|
Volumn 29, Issue 10, 2002, Pages 1301-1315
|
Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
|
Author keywords
Flow shop; Lot streaming; Mean weighted absolute deviation; Pairwise interchange method; Scheduling
|
Indexed keywords
ALGORITHMS;
COMPUTATION THEORY;
HEURISTIC METHODS;
JOB ANALYSIS;
LINEAR PROGRAMMING;
OPTIMAL CONTROL SYSTEMS;
SCHEDULING;
LOT-STREAMING SCHEDULING;
OPERATIONS RESEARCH;
PRODUCTION SYSTEM;
|
EID: 0036722157
PISSN: 03050548
EISSN: None
Source Type: Journal
DOI: 10.1016/S0305-0548(01)00032-6 Document Type: Article |
Times cited : (48)
|
References (33)
|