-
5
-
-
0037322968
-
On discrete lot streaming in no-wait flow shops
-
Chen J., and Steiner G. On discrete lot streaming in no-wait flow shops. IIE Transactions 35 (2003) 91-101
-
(2003)
IIE Transactions
, vol.35
, pp. 91-101
-
-
Chen, J.1
Steiner, G.2
-
8
-
-
0034688385
-
An interactive tool for designing manufacturing cells for an assembly job-shop
-
Gravel M., Price W., and Gagne C. An interactive tool for designing manufacturing cells for an assembly job-shop. International Journal of Production Research 38 2 (2000) 309-322
-
(2000)
International Journal of Production Research
, vol.38
, Issue.2
, pp. 309-322
-
-
Gravel, M.1
Price, W.2
Gagne, C.3
-
10
-
-
33747786647
-
Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: a case study based on the apparel industry
-
Guo Z.X., Wong W.K., Leung S.Y.S., Fan J.T., and Chan S.F. Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: a case study based on the apparel industry. Computers & Industrial Engineering 50 3 (2006) 202-219
-
(2006)
Computers & Industrial Engineering
, vol.50
, Issue.3
, pp. 202-219
-
-
Guo, Z.X.1
Wong, W.K.2
Leung, S.Y.S.3
Fan, J.T.4
Chan, S.F.5
-
12
-
-
0033207931
-
A batch splitting method for a job shop scheduling problem in an MRP environment
-
Jeong H.I., Park J., and Leachman R.C. A batch splitting method for a job shop scheduling problem in an MRP environment. International Journal of Production Research 37 15 (1999) 3583-3598
-
(1999)
International Journal of Production Research
, vol.37
, Issue.15
, pp. 3583-3598
-
-
Jeong, H.I.1
Park, J.2
Leachman, R.C.3
-
13
-
-
0035598113
-
Optimal solutions for the single batch, flow shop, lot-streaming problem with equal sublots
-
Kalir A.A., and Sarin S.C. Optimal solutions for the single batch, flow shop, lot-streaming problem with equal sublots. Decision Sciences 32 2 (2001) 387-397
-
(2001)
Decision Sciences
, vol.32
, Issue.2
, pp. 387-397
-
-
Kalir, A.A.1
Sarin, S.C.2
-
14
-
-
0013356811
-
A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots
-
Kalir A.A., and Sarin S.C. A near-optimal heuristic for the sequencing problem in multiple-batch flow-shops with small equal sublots. Omega 29 (2001) 577-584
-
(2001)
Omega
, vol.29
, pp. 577-584
-
-
Kalir, A.A.1
Sarin, S.C.2
-
15
-
-
8644252597
-
Parallel machine scheduling considering a job-splitting property
-
Kim Y.D., Shim S.O., Kim S.B., Choi Y.C., and Yoon H.M. Parallel machine scheduling considering a job-splitting property. International Journal of Production Research 42 21 (2004) 4531-4546
-
(2004)
International Journal of Production Research
, vol.42
, Issue.21
, pp. 4531-4546
-
-
Kim, Y.D.1
Shim, S.O.2
Kim, S.B.3
Choi, Y.C.4
Yoon, H.M.5
-
17
-
-
36849069561
-
Single-job lot streaming in m-1 two-stage hybrid flowshops
-
Liu J. Single-job lot streaming in m-1 two-stage hybrid flowshops. European Journal of Operational Research 187 3 (2008) 1171-1183
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1171-1183
-
-
Liu, J.1
-
19
-
-
44849088760
-
A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming
-
Martin C.H. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. Omega 37 1 (2006) 126-137
-
(2006)
Omega
, vol.37
, Issue.1
, pp. 126-137
-
-
Martin, C.H.1
-
20
-
-
0032142734
-
Minimizing production flow time in a process and assembly job shop
-
Mckoy D.H.C., and Egbelu P.J. Minimizing production flow time in a process and assembly job shop. International Journal of Production Research 36 8 (1998) 2315-2332
-
(1998)
International Journal of Production Research
, vol.36
, Issue.8
, pp. 2315-2332
-
-
Mckoy, D.H.C.1
Egbelu, P.J.2
-
21
-
-
0032785177
-
Production scheduling in a process and assembly job shop
-
Mckoy D.H.C., and Egbelu P.J. Production scheduling in a process and assembly job shop. Production Planning & Control 10 1 (1999) 76-86
-
(1999)
Production Planning & Control
, vol.10
, Issue.1
, pp. 76-86
-
-
Mckoy, D.H.C.1
Egbelu, P.J.2
-
22
-
-
0037210011
-
Scheduling rules for dynamic shops that manufacture multi-level jobs
-
Mohanasundaram K.M., Natarajan K., Viswanathkumar G., Radhakrishnan P., and Rajendran C. Scheduling rules for dynamic shops that manufacture multi-level jobs. Computers & Industrial Engineering 44 (2002) 119-131
-
(2002)
Computers & Industrial Engineering
, vol.44
, pp. 119-131
-
-
Mohanasundaram, K.M.1
Natarajan, K.2
Viswanathkumar, G.3
Radhakrishnan, P.4
Rajendran, C.5
-
24
-
-
0020205577
-
A decomposition algorithm for the single machine total tardiness problem
-
Potts C.N., and Van Wassenhove L.N. A decomposition algorithm for the single machine total tardiness problem. Operations Research Letters 1 (1982) 177-181
-
(1982)
Operations Research Letters
, vol.1
, pp. 177-181
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
25
-
-
0000659781
-
A system for managing job-shop production
-
Reiter S. A system for managing job-shop production. Journal of Business 39 3 (1966) 371-393
-
(1966)
Journal of Business
, vol.39
, Issue.3
, pp. 371-393
-
-
Reiter, S.1
-
27
-
-
0030500179
-
Lot splitting in stochastic flow shop and job shop environment
-
Smunt T.L., Buss A.H., and Kropp D.H. Lot splitting in stochastic flow shop and job shop environment. Decision Sciences 27 2 (1996) 215-238
-
(1996)
Decision Sciences
, vol.27
, Issue.2
, pp. 215-238
-
-
Smunt, T.L.1
Buss, A.H.2
Kropp, D.H.3
-
28
-
-
27644553525
-
A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
-
Tahar D.N., Yalaoui F., Chu C., and Amodeo L. A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times. International Journal of Production Economics 99 (2006) 63-73
-
(2006)
International Journal of Production Economics
, vol.99
, pp. 63-73
-
-
Tahar, D.N.1
Yalaoui, F.2
Chu, C.3
Amodeo, L.4
-
29
-
-
0344152920
-
Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
-
Thiagarajan, S., and Rajendran, C. (2003). Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs. International Journal of Production Research, 41(18), 4453-4486.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.18
, pp. 4453-4486
-
-
Thiagarajan, S.1
Rajendran, C.2
-
30
-
-
0000611941
-
Basic techniques for lot streaming
-
Trietsch D., and Baker K.R. Basic techniques for lot streaming. Operations Research 41 6 (1993) 1065-1076
-
(1993)
Operations Research
, vol.41
, Issue.6
, pp. 1065-1076
-
-
Trietsch, D.1
Baker, K.R.2
-
32
-
-
0036722525
-
An application of genetic algorithms to lot-streaming flow shop scheduling
-
Yoon S.H., and Ventura J.A. An application of genetic algorithms to lot-streaming flow shop scheduling. IIE Transactions 34 (2002) 779-787
-
(2002)
IIE Transactions
, vol.34
, pp. 779-787
-
-
Yoon, S.H.1
Ventura, J.A.2
-
33
-
-
0036722157
-
Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
-
Yoon S.H., and Ventura J.A. Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling. Computers & Operations Research 29 (2002) 1301-1315
-
(2002)
Computers & Operations Research
, vol.29
, pp. 1301-1315
-
-
Yoon, S.H.1
Ventura, J.A.2
|