Volumn 22, Issue 6, 2004, Pages 489-497

Critical clouds and critical sets in resource-constrained projects

Author keywords

Critical chain; Critical cloud; Critical path; Critical sequence; Critical set; Critical tasks; Criticality in resource constrained projects

Indexed keywords

ALGORITHMS; CLOUDS; CONSTRAINT THEORY;

EID: 2442545204     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2003.11.004     Document Type: Article
Times cited : (20)

References (19)
  • 2
    • 0001620447 scopus 로고
    • Critical-path planning and scheduling: Mathematical basis
    • Kelley J.E. Critical-path planning and scheduling: mathematical basis Operat. Res. 9 3 1961 296-320
    • (1961) Operat. Res. , vol.9 , Issue.3 , pp. 296-320
    • Kelley, J.E.1
  • 3
    • 0040069749 scopus 로고
    • Precedence diagramming method: Some unusual characteristics and their implications for project managers
    • Wiest J.D. Precedence diagramming method: Some unusual characteristics and their implications for project managers J. Operat. Manage. 1 3 1981 121-130
    • (1981) J. Operat. Manage. , vol.1 , Issue.3 , pp. 121-130
    • Wiest, J.D.1
  • 5
    • 0001215033 scopus 로고
    • The analysis of activity networks under generalized precedence relations (GPRs)
    • Elmaghraby S.E. Kamburowski J. The analysis of activity networks under generalized precedence relations (GPRs) Manage. Sci. 38 9 1992 1245-1263
    • (1992) Manage. Sci. , vol.38 , Issue.9 , pp. 1245-1263
    • Elmaghraby, S.E.1    Kamburowski, J.2
  • 6
    • 0029635345 scopus 로고
    • Activity nets: A guided tour through some recent developments
    • Elmaghraby S.E. Activity nets: A guided tour through some recent developments Eur. J. Operat. Res. 82 3 1995 383-408
    • (1995) Eur. J. Operat. Res. , vol.82 , Issue.3 , pp. 383-408
    • Elmaghraby, S.E.1
  • 8
    • 0001303226 scopus 로고
    • Some properties of schedules for large projects with limited resources
    • Wiest J.D. Some properties of schedules for large projects with limited resources Operat. Res. 12 3 1964 395-418
    • (1964) Operat. Res. , vol.12 , Issue.3 , pp. 395-418
    • Wiest, J.D.1
  • 10
    • 0033701652 scopus 로고    scopus 로고
    • Interpreting float in resource constrained projects
    • Bowers J.A. Interpreting float in resource constrained projects Int. J. Project Manage. 18 6 2000 385-392
    • (2000) Int. J. Project Manage. , vol.18 , Issue.6 , pp. 385-392
    • Bowers, J.A.1
  • 12
    • 38249030739 scopus 로고
    • Identifying the critical sequence in a resource constrained project
    • Woodworth B.M. Shanahan S. Identifying the critical sequence in a resource constrained project Int. J. Project Manage. 6 2 1988 89-96
    • (1988) Int. J. Project Manage. , vol.6 , Issue.2 , pp. 89-96
    • Woodworth, B.M.1    Shanahan, S.2
  • 13
    • 0024700526 scopus 로고
    • Is resource-constrained project management software reliable?
    • Woodworth B.M. Is resource-constrained project management software reliable? Cost Eng. 31 7 1989 7-11
    • (1989) Cost Eng. , vol.31 , Issue.7 , pp. 7-11
    • Woodworth, B.M.1
  • 14
    • 0029220230 scopus 로고
    • Criticality in resource constrained networks
    • Bowers J.A. Criticality in resource constrained networks J. Operat. Res. Soc. 46 1 1995 80-91
    • (1995) J. Operat. Res. Soc. , vol.46 , Issue.1 , pp. 80-91
    • Bowers, J.A.1
  • 15
    • 0030216997 scopus 로고    scopus 로고
    • Effect of resource constraints on float calculations in project network
    • Raz T. Marshall B. Effect of resource constraints on float calculations in project network Int. J. Project Manage. 14 4 1996 241-248
    • (1996) Int. J. Project Manage. , vol.14 , Issue.4 , pp. 241-248
    • Raz, T.1    Marshall, B.2
  • 16
    • 2442630815 scopus 로고    scopus 로고
    • Take the path that is really critical
    • Uyttewaal E. Take the path that is really critical PM Network 13 12 1999 37-39
    • (1999) PM Network , vol.13 , Issue.12 , pp. 37-39
    • Uyttewaal, E.1
  • 17
    • 0003926816 scopus 로고    scopus 로고
    • Great Barrington (MA): The North River Press
    • Goldratt E.M. Critical chain 1997 The North River Press Great Barrington (MA)
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 18
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen W.S. Leus R. On the merits and pitfalls of critical chain scheduling J. Operat. Manage. 19 5 2001 559-577
    • (2001) J. Operat. Manage. , vol.19 , Issue.5 , pp. 559-577
    • Herroelen, W.S.1    Leus, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.