메뉴 건너뛰기




Volumn 42, Issue 21, 2004, Pages 4531-4546

Parallel machine scheduling considering a job-splitting property

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; ANNEALING; COMPUTER SIMULATION; CONSTRAINT THEORY; HEURISTIC METHODS; JOB ANALYSIS; PARALLEL PROCESSING SYSTEMS; PROBLEM SOLVING;

EID: 8644252597     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540410001720745     Document Type: Review
Times cited : (44)

References (17)
  • 1
    • 0031211263 scopus 로고    scopus 로고
    • Scheduling parallel machines to minimize total weighted and unweighted tardiness
    • ALIDAEE, B. and ROSA, D., 1997, Scheduling parallel machines to minimize total weighted and unweighted tardiness. Computers and Operations Research, 24, 775-788.
    • (1997) Computers and Operations Research , vol.24 , pp. 775-788
    • Alidaee, B.1    Rosa, D.2
  • 2
    • 0002349523 scopus 로고
    • Weighted-tardiness scheduling on parallel machines with proportional weights
    • ARKIN, E. M. and ROUNDY, R. O., 1991, Weighted-tardiness scheduling on parallel machines with proportional weights. Operations Research, 39, 64-81.
    • (1991) Operations Research , vol.39 , pp. 64-81
    • Arkin, E.M.1    Roundy, R.O.2
  • 4
    • 0028445470 scopus 로고
    • Parallel-machine scheduling problems with earliness and tardiness penalties
    • CHENG, T. and CHEN, Z., 1994, Parallel-machine scheduling problems with earliness and tardiness penalties. Journal of the Operational Research Society, 45, 685-695.
    • (1994) Journal of the Operational Research Society , vol.45 , pp. 685-695
    • Cheng, T.1    Chen, Z.2
  • 5
    • 0018685640 scopus 로고
    • Evaluation of a heuristic for scheduling independent jobs on parallel identical processors
    • DOORAMACI, A. and SURKIS, J., 1979, Evaluation of a heuristic for scheduling independent jobs on parallel identical processors. Management Science, 25, 1208-1216.
    • (1979) Management Science , vol.25 , pp. 1208-1216
    • Dooramaci, A.1    Surkis, J.2
  • 6
    • 0016035331 scopus 로고
    • Scheduling jobs on a number of identical machines
    • ELMAGHRABY, S. E. and PARK, S. H., 1974, Scheduling jobs on a number of identical machines. AIIE Transactions, 6, 1-13.
    • (1974) AIIE Transactions , vol.6 , pp. 1-13
    • Elmaghraby, S.E.1    Park, S.H.2
  • 7
    • 84989675202 scopus 로고
    • Heuristics for minimizing mean tardiness for m parallel machines
    • HO, J. C. and CHANG, Y. L., 1991, Heuristics for minimizing mean tardiness for m parallel machines. Naval Research Logistics, 38, 367-381.
    • (1991) Naval Research Logistics , vol.38 , pp. 367-381
    • Ho, J.C.1    Chang, Y.L.2
  • 8
    • 0023595882 scopus 로고
    • On the superiority of a backward approach in list scheduling algorithms for multi-machine makespan problems
    • KIM, Y. D., 1987, On the superiority of a backward approach in list scheduling algorithms for multi-machine makespan problems. International Journal of Production Research, 25, 1751-1759.
    • (1987) International Journal of Production Research , vol.25 , pp. 1751-1759
    • Kim, Y.D.1
  • 9
    • 0029277309 scopus 로고
    • A backward approach in list scheduling algorithms for multi-machine tardiness problems
    • KIM, Y. D., 1995, A backward approach in list scheduling algorithms for multi-machine tardiness problems. Computers and Operations Research, 22, 307-319.
    • (1995) Computers and Operations Research , vol.22 , pp. 307-319
    • Kim, Y.D.1
  • 11
    • 0031075568 scopus 로고    scopus 로고
    • Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
    • KOULAMAS, C., 1997, Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem. Naval Research Logistics, 44, 109-125.
    • (1997) Naval Research Logistics , vol.44 , pp. 109-125
    • Koulamas, C.1
  • 12
    • 0000482108 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with sequence-dependent set-up times
    • LEE, Y. H. and PINEDO, M., 1997, Scheduling jobs on parallel machines with sequence-dependent set-up times. European Journal of Operational Research, 100, 464-474.
    • (1997) European Journal of Operational Research , vol.100 , pp. 464-474
    • Lee, Y.H.1    Pinedo, M.2
  • 14
    • 0001207278 scopus 로고
    • Scheduling with deadlines and loss functions on k parallel machines
    • ROOT, J. G., 1965, Scheduling with deadlines and loss functions on k parallel machines. Management Science, 11, 460-475.
    • (1965) Management Science , vol.11 , pp. 460-475
    • Root, J.G.1
  • 15
    • 0030182052 scopus 로고    scopus 로고
    • Scheduling jobs on several machines with the job splitting property
    • SERAFINI, P., 1996, Scheduling jobs on several machines with the job splitting property. Operations Research, 44, 617-628.
    • (1996) Operations Research , vol.44 , pp. 617-628
    • Serafini, P.1
  • 16
    • 0015128399 scopus 로고
    • An improved algorithm for scheduling independent tasks
    • WILKERSON, L. J. and IRWIN, J. D., 1971, An improved algorithm for scheduling independent tasks. AIIE Transactions, 3, 239-245.
    • (1971) AIIE Transactions , vol.3 , pp. 239-245
    • Wilkerson, L.J.1    Irwin, J.D.2
  • 17
    • 0347934513 scopus 로고    scopus 로고
    • Parallel machine scheduling with splitting jobs
    • XING, W. and ZHANG, J., 2000, Parallel machine scheduling with splitting jobs. Discrete Applied Mathematics, 103, 259-269.
    • (2000) Discrete Applied Mathematics , vol.103 , pp. 259-269
    • Xing, W.1    Zhang, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.