop-floor control. IIE Transactions 26:44-55.
    • (1994) IIE Transactions , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 14
    • 0029338650 scopus 로고
    • Scheduling groups of jobs on a single machine
    • Webster, S. and K.R. Baker. 1995. Scheduling groups of jobs on a single machine. Operations Research 43:692-703.
    • (1995) Operations Research , vol.43 , pp. 692-703
    • Webster, S.1    Baker, K.R.2
  • 15
    • 0027648685 scopus 로고
    • An improved methodology for real-time production decisions at batch-process work stations
    • Weng, W.W. and R.C. Leachman,. 1993. An improved methodology for real-time production decisions at batch-process work stations. IEEE Transactions on Semiconductor Manufacturing 6:219-225.
    • (1993) IEEE Transactions on Semiconductor Manufacturing , vol.6 , pp. 219-225
    • Weng, W.W.1    Leachman, R.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.