-
1
-
-
0005585713
-
Cost efficient future automation and transport concepts
-
U. Bader, J. Dorner, J. Schlieber, T. Kaufmann and M. Garbers, Cost efficient future automation and transport concepts, Proc. of the 7th IEEE International Symposium on Semiconductor Manufacturing, pp.57-60, 1998.
-
(1998)
Proc. of the 7th IEEE International Symposium on Semiconductor Manufacturing
, pp. 57-60
-
-
Bader, U.1
Dorner, J.2
Schlieber, J.3
Kaufmann, T.4
Garbers, M.5
-
2
-
-
0003126647
-
Material handling automation - trends, vision, and future plans
-
D. Pillai and S. Srinivasan, Material handling automation - trends, vision, and future plans, Proc. of the 1997 IEEE/SEMI International Symposium on Semiconductor Manufacturing, pp.251-254, 1997.
-
(1997)
Proc. of the 1997 IEEE/SEMI International Symposium on Semiconductor Manufacturing
, pp. 251-254
-
-
Pillai, D.1
Srinivasan, S.2
-
4
-
-
5144231627
-
Dynamic OHT allocation and dispatching in large-scale, 300mm AMHS management
-
D. Y. Liao and H. S. Fu, Dynamic OHT allocation and dispatching in large-scale, 300mm AMHS management, Proc. of the IEEE Robot Automation Magazine, vol.11, no.3, pp.22-32, 2004.
-
(2004)
Proc. of the IEEE Robot Automation Magazine
, vol.11
, Issue.3
, pp. 22-32
-
-
Liao, D.Y.1
Fu, H.S.2
-
5
-
-
63549083213
-
Distributed optimization method for simultaneous production scheduling and transportation routing in semiconductor fabrication bays
-
T. Furusho, T. Nishi and M. Konishi, Distributed optimization method for simultaneous production scheduling and transportation routing in semiconductor fabrication bays, International Journal of Innovative Computing, Information and Control, vol.4, no.3, pp.559-575, 2008.
-
(2008)
International Journal of Innovative Computing, Information and Control
, vol.4
, Issue.3
, pp. 559-575
-
-
Furusho, T.1
Nishi, T.2
Konishi, M.3
-
7
-
-
48249084128
-
Transportation problems on a fuzzy network
-
M. Chen, H. Ishii and C. Wu, Transportation problems on a fuzzy network, International Journal of Innovative Computing, Information and Control, vol.4, no.5, pp.1105-1109, 2008.
-
(2008)
International Journal of Innovative Computing, Information and Control
, vol.4
, Issue.5
, pp. 1105-1109
-
-
Chen, M.1
Ishii, H.2
Wu, C.3
-
8
-
-
48249122695
-
A simulation optimization algorithm with heuristic transportation and its application to vehicle routing problems
-
X. Hu, Y. Li, J. Guo, L. Sun and A. Z. Zeng, A simulation optimization algorithm with heuristic transportation and its application to vehicle routing problems, International Journal of Innovative Computing, Information and Control, vol.4, no.5, pp.1169-1181, 2008.
-
(2008)
International Journal of Innovative Computing, Information and Control
, vol.4
, Issue.5
, pp. 1169-1181
-
-
Hu, X.1
Li, Y.2
Guo, J.3
Sun, L.4
Zeng, A.Z.5
-
9
-
-
63649146856
-
Real-time AGV actions control by dialogue to realize autonomous decentralized FMS
-
H. Yamamoto and R. Ramli, Real-time AGV actions control by dialogue to realize autonomous decentralized FMS, International Journal of Innovative Computing, Information and Control, vol.4, no.3, pp.501-511, 2008.
-
(2008)
International Journal of Innovative Computing, Information and Control
, vol.4
, Issue.3
, pp. 501-511
-
-
Yamamoto, H.1
Ramli, R.2
-
10
-
-
63649153580
-
Design of signal fuzzy controller of single intersection in intelligence transportation system
-
W. G. Ma, Design of signal fuzzy controller of single intersection in intelligence transportation system, International Journal of Innovative Computing, Information and Control, vol.3, no.4, pp.1023-1029, 2007.
-
(2007)
International Journal of Innovative Computing, Information and Control
, vol.3
, Issue.4
, pp. 1023-1029
-
-
Ma, W.G.1
-
11
-
-
4344590961
-
Neural-network-based delivery time estimates for prioritized 300mm automatic material handling operations
-
D. Y. Liao and C. N. Wang, Neural-network-based delivery time estimates for prioritized 300mm automatic material handling operations, IEEE Transaction on Semiconductor Manufacturing, vol.17, no.3, pp.324-332, 2004.
-
(2004)
IEEE Transaction on Semiconductor Manufacturing
, vol.17
, Issue.3
, pp. 324-332
-
-
Liao, D.Y.1
Wang, C.N.2
-
12
-
-
24144448737
-
Modularized simulation for lot delivery time forecast in automatic material handling systems of 300mm semiconductor manufacturing
-
S. K. Liang and C. N. Wang, Modularized simulation for lot delivery time forecast in automatic material handling systems of 300mm semiconductor manufacturing, International Journal of Advanced Manufacturing Technology, vol.26, no.5, pp.645-652, 2005.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.26
, Issue.5
, pp. 645-652
-
-
Liang, S.K.1
Wang, C.N.2
-
13
-
-
33746911598
-
Differentiated preemptive dispatching for automatic materials handling services in 300mm semiconductor foundry
-
D. Y. Liao and C. N. Wang, Differentiated preemptive dispatching for automatic materials handling services in 300mm semiconductor foundry, International Journal of Advanced Manufacturing Technology, vol.29, no.9-10, pp.890-896, 2006.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.29
, Issue.9-10
, pp. 890-896
-
-
Liao, D.Y.1
Wang, C.N.2
-
14
-
-
0012258428
-
300mm factory layout and material handling modeling: Phase I report
-
Austin
-
T. Quinn and E. Bass, 300mm factory layout and material handling modeling: Phase I report, International SEMATECH, Inc., Austin, 1999.
-
(1999)
International SEMATECH, Inc
-
-
Quinn, T.1
Bass, E.2
-
15
-
-
33646726655
-
300mm factory layout and material handling modeling: Phase II report
-
Austin
-
E. Campbell and J. Ammenheuser, 300mm factory layout and material handling modeling: Phase II report, International SEMATECH, Inc., Austin, 1999.
-
(1999)
International SEMATECH, Inc
-
-
Campbell, E.1
Ammenheuser, J.2
|