메뉴 건너뛰기




Volumn 29, Issue 10, 2002, Pages 1301-1315

Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling

Author keywords

Flow shop; Lot streaming; Mean weighted absolute deviation; Pairwise interchange method; Scheduling

Indexed keywords

ALGORITHMS; COMPUTATION THEORY; HEURISTIC METHODS; JOB ANALYSIS; LINEAR PROGRAMMING; OPTIMAL CONTROL SYSTEMS; SCHEDULING;

EID: 0036722157     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0548(01)00032-6     Document Type: Article
Times cited : (48)

References (33)
  • 15
    • 0001738801 scopus 로고
    • Note on manufacturing cycle time determination for a multi-stage economic production quantity model
    • (1976) Management Science , vol.23 , pp. 332-333
    • Goyal, S.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.