메뉴 건너뛰기




Volumn 14, Issue 6, 1998, Pages 428-440

AGV schedule integrated with production in flexible manufacturing systems

Author keywords

AGV; Flexible manufacturing system; Heuristics; Scheduling

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; MACHINE TOOLS; MATERIALS HANDLING; PERFORMANCE; PRODUCTION; PRODUCTIVITY; SCHEDULING;

EID: 0031637225     PISSN: 02683768     EISSN: None     Source Type: Journal    
DOI: 10.1007/BF01304622     Document Type: Article
Times cited : (41)

References (16)
  • 3
    • 0027569359 scopus 로고
    • Robot task scheduling in a flexible manufacturing cell
    • R. E. King, T. M. Hodgson and F. W. Chafee, "Robot task scheduling in a flexible manufacturing cell", IEE Transactions, 25(2), pp. 30-37, 1993.
    • (1993) IEE Transactions , vol.25 , Issue.2 , pp. 30-37
    • King, R.E.1    Hodgson, T.M.2    Chafee, F.W.3
  • 5
    • 0021384689 scopus 로고
    • Adapting horizontal material handling systems to flexible manufacturing set-ups
    • R. A. Pierson, "Adapting horizontal material handling systems to flexible manufacturing set-ups", Industrial Engineering, pp. 175-181, 1984.
    • (1984) Industrial Engineering , pp. 175-181
    • Pierson, R.A.1
  • 6
    • 0002688837 scopus 로고
    • Tandem configurations for AGV systems offer simplicity and flexibility
    • Y. A. Bozer and M. M. Srinivasan, "Tandem configurations for AGV systems offer simplicity and flexibility", Industrial Engineering, pp. 23-27, 1989.
    • (1989) Industrial Engineering , pp. 23-27
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 8
    • 0027845081 scopus 로고    scopus 로고
    • Simultaneous scheduling of machines and automated guided vehicles
    • 19932
    • G. Uluso and U. Bilge, "Simultaneous scheduling of machines and automated guided vehicles", International Journal of Production Research, 31(12), pp. 2857-2873, 19932.
    • International Journal of Production Research , vol.31 , Issue.12 , pp. 2857-2873
    • Uluso, G.1    Bilge, U.2
  • 11
    • 0026117415 scopus 로고
    • Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
    • Y. A. Bozer and M. M. Srinivasan, "Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops", IIE Transactions, 23(1), pp. 72-82, 1991.
    • (1991) IIE Transactions , vol.23 , Issue.1 , pp. 72-82
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 14
    • 0041587598 scopus 로고
    • Simultaneous scheduling of machines and material handling devices in automated manufacturing
    • Amsterdam
    • N. Raman, F. B. Talboll and R. V. Rachamadgu, "Simultaneous scheduling of machines and material handling devices in automated manufacturing", Proceedings of the 2nd ORSA/TIMS Conference on FMS, Amsterdam, pp. 455-466, 1986.
    • (1986) Proceedings of the 2nd ORSA/TIMS Conference on FMS , pp. 455-466
    • Raman, N.1    Talboll, F.B.2    Rachamadgu, R.V.3
  • 15
    • 0028195172 scopus 로고
    • Trip-based material handling systems: Throughput capacity analysis
    • M. M. Srinivasan, Y. A. Bozer and M. Cho, "Trip-based material handling systems: throughput capacity analysis", IIE Transactions, 26(1), pp. 70-89, 1994.
    • (1994) IIE Transactions , vol.26 , Issue.1 , pp. 70-89
    • Srinivasan, M.M.1    Bozer, Y.A.2    Cho, M.3
  • 16
    • 0011782937 scopus 로고
    • A review of job shop scheduling
    • P. Mellor, "A review of job shop scheduling", Operations Research Quarterly, 17(2), pp. 161-171, 1966.
    • (1966) Operations Research Quarterly , vol.17 , Issue.2 , pp. 161-171
    • Mellor, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.