메뉴 건너뛰기




Volumn 35, Issue 11, 1997, Pages 3063-3094

Dynamic job assignment heuristics for multi-server batch operations- A cost based approach

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; HEURISTIC METHODS; OPERATIONS RESEARCH; SCHEDULING; STRATEGIC PLANNING;

EID: 0031276822     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075497194291     Document Type: Article
Times cited : (55)

References (23)
  • 1
    • 5244317693 scopus 로고
    • Numerical methods in Markov chains and bulk queues
    • M. Beckmann, G. Goos and H. P. Kunzi, Berlin: Springer
    • Bagchi, T. P., and Templeton, J. G. C., 1972, Numerical methods in Markov chains and bulk queues. In Lecture Notes in Economics and Mathematical Systems, M. Beckmann, G. Goos and H. P. Kunzi (eds), 72, (Berlin: Springer).
    • (1972) Lecture Notes in Economics and Mathematical Systems , pp. 72
    • Bagchi, T.P.1    Templeton, J.G.C.2
  • 2
    • 3342929214 scopus 로고
    • Amsterdam: Bakkenist ExSpect)
    • Bakkenist Management Consultants, 1994, ExSpect User Manual (Amsterdam: Bakkenist ExSpect).
    • (1994) Exspect User Manual
  • 3
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J. H., Phillips, D. T., and Hogg, G. L., 1982, A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20 (1), 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.H.1    Phillips, D.T.2    Hogg, G.L.3
  • 8
    • 84952175124 scopus 로고
    • Control of multiproduct bulk service diffusion/oxidation processes
    • Fowler, J. W., Hogg, G. L., and Phillips, D. T., 1992, Control of multiproduct bulk service diffusion/oxidation processes. IIE Transactions, 24 (4), 84-96.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 84-96
    • Fowler, J.W.1    Hogg, G.L.2    Phillips, D.T.3
  • 9
    • 0003901572 scopus 로고
    • Nonparametric statistical inference
    • D. B. Owen and W. R. Schucany, New Y ork: Marcel Dekker
    • Gibbons, J. D., and Chakraborti, S., 1992, Nonparametric statistical inference. In Statistics: Textbooks and Monographs, D. B. Owen and W. R. Schucany (eds) 131 (New Y ork: Marcel Dekker).
    • (1992) Statistics: Textbooks and Monographs , pp. 131
    • Gibbons, J.D.1    Chakraborti, S.2
  • 15
    • 0000861722 scopus 로고
    • A proof for the queueing formula: L = AW
    • Little, J. D. C., 1961, A proof for the queueing formula: L = AW. Operations Research, 9, 383-387.
    • (1961) Operations Research , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 16
    • 0000688623 scopus 로고
    • A general class of bulk queues with Poisson input
    • Neuts, M. E., 1967, A general class of bulk queues with Poisson input. Annals of Mathematical Statistics, 38, 759-770.
    • (1967) Annals of Mathematical Statistics , vol.38 , pp. 759-770
    • Neuts, M.E.1
  • 17
    • 0029341463 scopus 로고
    • The use of upstream and downstream information in scheduling semiconductor batch operations
    • Robinson, J. K., Fowler, J. W., and Bard, J. F., 1995, The use of upstream and downstream information in scheduling semiconductor batch operations. International Journal of Production Research, 33 (8), 1849-1869.
    • (1995) International Journal of Production Research , vol.33 , Issue.8 , pp. 1849-1869
    • Robinson, J.K.1    Fowler, J.W.2    Bard, J.F.3
  • 18
    • 0002657699 scopus 로고
    • A heuristic for selecting lot size quantities for the case of a deterministic time varying demand rate and discrete opportunities for replenishment
    • Silver, E. A., and Meal, H. C., 1973, A heuristic for selecting lot size quantities for the case of a deterministic time varying demand rate and discrete opportunities for replenishment. Production and Inventory Management, 14, 64-74.
    • (1973) Production and Inventory Management , vol.14 , pp. 64-74
    • Silver, E.A.1    Meal, H.C.2
  • 19
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductory industry, Part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., 1992, A review of production planning and scheduling models in the semiconductory industry, Part I: System characteristics, performance evaluation and production planning. IIE Transactions, 24 (4), 47-60.
    • (1992) IIE Transactions , vol.24 , Issue.4 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 20
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semi-conductor industry, Part II: Shop-floor control
    • Uzsoy, R., Lee, C. Y., and Martin-Vega, L. A., 1994, A review of production planning and scheduling models in the semi-conductor industry, Part II: Shop-floor control. IIE Transactions, 26 (5), 44-55.
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 21
    • 0027648685 scopus 로고
    • An improved methodology for real-time production decisions at batch-process workstations
    • Weng, W. W., and Leachman, R. C., 1993, An improved methodology for real-time production decisions at batch-process workstations. IEEE Transactions on Semiconductor Manufacturing, 6 (3), 219-225.
    • (1993) IEEE Transactions on Semiconductor Manufacturing , vol.6 , Issue.3 , pp. 219-225
    • Weng, W.W.1    Leachman, R.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.