3
-
-
0042960668
-
-
Re No. 29, Construction Industry Inst. (CII), Univ. of Texas at Austin, Tex.
-
Burati, J. L., and Farrington, J. J. (1987). " Cost of quality deviations in design and construction." Rep. No. 29, Construction Industry Inst. (CII), Univ. of Texas at Austin, Tex.
-
(1987)
Cost of Quality Deviations in Design and Construction
-
-
Burati, J.L.1
Farrington, J.J.2
-
4
-
-
0023437091
-
Repeating formwork greatly reduces costs
-
" 1533-7316.
-
Burkhart, A., Touran, A., and Qabbani, Z. (1987). " Repeating formwork greatly reduces costs." Conc. Constr. 1533-7316, 32 (10), 853-855.
-
(1987)
Conc. Constr.
, vol.32
, Issue.10
, pp. 853-855
-
-
Burkhart, A.1
Touran, A.2
Qabbani, Z.3
-
5
-
-
0028417085
-
Estimating construction productivity: Neural network based approach
-
0887-3801, (),. 10.1061/(ASCE)0887-3801(1994)8:2(234)
-
Chao, L. C., and Skibniewski, M. J. (1994). " Estimating construction productivity: Neural network based approach." J. Comput. Civ. Eng. 0887-3801, 8 (2), 234-251. 10.1061/(ASCE)0887-3801(1994)8:2(234)
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.2
, pp. 234-251
-
-
Chao, L.C.1
Skibniewski, M.J.2
-
6
-
-
0141573499
-
Integration of data warehouse into knowledge-based system on construction management decision making
-
" 1023-697X.
-
Chau, K. W., Cao, Y., Anson, M., and Zhang, J. (2003). " Integration of data warehouse into knowledge-based system on construction management decision making." Hong Kong Inst. Engineers 1023-697X, 10 (1), 8-13.
-
(2003)
Hong Kong Inst. Engineers
, vol.10
, Issue.1
, pp. 8-13
-
-
Chau, K.W.1
Cao, Y.2
Anson, M.3
Zhang, J.4
-
7
-
-
34249823778
-
Situation based modeling for construction productivity
-
San Diego, ASCE, Reston, Va.
-
Choy, E., and Ruwanpura, J. Y. (2005). " Situation based modeling for construction productivity." Proc., Construction Research Congress, San Diego, ASCE, Reston, Va., 662-666.
-
(2005)
Proc., Construction Research Congress
, pp. 662-666
-
-
Choy, E.1
Ruwanpura, J.Y.2
-
8
-
-
33646734043
-
Neural networks for estimating the productivity of voncreting activities
-
DOI 10.1061/(ASCE)0733-9364(2006)132:6(650)
-
Ezeldin, A. S., and Sharara, L. M. (2006). " Neural networks for estimating the productivity of concreting activities." J. Constr. Eng. Manage. 0733-9364, 132 (6), 650-656. 10.1061/(ASCE)0733-9364(2006)132:6(650) (Pubitemid 43747850)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.6
, pp. 650-656
-
-
Ezeldin, A.S.1
Sharara, L.M.2
-
9
-
-
34249774284
-
Data warehousing for construction equipment management
-
DOI 10.1139/L06-108
-
Fan, H., Kim, H., and Zaiane, O. R. (2006). " Data warehousing for construction equipment management." Can. J. Civ. Eng. 0315-1468, 33 (12), 1480-1489. 10.1139/L06-108 (Pubitemid 46851807)
-
(2006)
Canadian Journal of Civil Engineering
, vol.33
, Issue.12
, pp. 1480-1489
-
-
Fan, H.1
Kim, H.2
Zaiane, O.R.3
-
10
-
-
33751510372
-
Historical data provide low-cost estimating tool
-
" 0030-1388.
-
Gurfinkel, M., Gurcan, G., Dmitry, V., and Foss, M. M. (2006). " Historical data provide low-cost estimating tool." Oil Gas J. 0030-1388, 104 (43), 64-68.
-
(2006)
Oil Gas J.
, vol.104
, Issue.43
, pp. 64-68
-
-
Gurfinkel, M.1
Gurcan, G.2
Dmitry, V.3
Foss, M.M.4
-
11
-
-
0025415079
-
Interactive vertical formwork selection system.
-
Hanna, A. S., and Sanvido, V. (1990). " Interactive vertical formwork selection system." Concr. Int., 12 (4), 26-32.
-
(1990)
Concr. Int.
, vol.12
, Issue.4
, pp. 26-32
-
-
Hanna, A.S.1
Sanvido, V.2
-
12
-
-
0002209085
-
Research of factors influencing construction productivity
-
0144-6193.
-
Herbsman, Z., and Ellis, R. (1990). " Research of factors influencing construction productivity." Constr. Manage. Econom. 0144-6193, 8 (1), 49-61.
-
(1990)
Constr. Manage. Econom.
, vol.8
, Issue.1
, pp. 49-61
-
-
Herbsman, Z.1
Ellis, R.2
-
14
-
-
0029747295
-
Making effective use of construction lessons learned in project life cycle
-
10.1061/(ASCE)0733-9364(1996)122:1(14)
-
Kartam, N. (1996). " Making effective use of construction lessons learned in project life cycle." J. Constr. Eng. Manage., 122 (1), 14-20. 10.1061/(ASCE)0733-9364(1996)122:1(14)
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 14-20
-
-
Kartam, N.1
-
15
-
-
0004200824
-
-
5th Ed., Hold, Rinehart, and Winston Inc., Orlando, Fla.
-
Kidder, L. H., and Judd, C. M. (1986). Research methods in social relations, 5th Ed., Hold, Rinehart, and Winston Inc., Orlando, Fla., 53-55.
-
(1986)
Research Methods in Social Relations
, pp. 53-55
-
-
Kidder, L.H.1
Judd, C.M.2
-
16
-
-
69149091772
-
An automated approach for generating integrated model-based representations of construction project histories
-
Beijing, ASCE, Reston, Va.
-
Kiziltas, S., and Akinci, B. (2008). " An automated approach for generating integrated model-based representations of construction project histories." Proc., 12th International Conference on Computing in Civil and Building Engineering (ICCCBE-XII), Beijing, ASCE, Reston, Va., 1-8.
-
(2008)
Proc., 12th International Conference on Computing in Civil and Building Engineering (ICCCBE-XII)
, pp. 1-8
-
-
Kiziltas, S.1
Akinci, B.2
-
17
-
-
70350190200
-
Understanding differences in information needs of expert and novice estimators from project histories
-
", Grand Bahama Island, Bahamas, ASCE, Reston, Va.
-
Kiziltas, S., Akinci, B., and Gonzalez, C. (2008). " Understanding differences in information needs of expert and novice estimators from project histories." Proc., Construction Research Congress 2007, Grand Bahama Island, Bahamas, ASCE, Reston, Va.
-
(2008)
Proc., Construction Research Congress 2007
-
-
Kiziltas, S.1
Akinci, B.2
Gonzalez, C.3
-
18
-
-
69149105289
-
Developing integrated project histories by leveraging multi-sensor data fusion
-
", Montreal, ASCE, Reston, Va.
-
Kiziltas, S., Pradhan, A., and Akinci, B. (2006). " Developing integrated project histories by leveraging multi-sensor data fusion." Proc., Int. Conf. on Computing in Civil and Building Engineering, Montreal, ASCE, Reston, Va., 3354-3363.
-
(2006)
Proc., Int. Conf. on Computing in Civil and Building Engineering
, pp. 3354-3363
-
-
Kiziltas, S.1
Pradhan, A.2
Akinci, B.3
-
19
-
-
0022266352
-
Climatic effect on construction
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1985)111:2(129)
-
Koehn, E., and Brown, G. (1985). " Climatic effect on construction." J. Constr. Eng. Manage. 0733-9364, 111 (2), 129-137. 10.1061/(ASCE)0733-9364(1985)111:2(129)
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.2
, pp. 129-137
-
-
Koehn, E.1
Brown, G.2
-
20
-
-
2342445207
-
Construction productivity improvement: A study of human, managerial and external factors
-
", Honolulu, ASCE, Reston, Va.
-
Liberda, M., Ruwanpura, J. Y., and Jergeas, G. (2003). " Construction productivity improvement: A study of human, managerial and external factors." Proc., ASCE Construction Research Congress, Honolulu, ASCE, Reston, Va.
-
(2003)
Proc., ASCE Construction Research Congress
-
-
Liberda, M.1
Ruwanpura, J.Y.2
Jergeas, G.3
-
21
-
-
2342444607
-
Factors affecting the productivity of the construction industry in Thailand: The foremen's perception
-
Honolulu, ASCE, Reston, Va.
-
Makulsawatudom, A., and Emsley, M. (2003). " Factors affecting the productivity of the construction industry in Thailand: The foremen's perception." Proc., ASCE Construction Research Congress, Honolulu, ASCE, Reston, Va.
-
(2003)
Proc., ASCE Construction Research Congress
-
-
Makulsawatudom, A.1
Emsley, M.2
-
22
-
-
27644579198
-
Field factors affecting masonry productivity
-
1528-7106.
-
Ovararin, N., and Popescu, C. (2001). " Field factors affecting masonry productivity." AACE Int. Trans. 1528-7106, 2001, ES91-97.
-
(2001)
AACE Int. Trans.
, vol.2001
, pp. 91-97
-
-
Ovararin, N.1
Popescu, C.2
-
23
-
-
0027609355
-
Common mistakes in construction cost estimation and their lessons
-
0274-9696.
-
Paek, J. H. (1993). " Common mistakes in construction cost estimation and their lessons." Cost Eng. 0274-9696, 35 (6), 29-33.
-
(1993)
Cost Eng.
, vol.35
, Issue.6
, pp. 29-33
-
-
Paek, J.H.1
-
25
-
-
25144501666
-
Risk analysis in cost planning and its effect on efficiency in capital cost budgeting
-
DOI 10.1108/EUM0000000006244
-
Picken, D. H., and Mak, S. (2001). " Risk analysis in cost planning and its effect on efficiency in capital cost budgeting." Logist. Inf. Manag. 0957-6053, 14 (5/6), 318-329. 10.1108/EUM0000000006244 (Pubitemid 33363201)
-
(2001)
Logistics information management
, vol.14
, Issue.5-6
, pp. 318-327
-
-
Picken, D.H.1
Mak, S.2
-
26
-
-
0001362287
-
Neural network model for estimating construction productivity
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1997)123:4(399)
-
Portas, J., and AbouRizk, S. (1997). " Neural network model for estimating construction productivity." J. Constr. Eng. Manage. 0733-9364, 123 (4), 399-410. 10.1061/(ASCE)0733-9364(1997)123:4(399)
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.4
, pp. 399-410
-
-
Portas, J.1
Abourizk, S.2
-
28
-
-
0024073268
-
Management of productivity in construction
-
0257-3431.
-
Rau, N. A. (1988). " Management of productivity in construction." J. Inst. Eng. (India) 0257-3431, 69, 113-116.
-
(1988)
J. Inst. Eng. (India)
, vol.69
, pp. 113-116
-
-
Rau, N.A.1
-
29
-
-
0010039648
-
-
RSMeans., 63rd Ed., RSMeans, Mass.
-
RSMeans. (2005). Building construction cost data, 63rd Ed., RSMeans, Mass.
-
(2005)
Building Construction Cost Data
-
-
-
30
-
-
0027608442
-
Computerized daily site reporting
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1993)119:2(385)
-
Russell, A. (1993). " Computerized daily site reporting." J. Constr. Eng. Manage. 0733-9364, 119 (2), 385-402. 10.1061/(ASCE)0733-9364(1993) 119:2(385)
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 385-402
-
-
Russell, A.1
-
31
-
-
0038800863
-
A neural network based system for analyzing earth-moving operations
-
0144-6193, (),. 10.1080/014461999371385
-
Shi, J. (1999). " A neural network based system for analyzing earth-moving operations." Constr. Manage. Econom. 0144-6193, 17 (4), 463-474. 10.1080/014461999371385
-
(1999)
Constr. Manage. Econom.
, vol.17
, Issue.4
, pp. 463-474
-
-
Shi, J.1
-
32
-
-
0027545630
-
Factors influencing formwork productivity
-
0315-1468.
-
Smith, G. R., and Hanna, A. S. (1993). " Factors influencing formwork productivity." Can. J. Civ. Eng. 0315-1468, 20 (1), 144-153.
-
(1993)
Can. J. Civ. Eng.
, vol.20
, Issue.1
, pp. 144-153
-
-
Smith, G.R.1
Hanna, A.S.2
-
33
-
-
0032640764
-
Earthmoving productivity estimation using linear regression techniques
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1999)125:3(133)
-
Smith, S. D. (1999). " Earthmoving productivity estimation using linear regression techniques." J. Constr. Eng. Manage. 0733-9364, 125 (3), 133-141. 10.1061/(ASCE)0733-9364(1999)125:3(133)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 133-141
-
-
Smith, S.D.1
-
34
-
-
13944255841
-
Design review checking system with corporate lessons learned
-
DOI 10.1061/(ASCE)0733-9364(2003)129:5(475)
-
Soibelman, L., Liu, L. Y., Kirby, J. G., East, E. W., Caldas, C. H., and Lin, K. (2003). " Design review checking system with corporate LL." J. Constr. Eng. Manage. 0733-9364, 129 (5), 475-484. 10.1061/(ASCE)0733-9364(2003) 129:5(475) (Pubitemid 40265434)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 475-484
-
-
Soibelman, L.1
Liu, L.Y.2
Kirby, J.G.3
East, E.W.4
Caldas, C.H.5
Lin, K.-Y.6
-
35
-
-
0042889331
-
A generic feature-driven activity-based cost estimation process
-
" 1474-0346, (),. 10.1016/S1474-0346(03)00017-X
-
Staub-French, S., Fisher, M., Kunz, J., and Paulson, B. (2003). " A generic feature-driven activity-based cost estimation process." Adv. Eng. Inf. 1474-0346, 17 (1), 23-39. 10.1016/S1474-0346(03)00017-X
-
(2003)
Adv. Eng. Inf.
, vol.17
, Issue.1
, pp. 23-39
-
-
Staub-French, S.1
Fisher, M.2
Kunz, J.3
Paulson, B.4
-
36
-
-
0344240116
-
Construction baseline productivity: Theory and practice
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1999)125:5(295)
-
Thomas, R., and Zavrski, I. (1999). " Construction baseline productivity: Theory and practice." J. Constr. Eng. Manage. 0733-9364, 125 (5), 295-303. 10.1061/(ASCE)0733-9364(1999)125:5(295)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 295-303
-
-
Thomas, R.1
Zavrski, I.2
-
37
-
-
0024073659
-
Concrete formwork: Constructability and difficulties
-
0886-9685.
-
Touran, A. (1988). " Concrete formwork: Constructability and difficulties." Civ. Eng. Pract. 0886-9685, 3 (2), 81-88.
-
(1988)
Civ. Eng. Pract.
, vol.3
, Issue.2
, pp. 81-88
-
-
Touran, A.1
|