메뉴 건너뛰기




Volumn 47, Issue 14, 2009, Pages 3997-4011

Effective vehicle dispatching method minimising the blocking and delivery times in automatic material handling systems of 300 mm semiconductor fabrication

Author keywords

Automated material handling systems; Blocking time; Dispatching rule; Overhead hoist transport; Reassignment

Indexed keywords

300 MM SEMICONDUCTOR MANUFACTURING; AUTOMATED MATERIAL HANDLING SYSTEMS; AUTOMATIC MATERIAL HANDLING SYSTEMS; BLOCKING TIME; DELIVERY TIME; DISCRETE-EVENT SIMULATION MODEL; DISPATCHING RULES; OVERHEAD HOIST TRANSPORTS; SEMI-CONDUCTOR FABRICATION; SIGNIFICANT IMPACTS; VEHICLE DISPATCHING;

EID: 70449635407     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540801914934     Document Type: Article
Times cited : (23)

References (20)
  • 1
    • 70449634058 scopus 로고    scopus 로고
    • Automated Material Handling System (AMHS), International SEMATECH
    • Automated Material Handling System (AMHS), 1999. Framework User Requirements Document: Version 1.0, International SEMATECH.
    • (1999) Framework User Requirements Document: Version 1.0
  • 3
    • 0024621009 scopus 로고
    • Decentralized control of a fixed route automatic guided vehicle system
    • Bartholdi, J.J. and Platzman, L.K., 1989. Decentralized control of a fixed route automatic guided vehicle system. IIE Transactions, 21, 76-81.
    • (1989) IIE Transactions , vol.21 , pp. 76-81
    • Bartholdi, J.J.1    Platzman, L.K.2
  • 4
    • 0041587603 scopus 로고    scopus 로고
    • Intelligent dispatching rules for trip-based material handling systems
    • Bozer, Y.A. and Yen, C., 1996. Intelligent dispatching rules for trip-based material handling systems. Journal of Manufacturing Systems, 15, 226-239.
    • (1996) Journal of Manufacturing Systems , vol.15 , pp. 226-239
    • Bozer, Y.A.1    Yen, C.2
  • 5
    • 0002894516 scopus 로고
    • The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system
    • Egbelu, P.J., 1987. The use of non-simulation approaches in estimating vehicle requirements in an automated guided vehicle based transport system. Material Flow, 4, 17-32.
    • (1987) Material Flow , vol.4 , pp. 17-32
    • Egbelu, P.J.1
  • 7
    • 4644335493 scopus 로고    scopus 로고
    • Taking a queue from simulation: The many rules of scheduling semiconductor material handling
    • Hasenbein, J., Sigireddy, S., and Wright, R., 2004. Taking a queue from simulation: The many rules of scheduling semiconductor material handling. IIE Transactions, 36, 39-43.
    • (2004) IIE Transactions , vol.36 , pp. 39-43
    • Hasenbein, J.1    Sigireddy, S.2    Wright, R.3
  • 8
    • 0035840750 scopus 로고    scopus 로고
    • A multi-attribute dispatching rule for automated guided vehicle system
    • Jeong, B.H. and Randhawa, S.U., 2001. A multi-attribute dispatching rule for automated guided vehicle system. International Journal of Production Research, 39, 2817-2832.
    • (2001) International Journal of Production Research , vol.39 , pp. 2817-2832
    • Jeong, B.H.1    Randhawa, S.U.2
  • 10
    • 0002719797 scopus 로고
    • The Hungarian method for the assignment problem
    • Kuhn, H.W., 1955. The Hungarian method for the assignment problem. Naval Research Logistics Quarterly, 2, 83-97.
    • (1955) Naval Research Logistics Quarterly , vol.2 , pp. 83-97
    • Kuhn, H.W.1
  • 11
    • 29344456481 scopus 로고    scopus 로고
    • Dispatching of overhead hoist vehicles in a fab intrabay using a multimission-oriented controller
    • Kuo, C.H. and Huang, C.S., 2006. Dispatching of overhead hoist vehicles in a fab intrabay using a multimission-oriented controller. International Journal of Advanced Manufacturing Technology, 27, 824-832.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.27 , pp. 824-832
    • Kuo, C.H.1    Huang, C.S.2
  • 12
    • 27744468721 scopus 로고    scopus 로고
    • On-line dispatching rules for vehicle-based internal transport systems
    • Le-Anh, T. and De Koster, M.B., 2005. On-line dispatching rules for vehicle-based internal transport systems. International Journal of Production Research, 43, 1711-1728.
    • (2005) International Journal of Production Research , vol.43 , pp. 1711-1728
    • Le-Anh, T.1    De Koster, M.B.2
  • 15
    • 0035872172 scopus 로고    scopus 로고
    • Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab
    • Lin, J.T., Wang, F.K., and Yen, P.Y., 2001. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab. International Journal of Production Research, 39, 1221-1238.
    • (2001) International Journal of Production Research , vol.39 , pp. 1221-1238
    • Lin, J.T.1    Wang, F.K.2    Yen, P.Y.3
  • 16
    • 0003094781 scopus 로고
    • A hybrid modeling approach to the design of an AGV-based material handling system
    • Mahadevan, B. and Narendran, T.T., 1994. A hybrid modeling approach to the design of an AGV-based material handling system. International Journal of Production Research, 32, 2015-2030.
    • (1994) International Journal of Production Research , vol.32 , pp. 2015-2030
    • Mahadevan, B.1    Narendran, T.T.2
  • 17
    • 0242269876 scopus 로고    scopus 로고
    • Development of a realtime multi-objective scheduler for a semiconductor fabrication system
    • Min, H.S. and Yih, Y.W., 2003. Development of a realtime multi-objective scheduler for a semiconductor fabrication system. International Journal of Production Research, 41, 2345-2364.
    • (2003) International Journal of Production Research , vol.41 , pp. 2345-2364
    • Min, H.S.1    Yih, Y.W.2
  • 18
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • Sabuncuoglu, I., 1996. A study of scheduling rules of flexible manufacturing systems: A simulation approach. International Journal of Production Research, 36, 527-546.
    • (1996) International Journal of Production Research , vol.36 , pp. 527-546
    • Sabuncuoglu, I.1
  • 19
    • 0028195172 scopus 로고
    • Trip-based material handling systems: Throughput capacity analysis
    • Srinivasan, M.M., Bozer, Y.A., and Cho, M., 1994. Trip-based material handling systems: Throughput capacity analysis. IIE Transactions, 26, 70-89.
    • (1994) IIE Transactions , vol.26 , pp. 70-89
    • Srinivasan, M.M.1    Bozer, Y.A.2    Cho, M.3
  • 20
    • 0035254431 scopus 로고    scopus 로고
    • Vehicle dispatching system based on Taguchi-tuned fuzzy rules
    • Tan, K.K. and Tang, K.Z., 2001. Vehicle dispatching system based on Taguchi-tuned fuzzy rules. European Journal of Operational Research, 128, 545-557.
    • (2001) European Journal of Operational Research , vol.128 , pp. 545-557
    • Tan, K.K.1    Tang, K.Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.