메뉴 건너뛰기




Volumn 4, Issue 1, 2010, Pages 95-116

Development of a framework for implementation of lean manufacturing systems

Author keywords

Framework; Implementation; JIT; Just in time; Lean manufacturing; LM; Toyota production system; TPS

Indexed keywords


EID: 72249087987     PISSN: 14779064     EISSN: 17418143     Source Type: Journal    
DOI: 10.1504/IJMP.2010.029705     Document Type: Article
Times cited : (79)

References (83)
  • 2
    • 72249091967 scopus 로고    scopus 로고
    • Lean manufacturing implementation to a robotic-press line at AG simpson automotive systems
    • 19-22 June, Istanbul, Turkey Available online at: accessed on 11 June 2008
    • Abduelmula, A., MacIsaac, R. and ElMekkawy, T.Y. (2005) 'Lean manufacturing implementation to a robotic-press line at AG Simpson Automotive Systems', Proceedings of the 35th International Conference on Computers and Industrial Engineering, 19-22 June, Istanbul, Turkey, pp.7-12. Available online at: http://www.umoncton.ca/cie/Conferences/35thconf/ CIE35%20Proceedings/PDF/ 087.pdf (accessed on 11 June 2008).
    • (2005) Proceedings of the 35th International Conference on Computers and Industrial Engineering , pp. 7-12
    • Abduelmula, A.1    MacIsaac, R.2    ElMekkawy, T.Y.3
  • 3
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
    • Abdulmalek, F.A. and Rajgopal, J. (2007) 'Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study', International Journal of Production Economics, Vol. 107, No. 1, pp.223-236.
    • (2007) International Journal of Production Economics , vol.107 , Issue.1 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 4
    • 0032306745 scopus 로고    scopus 로고
    • Adaptation of JIT philosophy and Kanban technique to a small-sized manufacturing firm: A project management approach
    • Abdul-Nour, G., Lambert, S. and Drolet, J. (1998) 'Adaptation of JIT philosophy and Kanban technique to a small-sized manufacturing firm: a project management approach', Computers and Industrial Engineering, Vol. 35, Nos.3-4, pp.419-422.
    • (1998) Computers and Industrial Engineering , vol.35 , Issue.3-4 , pp. 419-422
    • Abdul-Nour, G.1    Lambert, S.2    Drolet, J.3
  • 5
    • 0033333442 scopus 로고    scopus 로고
    • Simulation as a tool for continuous process improvement
    • in Farrington, P.A., Nembhard, H.B., Sturrock, D.T. and Evans, G.W. (Eds.)
    • Adams, M., Componation, P., Czarnecki, H. and Schroer, B.J. (1999) 'Simulation as a tool for continuous process improvement', in Farrington, P.A., Nembhard, H.B., Sturrock, D.T. and Evans, G.W. (Eds.): Proceedings of the 1999 Winter Simulation Conference, pp.766-773.
    • (1999) Proceedings of the 1999 Winter Simulation Conference , pp. 766-773
    • Adams, M.1    Componation, P.2    Czarnecki, H.3    Schroer, B.J.4
  • 7
    • 72249120484 scopus 로고    scopus 로고
    • Airbus White Paper Available online at: accessed on 22 January 2007
    • Airbus (2004) 'Six steps to implementing lean', White paper. Available online at: www.manufacturingfoundation.org.uk/PriorResearch.pdf (accessed on 22 January 2007).
    • (2004) Six Steps to Implementing Lean
  • 9
    • 66149172233 scopus 로고    scopus 로고
    • Simulation model for the design of lean manufacturing systems - a case study
    • Anand, G. and Kodali, R. (2009b) 'Simulation model for the design of lean manufacturing systems - a case study', International Journal of Productivity and Quality Management, Vol. 4, Nos. 5-6, pp.691-714.
    • (2009) International Journal of Productivity and Quality Management , vol.4 , Issue.5-6 , pp. 691-714
    • Anand, G.1    Kodali, R.2
  • 10
    • 14944381127 scopus 로고    scopus 로고
    • Applying lean manufacturing principles to information intensive services
    • Apte, U.M. and Goh, C. (2004) 'Applying lean manufacturing principles to information intensive services', International Journal of Services Technology and Management, Vol. 5, Nos. 5-6, pp.488-506.
    • (2004) International Journal of Services Technology and Management , vol.5 , Issue.5-6 , pp. 488-506
    • Apte, U.M.1    Goh, C.2
  • 11
    • 0034175343 scopus 로고    scopus 로고
    • Lean production: A study of application in a traditional manufacturing environment
    • Bamber, L. and Dale, B.G. (2000) 'Lean production: a study of application in a traditional manufacturing environment', Production Planning & Control, Vol. 11, No. 3, pp.291-298.
    • (2000) Production Planning & Control , vol.11 , Issue.3 , pp. 291-298
    • Bamber, L.1    Dale, B.G.2
  • 13
    • 0004275090 scopus 로고    scopus 로고
    • 1st ed., PICSIE Books, Buckingham
    • Bicheno, J. (2000) The Lean Toolbox, 1st ed., PICSIE Books, Buckingham.
    • (2000) The Lean Toolbox
    • Bicheno, J.1
  • 14
    • 0030270529 scopus 로고    scopus 로고
    • Lean manufacturing optimization of automotive motor compartment system
    • Braiden, B.W. and Morrison, K.R. (1996) 'Lean manufacturing optimization of automotive motor compartment system', Computers and Industrial Engineering, Vol. 31, Nos. 1-2, pp.99-102.
    • (1996) Computers and Industrial Engineering , vol.31 , Issue.1-2 , pp. 99-102
    • Braiden, B.W.1    Morrison, K.R.2
  • 15
    • 66149185213 scopus 로고    scopus 로고
    • From current state to future state: Mapping the steel to component supply chain
    • Brunt, D. (2000) 'From current state to future state: mapping the steel to component supply chain', International Journal of Logistics: Research and Applications, Vol. 3, No. 3, pp.259-271.
    • (2000) International Journal of Logistics: Research and Applications , vol.3 , Issue.3 , pp. 259-271
    • Brunt, D.1
  • 16
    • 84993090888 scopus 로고    scopus 로고
    • An exploratory analysis in applying lean manufacturing to a labor-intensive industry in china
    • Comm, C.L. and Mathaisel, D.F.X. (2005) 'An exploratory analysis in applying lean manufacturing to a labor-intensive industry in china', Asia Pacific Journal of Marketing and Logistics, Vol. 17, No. 4, pp.63-80.
    • (2005) Asia Pacific Journal of Marketing and Logistics , vol.17 , Issue.4 , pp. 63-80
    • Comm, C.L.1    Mathaisel, D.F.X.2
  • 17
    • 66149165251 scopus 로고    scopus 로고
    • The effect of lean manufacturing
    • Available online at: accessed on 22 January 2007
    • Cook, C.R. and Graser, J.C. (2003) 'The effect of lean manufacturing', Research Monograph. Available online at: http://rand.org/pubs/monograph-reports/ MR1325/MR1325.ch2.pdf (accessed on 22 January 2007).
    • (2003) Research Monograph
    • Cook, C.R.1    Graser, J.C.2
  • 18
    • 0142043414 scopus 로고    scopus 로고
    • Implementing lean in aerospace - challenging the assumptions and understating the challenges
    • Crute, V., Ward, Y., Brown, S. and Graves, A. (2003) 'Implementing lean in aerospace - challenging the assumptions and understating the challenges', Technovation, Vol. 23, No. 12, pp.917-928.
    • (2003) Technovation , vol.23 , Issue.12 , pp. 917-928
    • Crute, V.1    Ward, Y.2    Brown, S.3    Graves, A.4
  • 19
    • 72249094451 scopus 로고    scopus 로고
    • Unpublished Masters Thesis, Oregon State University. Available online at: accessed on 11 June 2008
    • Czabke, J. (2007) 'Lean thinking in the secondary wood products industry: challenges and benefits', Unpublished Masters Thesis, Oregon State University. Available online at: https://ir.library.oregonstate.edu/dspace/handle/1957/4259 (accessed on 11 June 2008).
    • (2007) Lean Thinking in the Secondary Wood Products Industry: Challenges and Benefits
    • Czabke, J.1
  • 20
    • 84857182374 scopus 로고    scopus 로고
    • White Paper Available online at: accessed on 22 January 2007
    • Czarnecki, H. and Loyd, N. (2001) 'Simulation of lean assembly line for high volume manufacturing', White Paper. Available online at: http://www.atnlean.com/publications/ Simulation%20of%20Lean%20Assembly%20Line%20for%20High%20Volume%20Manufac turing.pdf (accessed on 22 January 2007).
    • (2001) Simulation of Lean Assembly Line for High Volume Manufacturing
    • Czarnecki, H.1    Loyd, N.2
  • 23
    • 0034688387 scopus 로고    scopus 로고
    • Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
    • Detty, R.B. and Yingling, J.C. (2000) 'Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study', International Journal of Production Research, Vol. 38, No. 2, pp.429-445.
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 429-445
    • Detty, R.B.1    Yingling, J.C.2
  • 25
    • 34247111842 scopus 로고    scopus 로고
    • Materials flow improvement in a lean assembly line: A case study
    • Domingo, R., Alvarez, R., Pena, M.M. and Calvo, R. (2007) 'Materials flow improvement in a lean assembly line: a case study', Assembly Automation, Vol. 27, No. 2, pp.141-147.
    • (2007) Assembly Automation , vol.27 , Issue.2 , pp. 141-147
    • Domingo, R.1    Alvarez, R.2    Pena, M.M.3    Calvo, R.4
  • 26
    • 72249118724 scopus 로고    scopus 로고
    • Unpublished Master's Thesis, Massachusetts Institute of Technology. Available online at: accessed on 10 June 2008
    • Dudley, A.N. (2005) 'The application of lean manufacturing principles in a high mix low volume environment', Unpublished Master's Thesis, Massachusetts Institute of Technology. Available online at: http://dspace.mit.edu/handle/1721. 1/34828 (accessed on 10 June 2008).
    • (2005) The Application of Lean Manufacturing Principles in a High Mix Low Volume Environment
    • Dudley, A.N.1
  • 27
    • 34547766023 scopus 로고    scopus 로고
    • The application of lean manufacturing in a mining environment
    • Paper ID: 609023, 6-18 October 2006, Melbourne Available online at: accessed on 2 February 2008
    • Dunstan, K., Lavin, B. and Sanford, R. (2006) 'The application of lean manufacturing in a mining environment', Paper ID: 609023, Proceedings of the International Mine Management Conference, 6-18 October 2006, Melbourne, pp.145-157. Available online at: www.leanmining.com.au/Dunstan.pdf (accessed on 2 February 2008).
    • (2006) Proceedings of the International Mine Management Conference , pp. 145-157
    • Dunstan, K.1    Lavin, B.2    Sanford, R.3
  • 30
    • 66149188680 scopus 로고    scopus 로고
    • Unpublished Master's Thesis, Massachusetts Institute of Technology. Available online at: accessed on 22 January 2007
    • Flinchbaugh, J.W. (1998) 'Implementing lean manufacturing through factory design', Unpublished Master's Thesis, Massachusetts Institute of Technology. Available online at: http://ocw.mit.edu/NR/rdonlyres/Sloan-School-of-Management/ 15-763JSpring-2005/976FCA10-38F8-4147-90B9-D1EBDABAC888/0/flinchbaugh-thes.pdf (accessed on 22 January 2007).
    • (1998) Implementing Lean Manufacturing Through Factory Design
    • Flinchbaugh, J.W.1
  • 31
    • 70449880899 scopus 로고    scopus 로고
    • Unpublished Master's Thesis, North Carolina State University, Raleigh. Available online at accessed on 10 June 2008
    • Goforth, K.A. (2007) 'Adapting lean manufacturing principles to the textile industry', Unpublished Master's Thesis, North Carolina State University, Raleigh. Available online at: http://www. lib.ncsu.edu/theses/available/etd- 03212007-230809/ (accessed on 10 June 2008).
    • (2007) Adapting Lean Manufacturing Principles to the Textile Industry
    • Goforth, K.A.1
  • 32
    • 51249083484 scopus 로고    scopus 로고
    • An initiative to implement lean manufacturing using value stream mapping in a small company
    • Grewal, C. (2008) 'An initiative to implement lean manufacturing using value stream mapping in a small company', International Journal of Manufacturing Technology and Management, Vol. 15, Nos. 3-4, pp.404-417.
    • (2008) International Journal of Manufacturing Technology and Management , vol.15 , Issue.3-4 , pp. 404-417
    • Grewal, C.1
  • 33
    • 33745946072 scopus 로고    scopus 로고
    • Benchmarking performance measurement and lean manufacturing in the rough mill
    • Gumbo, D., Earl Kline, D. and Bumgardner, M.S. (2006) 'Benchmarking performance measurement and lean manufacturing in the rough mill', Forest Products Journal, Vol. 56, No. 6, pp.25-30.
    • (2006) Forest Products Journal , vol.56 , Issue.6 , pp. 25-30
    • Gumbo, D.1    Earl Kline, D.2    Bumgardner, M.S.3
  • 34
    • 0031165161 scopus 로고    scopus 로고
    • Implementation of just-in-time in a small company: A case study
    • Gunasekaran, A. and Lyu, J. (1997) 'Implementation of just-in-time in a small company: a case study', Production Planning & Control, Vol. 8, No. 4, pp.406-412.
    • (1997) Production Planning & Control , vol.8 , Issue.4 , pp. 406-412
    • Gunasekaran, A.1    Lyu, J.2
  • 36
    • 0029344054 scopus 로고
    • Implementation of just-in-time methodology in a small company
    • Gupta, S.M. and Brennan, L. (1995) 'Implementation of just-in-time methodology in a small company', Production Planning and Control, Vol. 6, No. 4, pp.358-364.
    • (1995) Production Planning and Control , vol.6 , Issue.4 , pp. 358-364
    • Gupta, S.M.1    Brennan, L.2
  • 39
    • 84986180505 scopus 로고    scopus 로고
    • Value stream mapping: A distribution industry application
    • Hines, P., Rich, N. and Esain, A. (1999) 'Value stream mapping: a distribution industry application', Benchmarking: An International Journal, Vol. 6, No. 1, pp.60-77.
    • (1999) Benchmarking: An International Journal , vol.6 , Issue.1 , pp. 60-77
    • Hines, P.1    Rich, N.2    Esain, A.3
  • 41
    • 0002900917 scopus 로고    scopus 로고
    • Applying lean principles for high product variety and low volumes: Some issues and propositions
    • Jina, J., Bhattacharya, A.K. and Walton, A.D. (1997) 'Applying lean principles for high product variety and low volumes: some issues and propositions', Logistics Information Management, Vol. 10, No. 1, pp.5-13.
    • (1997) Logistics Information Management , vol.10 , Issue.1 , pp. 5-13
    • Jina, J.1    Bhattacharya, A.K.2    Walton, A.D.3
  • 45
    • 0031360395 scopus 로고    scopus 로고
    • Successful implementation of TPS in a manufacturing setting: A case study
    • Kasul, R.A. and Motwani, J.G. (1997) 'Successful implementation of TPS in a manufacturing setting: a case study', Industrial Management & Data Systems, Vol. 97, No. 7, pp.274-279.
    • (1997) Industrial Management & Data Systems , vol.97 , Issue.7 , pp. 274-279
    • Kasul, R.A.1    Motwani, J.G.2
  • 47
    • 0002663788 scopus 로고
    • Toward a theory of business process change management
    • Kettinger, W. and Grover, V. (1995) 'Toward a theory of business process change management', Journal of Management Information Systems, Vol. 12, No. 1, pp.9-30.
    • (1995) Journal of Management Information Systems , vol.12 , Issue.1 , pp. 9-30
    • Kettinger, W.1    Grover, V.2
  • 48
    • 33947510199 scopus 로고    scopus 로고
    • Lean healthcare: What can hospitals learn from a world-class automaker?
    • Kim, C.S., Spahlinger, D.A., Kin, J.M. and Billi, J.E. (2006) 'Lean healthcare: what can hospitals learn from a world-class automaker?', Journal of Hospital Medicine, Vol. 1, No. 3, pp.191-199.
    • (2006) Journal of Hospital Medicine , vol.1 , Issue.3 , pp. 191-199
    • Kim, C.S.1    Spahlinger, D.A.2    Kin, J.M.3    Billi, J.E.4
  • 50
    • 33745604543 scopus 로고    scopus 로고
    • Implementing the lean sigma framework in an Indian SME: A case study
    • Kumar, M., Antony, J., Singh, R.K., Tiwari, M.K. and Perry, D. (2006) 'Implementing the lean sigma framework in an Indian SME: a case study', Production Planning & Control, Vol. 17, No. 4, pp.407-423.
    • (2006) Production Planning & Control , vol.17 , Issue.4 , pp. 407-423
    • Kumar, M.1    Antony, J.2    Singh, R.K.3    Tiwari, M.K.4    Perry, D.5
  • 51
    • 34547371574 scopus 로고    scopus 로고
    • The mutation of the Toyota Production System: Adapting the TPS at Hyundai Motor Company
    • Lee, B.H. and Jo, H.J. (2007) 'The mutation of the Toyota Production System: adapting the TPS at Hyundai Motor Company', International Journal of Production Research, Vol. 45, No. 16, pp.3665-3679.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3665-3679
    • Lee, B.H.1    Jo, H.J.2
  • 52
    • 0345759911 scopus 로고    scopus 로고
    • Lean manufacturing in temperature dependent processes with interruptions
    • Lee, W.L. and Allwood, J.M. (2003) 'Lean manufacturing in temperature dependent processes with interruptions', International Journal of Operations Management, Vol. 23, No. 11, pp.1377-1400.
    • (2003) International Journal of Operations Management , vol.23 , Issue.11 , pp. 1377-1400
    • Lee, W.L.1    Allwood, J.M.2
  • 53
    • 0008829825 scopus 로고    scopus 로고
    • Is just-in-time applicable in paper industry logistics?
    • Lehtonen, J.M. and Holmström, J. (1998) 'Is just-in-time applicable in paper industry logistics?', Supply Chain Management, Vol. 3, No. 1, pp.21-32.
    • (1998) Supply Chain Management , vol.3 , Issue.1 , pp. 21-32
    • Lehtonen, J.M.1    Holmström, J.2
  • 55
    • 34249027911 scopus 로고    scopus 로고
    • Analysing the effects of lean manufacturing using a value stream mapping-based simulation generator
    • Lian, Y.H. and Van Landeghem, H. (2007) 'Analysing the effects of lean manufacturing using a value stream mapping-based simulation generator', International Journal of Production Research, Vol. 45, No. 13, pp.3037-3058.
    • (2007) International Journal of Production Research , vol.45 , Issue.13 , pp. 3037-3058
    • Lian, Y.H.1    Van Landeghem, H.2
  • 56
    • 72249099947 scopus 로고    scopus 로고
    • A guide to lean shipbuilding
    • Available online at: accessed on 22 January 2007
    • Liker, J.K. and Lamb, T. (2000) 'A guide to lean shipbuilding', Maritech ASE Project #10. Available online at: www.nsrp.org/projects/deliverables/ase- 910001.pdf (accessed on 22 January 2007).
    • (2000) Maritech ASE Project #10
    • Liker, J.K.1    Lamb, T.2
  • 57
    • 0030269737 scopus 로고    scopus 로고
    • Transformation to lean manufacturing by an automotive component supplier
    • Mabry, B.G. and Morrison, K.R. (1996) 'Transformation to lean manufacturing by an automotive component supplier', Computers and Industrial Engineering, Vol. 31, Nos. 1-2, pp.95-98.
    • (1996) Computers and Industrial Engineering , vol.31 , Issue.1-2 , pp. 95-98
    • Mabry, B.G.1    Morrison, K.R.2
  • 59
    • 33751091984 scopus 로고    scopus 로고
    • Development of a framework for world-class maintenance systems
    • Mishra, R.P., Anand, G. and Kodali, R. (2006) 'Development of a framework for world-class maintenance systems', Journal of Advanced Manufacturing Systems, Vol. 5, No. 2, pp.141-165.
    • (2006) Journal of Advanced Manufacturing Systems , vol.5 , Issue.2 , pp. 141-165
    • Mishra, R.P.1    Anand, G.2    Kodali, R.3
  • 60
    • 66149165250 scopus 로고    scopus 로고
    • Implementation of lean manufacturing principles in auto industry
    • Available online at: accessed on 10 April 2008
    • Mohanty, R.P., Yadav, O.P. and Jain, R. (2007) 'Implementation of lean manufacturing principles in auto industry', Vilakshan - XIMB Journal of Management, pp.1-32. Available online at: http://www.ximb.ac.in/ximb-journal/ Publications/Article-01.pdf (accessed on 10 April 2008).
    • (2007) Vilakshan - XIMB Journal of Management , pp. 1-32
    • Mohanty, R.P.1    Yadav, O.P.2    Jain, R.3
  • 63
    • 0042363456 scopus 로고    scopus 로고
    • A business process change framework for examining lean manufacturing: A case study
    • Motwani, J. (2003) 'A business process change framework for examining lean manufacturing: a case study', Industrial Management & Data Systems, Vol. 103, No. 5, pp.339-346.
    • (2003) Industrial Management & Data Systems , vol.103 , Issue.5 , pp. 339-346
    • Motwani, J.1
  • 64
    • 32144454745 scopus 로고    scopus 로고
    • Kanban implementation at a tyre manufacturing plant: A case study
    • Mukhopadhyay, S.K. and Shanker, S. (2005) 'Kanban implementation at a tyre manufacturing plant: a case study', Production Planning & Control, Vol. 16, No. 5, pp.488-499.
    • (2005) Production Planning & Control , vol.16 , Issue.5 , pp. 488-499
    • Mukhopadhyay, S.K.1    Shanker, S.2
  • 65
    • 72249106294 scopus 로고    scopus 로고
    • Lean production and manufacturing performance improvement in Japan, the UK And US 1994-2001
    • ESRC Centre for Business Research, University of Cambridge. Available online at: accessed on 22 January 2007
    • Oliver, N., Delbridge, R. and Barton, H. (2002) 'Lean production and manufacturing performance improvement in Japan, the UK And US 1994-2001', Working Paper No. 232, ESRC Centre for Business Research, University of Cambridge. Available online at: http://www.cbr. cam.ac.uk/pdf/WP232.pdf (accessed on 22 January 2007).
    • (2002) Working Paper No. 232
    • Oliver, N.1    Delbridge, R.2    Barton, H.3
  • 66
    • 72249121744 scopus 로고    scopus 로고
    • Responding to customer requirements with value stream mapping: An automotive industry application
    • Available online at: accessed on 12 January 2008
    • Özkan, K., Birgün, S., Kiliçogullari, P. and Akman, G. (2005) 'Responding to customer requirements with value stream mapping: an automotive industry application', Proceedings of the 35th International Conference on Computers and Industrial Engineering, pp.1517-1522. Available online at: http://www.umoncton.ca/cie/Conferences/35thconf/CIE35%20Proceedings/ PDF/309.pdf (accessed on 12 January 2008).
    • (2005) Proceedings of the 35th International Conference on Computers and Industrial Engineering , pp. 1517-1522
    • Özkan, K.1    Birgün, S.2    Kiliçogullari, P.3    Akman, G.4
  • 68
    • 0004277453 scopus 로고    scopus 로고
    • 1st ed., Lean Enterprise Institute Inc., Brookline, MA
    • Rother, M. and Shook, J. (1999) Learning to See, 1st ed., Lean Enterprise Institute Inc., Brookline, MA.
    • (1999) Learning to See
    • Rother, M.1    Shook, J.2
  • 73
    • 27844589388 scopus 로고    scopus 로고
    • Application of value stream mapping for lean operations and cycle time reduction: An Indian case study
    • Seth, D. and Gupta, V. (2005) 'Application of value stream mapping for lean operations and cycle time reduction: an Indian case study', Production Planning & Control, Vol. 16, No. 1, pp.44-59.
    • (2005) Production Planning & Control , vol.16 , Issue.1 , pp. 44-59
    • Seth, D.1    Gupta, V.2
  • 75
    • 0442294066 scopus 로고    scopus 로고
    • Quality issues in lean production implementation: A case study of a French automotive supplier
    • Soderquist, K. and Motwani, J. (1999) 'Quality issues in lean production implementation: a case study of a French automotive supplier', Total Quality Management & Business Excellence, Vol. 10, No. 8, pp.1107-1122.
    • (1999) Total Quality Management & Business Excellence , vol.10 , Issue.8 , pp. 1107-1122
    • Soderquist, K.1    Motwani, J.2
  • 77
    • 0030539014 scopus 로고    scopus 로고
    • Developing a lean production organization: An Australian case study
    • Sohal, A.S. (1996) 'Developing a lean production organization: an Australian case study', International Journal of Operations & Production Management, Vol. 16, No. 2, pp.91-102.
    • (1996) International Journal of Operations & Production Management , vol.16 , Issue.2 , pp. 91-102
    • Sohal, A.S.1
  • 78
    • 85073127052 scopus 로고    scopus 로고
    • Can lean manufacturing be applied to university laboratories?
    • Paper No. AC 2007-273. Available online at: accessed on 11 June 2008
    • Sreedharan, S. and Liou, F. (2007) 'Can lean manufacturing be applied to university laboratories?', Proceedings of the 2007 American Society for Engineering Education Annual Conference & Exposition, Paper No. AC 2007-273. Available online at: http://www.icee.usm.edu/ICEE/conferences/asee2007/papers/ 273-CAN-LEAN-MANUFACTURING-BE-APPLIED-TO-UNI.pdf (accessed on 11 June 2008).
    • (2007) Proceedings of the 2007 American Society for Engineering Education Annual Conference & Exposition
    • Sreedharan, S.1    Liou, F.2
  • 79
    • 0033097214 scopus 로고    scopus 로고
    • Improving flow to achieve lean manufacturing in shipbuilding
    • Storch, R.L. and Lim, S. (1999) 'Improving flow to achieve lean manufacturing in shipbuilding', Production Planning & Control, Vol. 10, No. 2, pp.127-137.
    • (1999) Production Planning & Control , vol.10 , Issue.2 , pp. 127-137
    • Storch, R.L.1    Lim, S.2
  • 81
    • 4444237159 scopus 로고    scopus 로고
    • Innovation and hybridization: Managing the introduction of lean production into Volvo do Brazil
    • Wallace, T. (2004) 'Innovation and hybridization: managing the introduction of lean production into Volvo do Brazil', International Journal of Operations Management, Vol. 24, No. 8, pp.801-819.
    • (2004) International Journal of Operations Management , vol.24 , Issue.8 , pp. 801-819
    • Wallace, T.1
  • 83
    • 1542530466 scopus 로고    scopus 로고
    • Total quality management implementation frameworks: Comparison and review
    • Yusuf, S.M. and Aspinwall, E. (2000) 'Total quality management implementation frameworks: comparison and review', Total Quality Management, Vol. 11, No. 3, pp.281-294.
    • (2000) Total Quality Management , vol.11 , Issue.3 , pp. 281-294
    • Yusuf, S.M.1    Aspinwall, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.