메뉴 건너뛰기




Volumn E90-A, Issue 11, 2007, Pages 2593-2603

Coloured Petri net based modelling and analysis of multiple product FMS with resource breakdowns and automated inspection

Author keywords

Automated inspection; Coloured Petri net; Design of experiment; Flexible manufacturing system; Resource breakdown; Routing machine flexibility

Indexed keywords

AUTOMATION; DESIGN OF EXPERIMENTS; INSPECTION; MANUFACTURE; PETRI NETS;

EID: 68249161023     PISSN: 09168508     EISSN: 17451337     Source Type: Journal    
DOI: 10.1093/ietfec/e90-a.11.2593     Document Type: Article
Times cited : (3)

References (28)
  • 2
    • 0001944856 scopus 로고
    • A framework for understanding flexibility of manufacturing systems
    • D. Gupta and J. A. Buzacott, "A framework for understanding flexibility of manufacturing systems," Journal of Manufacturing Systems, vol. 8, no. 2, pp. 89-95, 1989.
    • (1989) Journal of Manufacturing Systems , vol.8 , Issue.2 , pp. 89-95
    • Gupta, D.1    Buzacott, J.A.2
  • 4
    • 0032681956 scopus 로고    scopus 로고
    • Theory and methodology - Manufacturing flexibility: Measures and relationships, European
    • R. P. Parker and A. Wirth, "Theory and methodology - Manufacturing flexibility: Measures and relationships," European J. Operation Research, vol. 118, pp. 429-449, 1999.
    • (1999) J. Operation Research , vol.118 , pp. 429-449
    • Parker, R.P.1    Wirth, A.2
  • 7
    • 0242660612 scopus 로고    scopus 로고
    • Multiple-objective real-time-scheduler for semiconductor wafer fab using coloured timed object-oriented Petri net (CTOPN)
    • Oct
    • H. Liu, Z. Jiang, F. Y. Lee, and Y. K. R. Fung, "Multiple-objective real-time-scheduler for semiconductor wafer fab using coloured timed object-oriented Petri net (CTOPN)," IEEE Int. Conf. Sys. Man and Cyber., vol. 1, pp. 510-515, Oct. 2003.
    • (2003) IEEE Int. Conf. Sys. Man and Cyber , vol.1 , pp. 510-515
    • Liu, H.1    Jiang, Z.2    Lee, F.Y.3    Fung, Y.K.R.4
  • 8
    • 2042541402 scopus 로고    scopus 로고
    • A simulation optimization based control policy for failure prone one machine, two-product manufacturing systems
    • J. P. Kenne and A. Gharbi, "A simulation optimization based control policy for failure prone one machine, two-product manufacturing systems," Comp. and Industrial Engineering, vol. 46, pp. 285-292, 2004.
    • (2004) Comp. and Industrial Engineering , vol.46 , pp. 285-292
    • Kenne, J.P.1    Gharbi, A.2
  • 10
    • 0034204926 scopus 로고    scopus 로고
    • Failure modelling and process monitoring for flexible manufacturing systems using coloured timed Petri nets
    • June
    • H. C. Kuo and P. H. Huang, "Failure modelling and process monitoring for flexible manufacturing systems using coloured timed Petri nets," IEEE Trans. Robot. Autom., vol. 16, no. 3, pp. 301-312, June 2000.
    • (2000) IEEE Trans. Robot. Autom , vol.16 , Issue.3 , pp. 301-312
    • Kuo, H.C.1    Huang, P.H.2
  • 11
    • 0038381018 scopus 로고    scopus 로고
    • Scheduling of a large-scale production system based on a continuous and timed Petri net model
    • March
    • W. Y. Kim, A. Inaba, T. Suzuki, and S. Okuma, "Scheduling of a large-scale production system based on a continuous and timed Petri net model," IEICE Trans. Inf. & Syst., vol. E86-D, no. 3, pp. 583-593, March 2003.
    • (2003) IEICE Trans. Inf. & Syst , vol.E86-D , Issue.3 , pp. 583-593
    • Kim, W.Y.1    Inaba, A.2    Suzuki, T.3    Okuma, S.4
  • 12
    • 8644277055 scopus 로고    scopus 로고
    • Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability
    • Nov
    • R. Kumar, K. M. Tiwari, and A. Allada, "Modelling and rescheduling of a re-entrant wafer fabrication line involving machine unreliability," Int. J. of Prod. Res., vol. 42, no. 21, pp. 4431-4455, Nov. 2004.
    • (2004) Int. J. of Prod. Res , vol.42 , Issue.21 , pp. 4431-4455
    • Kumar, R.1    Tiwari, K.M.2    Allada, A.3
  • 13
    • 0032643683 scopus 로고    scopus 로고
    • Modelling product quality in a machining centre using fuzzy Petri nets with neural networks
    • May
    • M. Hanna, "Modelling product quality in a machining centre using fuzzy Petri nets with neural networks," Proc. IEEE Int. Conf. on Rob. & Autom., pp. 1502-1507, May 1999.
    • (1999) Proc. IEEE Int. Conf. on Rob. & Autom , pp. 1502-1507
    • Hanna, M.1
  • 14
    • 21244441960 scopus 로고    scopus 로고
    • An intelligent modular modelling approach for quality control of CNC machines product using adaptive fuzzy Petri nets
    • China
    • Z. Kasirolvalad, M. R. Jehad Motlagh, and M. A. Shadmani, "An intelligent modular modelling approach for quality control of CNC machines product using adaptive fuzzy Petri nets," 8th Int. Conf. on Cont., Autom., Rob. and Vision, pp. 1342-1347, China, 2004.
    • (2004) 8th Int. Conf. on Cont., Autom., Rob. and Vision , pp. 1342-1347
    • Kasirolvalad, Z.1    Jehad Motlagh, M.R.2    Shadmani, M.A.3
  • 16
    • 0027960047 scopus 로고
    • Petri net modelling for multiproducts assembly systems including testing
    • P. Lutz, N. Djemel, and A. Bourjault, "Petri net modelling for multiproducts assembly systems including testing," IEEE Int. Conf. on Rob. and Auto., vol. 2, pp. 1700-1750, 1994.
    • (1994) IEEE Int. Conf. on Rob. and Auto , vol.2 , pp. 1700-1750
    • Lutz, P.1    Djemel, N.2    Bourjault, A.3
  • 17
    • 0142216504 scopus 로고    scopus 로고
    • Real time scheduling with deadlock avoidance in flexible manufacturing systems
    • Y. T. ElMakkaway and A. H. ElMaraghay, "Real time scheduling with deadlock avoidance in flexible manufacturing systems," Int. J. Adv. Manuf. Technol., vol. 22, pp. 259-270, 2003.
    • (2003) Int. J. Adv. Manuf. Technol , vol.22 , pp. 259-270
    • ElMakkaway, Y.T.1    ElMaraghay, A.H.2
  • 18
    • 0032114994 scopus 로고    scopus 로고
    • Simulation modelling and analysis of a JIT production system
    • O. F. Baykoc and S. Erol, "Simulation modelling and analysis of a JIT production system," Int. J. Production Economics, vol. 55, pp. 203-212, 1998.
    • (1998) Int. J. Production Economics , vol.55 , pp. 203-212
    • Baykoc, O.F.1    Erol, S.2
  • 19
    • 27944498107 scopus 로고    scopus 로고
    • Modelling of a large scale complex re-entrant manufacturing system by extended object oriented Petri nets
    • H. Liu, Z. Jiang, and R. Y. K. Fung, "Modelling of a large scale complex re-entrant manufacturing system by extended object oriented Petri nets," Int. J. Adv. Manuf. Technol., vol. 27, pp. 190-204, 2005.
    • (2005) Int. J. Adv. Manuf. Technol , vol.27 , pp. 190-204
    • Liu, H.1    Jiang, Z.2    Fung, R.Y.K.3
  • 20
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling systems
    • R. Li, Y. Shyu, and S. Adiga, "A heuristic rescheduling algorithm for computer-based production scheduling systems," Int. J. Prod. Res., vol. 31, no. 8, pp. 1815-1826, 1993.
    • (1993) Int. J. Prod. Res , vol.31 , Issue.8 , pp. 1815-1826
    • Li, R.1    Shyu, Y.2    Adiga, S.3
  • 23
    • 85027186881 scopus 로고    scopus 로고
    • Coloured Petri net based performance analysis of flexible manufacturing system with planned and unplanned resource breakdowns,
    • CAS 2005-61, CST 2005-30, Nov. 2005
    • T. Aized, K. Takahashi, and I. Hagiwara, "Coloured Petri net based performance analysis of flexible manufacturing system with planned and unplanned resource breakdowns," IEICE Technical Report, CAS 2005-61, CST 2005-30, Nov. 2005.
    • IEICE Technical Report
    • Aized, T.1    Takahashi, K.2    Hagiwara, I.3
  • 24
    • 0036923791 scopus 로고    scopus 로고
    • A statistical process control approach for estimating the warm-up period
    • S. Robinson, "A statistical process control approach for estimating the warm-up period," Proc. Winter Simulation Conference, pp. 439-445, 2002.
    • (2002) Proc. Winter Simulation Conference , pp. 439-445
    • Robinson, S.1
  • 28
    • 0000432952 scopus 로고
    • Simultaneous optimization of several response variables
    • G. Derringer and R. Suich, "Simultaneous optimization of several response variables," J. Quality Technology, vol. 12, pp. 214-219, 1980.
    • (1980) J. Quality Technology , vol.12 , pp. 214-219
    • Derringer, G.1    Suich, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.