-
1
-
-
5244317693
-
Numerical methods in Markov chains and bulk queues
-
M. Beckmann, G. Goos and H. P. Kunzi, Berlin: Springer
-
Bagchi, T. P., and Templeton, J. G. C., 1972, Numerical methods in Markov chains and bulk queues. In Lecture Notes in Economics and Mathematical Systems, M. Beckmann, G. Goos and H. P. Kunzi (eds), 72, (Berlin: Springer).
-
(1972)
Lecture Notes in Economics and Mathematical Systems
, pp. 72
-
-
Bagchi, T.P.1
Templeton, J.G.C.2
-
2
-
-
3342929214
-
-
Amsterdam: Bakkenist ExSpect)
-
Bakkenist Management Consultants, 1994, ExSpect User Manual (Amsterdam: Bakkenist ExSpect).
-
(1994)
Exspect User Manual
-
-
-
3
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J. H., Phillips, D. T., and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20 (1), 27-45.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.1
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
6
-
-
0004113622
-
-
Reading, MA: Addison Wesley)
-
Conway, R. W., Maxwell, W. L., and Miller, L. W., 1967, Theory of Scheduling (Reading, MA: Addison Wesley).
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
7
-
-
0001690558
-
Optimal control of batch service queues
-
Deb, R. K., and Serfozo, R. F., 1973, Optimal control of batch service queues. Advances in Applied Probability, 5, 340-361.
-
(1973)
Advances in Applied Probability
, vol.5
, pp. 340-361
-
-
Deb, R.K.1
Serfozo, R.F.2
-
8
-
-
84952175124
-
Control of multiproduct bulk service diffusion/oxidation processes
-
Fowler, J. W., Hogg, G. L., and Phillips, D. T., 1992, Control of multiproduct bulk service diffusion/oxidation processes. IIE Transactions, 24 (4), 84-96.
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 84-96
-
-
Fowler, J.W.1
Hogg, G.L.2
Phillips, D.T.3
-
9
-
-
0003901572
-
Nonparametric statistical inference
-
D. B. Owen and W. R. Schucany, New Y ork: Marcel Dekker
-
Gibbons, J. D., and Chakraborti, S., 1992, Nonparametric statistical inference. In Statistics: Textbooks and Monographs, D. B. Owen and W. R. Schucany (eds) 131 (New Y ork: Marcel Dekker).
-
(1992)
Statistics: Textbooks and Monographs
, pp. 131
-
-
Gibbons, J.D.1
Chakraborti, S.2
-
10
-
-
0026153052
-
Dynamic batching heuristic for simultaneous processing
-
Glassey, C. R., and Weng, W. W., 1991, Dynamic batching heuristic for simultaneous processing. IEEE Transactions on Semiconductor Manufacturing, 4 (2), 77-82.
-
(1991)
IEEE Transactions on Semiconductor Manufacturing
, vol.4
, Issue.2
, pp. 77-82
-
-
Glassey, C.R.1
Weng, W.W.2
-
11
-
-
0002426790
-
Real time scheduling of batch operations
-
T. A. Ciriani and R. C. Leachman (eds) (Chichester: Wiley
-
Glassey, C. R., Markgraf, F., and Fromm, H., 1993, Real time scheduling of batch operations. In Optimization in Industry: Mathematical Programming and Modeling Techniques in Practice, T. A. Ciriani and R. C. Leachman (eds) (Chichester: Wiley), pp. 113-137.
-
(1993)
Optimization in Industry: Mathematical Programming and Modeling Techniques in Practice
, pp. 113-137
-
-
Glassey, C.R.1
Markgraf, F.2
Fromm, H.3
-
12
-
-
0003937136
-
-
Technical report, University of Twente, The Netherlands (in Dutch)
-
Hodes, B., Schoonhoven, B., and Swart, R., 1992, On line planning van ovens. Technical report, University of Twente, The Netherlands (in Dutch).
-
(1992)
On Line Planning Van Ovens.
-
-
Hodes, B.1
Schoonhoven, B.2
Swart, R.3
-
15
-
-
0000861722
-
A proof for the queueing formula: L = AW
-
Little, J. D. C., 1961, A proof for the queueing formula: L = AW. Operations Research, 9, 383-387.
-
(1961)
Operations Research
, vol.9
, pp. 383-387
-
-
Little, J.D.C.1
-
16
-
-
0000688623
-
A general class of bulk queues with Poisson input
-
Neuts, M. E., 1967, A general class of bulk queues with Poisson input. Annals of Mathematical Statistics, 38, 759-770.
-
(1967)
Annals of Mathematical Statistics
, vol.38
, pp. 759-770
-
-
Neuts, M.E.1
-
17
-
-
0029341463
-
The use of upstream and downstream information in scheduling semiconductor batch operations
-
Robinson, J. K., Fowler, J. W., and Bard, J. F., 1995, The use of upstream and downstream information in scheduling semiconductor batch operations. International Journal of Production Research, 33 (8), 1849-1869.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.8
, pp. 1849-1869
-
-
Robinson, J.K.1
Fowler, J.W.2
Bard, J.F.3
-
18
-
-
0002657699
-
A heuristic for selecting lot size quantities for the case of a deterministic time varying demand rate and discrete opportunities for replenishment
-
Silver, E. A., and Meal, H. C., 1973, A heuristic for selecting lot size quantities for the case of a deterministic time varying demand rate and discrete opportunities for replenishment. Production and Inventory Management, 14, 64-74.
-
(1973)
Production and Inventory Management
, vol.14
, pp. 64-74
-
-
Silver, E.A.1
Meal, H.C.2
-
19
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductory industry, Part I: System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., 1992, A review of production planning and scheduling models in the semiconductory industry, Part I: System characteristics, performance evaluation and production planning. IIE Transactions, 24 (4), 47-60.
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
20
-
-
0028496979
-
A review of production planning and scheduling models in the semi-conductor industry, Part II: Shop-floor control
-
Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., 1994, A review of production planning and scheduling models in the semi-conductor industry, Part II: Shop-floor control. IIE Transactions, 26 (5), 44-55.
-
(1994)
IIE Transactions
, vol.26
, Issue.5
, pp. 44-55
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
21
-
-
0027648685
-
An improved methodology for real-time production decisions at batch-process workstations
-
Weng, W. W., and Leachman, R. C., 1993, An improved methodology for real-time production decisions at batch-process workstations. IEEE Transactions on Semiconductor Manufacturing, 6 (3), 219-225.
-
(1993)
IEEE Transactions on Semiconductor Manufacturing
, vol.6
, Issue.3
, pp. 219-225
-
-
Weng, W.W.1
Leachman, R.C.2
-
23
-
-
85023591823
-
-
University of Twente, The Netherlands
-
van der Zee, D. J., Harten, A., and van Schuur, P. C., 1995, Business Simulation for Logistics Management, Technical report, University of Twente, The Netherlands.
-
(1995)
Business Simulation for Logistics Management, Technical Report
-
-
Van Der Zee, D.J.1
Harten, A.2
Van Schuur, P.C.3
|