메뉴 건너뛰기




Volumn 48, Issue 5, 2010, Pages 1339-1359

Dynamic control of the batch processor in a serial-batch processor system with mean tardiness performance

Author keywords

Batch process control; Look ahead batching; Mean tardiness

Indexed keywords

ARRIVAL TIME; BATCH PROCESS CONTROL; BATCH PROCESSORS; CONTROL STRATEGIES; DYNAMIC CONTROLS; LOOK-AHEAD; MEAN TARDINESS; ON-TIME DELIVERY; PROCESSOR SYSTEMS; PRODUCT INFORMATION; SEMICONDUCTOR MANUFACTURING; TWO STAGE;

EID: 74549172517     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802641437     Document Type: Article
Times cited : (18)

References (23)
  • 2
    • 1542685255 scopus 로고    scopus 로고
    • Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness
    • Balasubramanian, H., et al., 2004. Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardiness. International Journal of Production Research, 42 (8), 1621-1638.
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1621-1638
    • Balasubramanian, H.1
  • 4
    • 0347647939 scopus 로고    scopus 로고
    • A new dynamic look-ahead scheduling procedure for batching machines
    • Cigolini, R., et al., 2002. A new dynamic look-ahead scheduling procedure for batching machines. Journal of Scheduling, 5 (2), 185-204.
    • (2002) Journal of Scheduling , vol.5 , Issue.2 , pp. 185-204
    • Cigolini, R.1
  • 5
  • 6
    • 0031514083 scopus 로고    scopus 로고
    • Stochastic scheduling of a batch processing machine with incompatible job families
    • Duenyas, I. and Neale, J.J., 1997. Stochastic scheduling of a batch processing machine with incompatible job families. Annals of Operations Research, 70 (1), 191-220.
    • (1997) Annals of Operations Research , vol.70 , Issue.1 , pp. 191-220
    • Duenyas, I.1    Neale, J.J.2
  • 7
    • 0026866908 scopus 로고
    • Real-time control of multiproduct bulk-service semiconductor manufacturing processes
    • Fowler, J.W., Phillips, D.T., and Hogg, G.L., 1992. Real-time control of multiproduct bulk-service semiconductor manufacturing processes. IEEE Transactions on Semiconductor Manufacturing, 5 (2), 158-163.
    • (1992) IEEE Transactions on Semiconductor Manufacturing , vol.5 , Issue.2 , pp. 158-163
    • Fowler, J.W.1    Phillips, D.T.2    Hogg, G.L.3
  • 9
    • 33847059294 scopus 로고    scopus 로고
    • Controlling delivery performance in semiconductor manufacturing using look ahead batching
    • Gupta, A.K. and Sivakumar, A.I., 2007. Controlling delivery performance in semiconductor manufacturing using look ahead batching. International Journal of Production Research, 45 (3), 591-613.
    • (2007) International Journal of Production Research , vol.45 , Issue.3 , pp. 591-613
    • Gupta, A.K.1    Sivakumar, A.I.2
  • 10
    • 74549195450 scopus 로고    scopus 로고
    • Simulation-based assessment of batching strategies in a multi product semiconductor wafer fabrication facility
    • Habenicht, I. and Monch, L., 2005. Simulation-based assessment of batching strategies in a multi product semiconductor wafer fabrication facility. International Journal of Simulation: Systems, Science & Technology, 6 (5), 3-13.
    • (2005) International Journal of Simulation: Systems, Science & Technology , vol.6 , Issue.5 , pp. 3-13
    • Habenicht, I.1    Monch, L.2
  • 11
    • 0035485317 scopus 로고    scopus 로고
    • Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates
    • Kim, Y.D., et al., 2001. Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates. IEEE Transactions on Robotics and Automation, 17 (5), 589-598.
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 589-598
    • Kim, Y.D.1
  • 12
    • 0042622980 scopus 로고    scopus 로고
    • A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops
    • Mason, S.J., Fowler, J.W., and Carlyle, W.M., 2002. A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops. Journal of Scheduling, 5 (3), 247-262.
    • (2002) Journal of Scheduling , vol.5 , Issue.3 , pp. 247-262
    • Mason, S.J.1    Fowler, J.W.2    Carlyle, W.M.3
  • 13
    • 33646200244 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families
    • Mathirajan, M. and Sivakumar, A.I., 2006. Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families. International Journal of Advanced Manufacturing Technology, 28 (9), 1038-1047.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.28 , Issue.9 , pp. 1038-1047
    • Mathirajan, M.1    Sivakumar, A.I.2
  • 14
    • 0032003105 scopus 로고    scopus 로고
    • Minimizing total tardiness on a batch processing machine with incompatible job families
    • Mehta, S.V. and Uzsoy, R., 1998. Minimizing total tardiness on a batch processing machine with incompatible job families. IIE Transactions, 30 (2), 165-178.
    • (1998) IIE Transactions , vol.30 , Issue.2 , pp. 165-178
    • Mehta, S.V.1    Uzsoy, R.2
  • 15
    • 13844256873 scopus 로고    scopus 로고
    • Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
    • Monch, L., et al., 2005. Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Computers & Operations Research, 32 (11), 2731-2750.
    • (2005) Computers & Operations Research , vol.32 , Issue.11 , pp. 2731-2750
    • Monch, L.1
  • 16
    • 31744446040 scopus 로고    scopus 로고
    • Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines
    • Monch, L., Zimmermann, J., and Otto, P., 2006. Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. Engineering Applications of Artificial Intelligence, 19 (3), 235-245.
    • (2006) Engineering Applications of Artificial Intelligence , vol.19 , Issue.3 , pp. 235-245
    • Monch, L.1    Zimmermann, J.2    Otto, P.3
  • 17
    • 0000688623 scopus 로고
    • A general class of bulk queues with Poisson input
    • Neuts, M.F., 1967. A general class of bulk queues with Poisson input. The Annals of Mathematical Statistics, 38 (3), 759-770.
    • (1967) The Annals of Mathematical Statistics , vol.38 , Issue.3 , pp. 759-770
    • Neuts, M.F.1
  • 18
    • 4544293356 scopus 로고    scopus 로고
    • Minimizing total weighted tardiness on a single batch process machine with incompatible job families
    • Perez, I.C., Fowler, J.W., and Carlyle, W.M., 2005. Minimizing total weighted tardiness on a single batch process machine with incompatible job families. Computers and Operations Research, 32 (2), 327-341.
    • (2005) Computers and Operations Research , vol.32 , Issue.2 , pp. 327-341
    • Perez, I.C.1    Fowler, J.W.2    Carlyle, W.M.3
  • 19
    • 0029341463 scopus 로고
    • Use of upstream and downstream information in scheduling semiconductor batch operations
    • Robinson, J.K., Fowler, J.W., and Bard, J.F., 1995. Use of upstream and downstream information in scheduling semiconductor batch operations. International Journal of Production Research, 33 (7), 1849-1869.
    • (1995) International Journal of Production Research , vol.33 , Issue.7 , pp. 1849-1869
    • Robinson, J.K.1    Fowler, J.W.2    Bard, J.F.3
  • 20
    • 33750573293 scopus 로고    scopus 로고
    • A branch and bound algorithm to minimize total weighted tardiness on a single batch processing machine with ready times and incompatible job families
    • Tangudu, S.K. and Kurz, M.E., 2006. A branch and bound algorithm to minimize total weighted tardiness on a single batch processing machine with ready times and incompatible job families. Production Planning and Control, 17 (7), 728-41.
    • (2006) Production Planning and Control , vol.17 , Issue.7 , pp. 728-741
    • Tangudu, S.K.1    Kurz, M.E.2
  • 21
    • 0031276822 scopus 로고    scopus 로고
    • Dynamic job assignment heuristics for multi-server batch operations-a cost based approach
    • Van der Zee, D.J., Van Harten, A., and Schuur, P.C., 1997. Dynamic job assignment heuristics for multi-server batch operations-a cost based approach. International Journal of Production Research, 35 (11), 3063-3093.
    • (1997) International Journal of Production Research , vol.35 , Issue.11 , pp. 3063-3093
    • Van der Zee, D.J.1    Van Harten, A.2    Schuur, P.C.3
  • 22
  • 23
    • 0023399009 scopus 로고
    • Priority rules for job shops with weighted tardiness costs
    • Vepsalainen, A.P.J. and Morton, T.E., 1987. Priority rules for job shops with weighted tardiness costs. Management Science, 33 (8), 1035-1047.
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.