-
2
-
-
0001620447
-
Critical-path planning and scheduling: Mathematical basis
-
Kelley J.E. Critical-path planning and scheduling: mathematical basis Operat. Res. 9 3 1961 296-320
-
(1961)
Operat. Res.
, vol.9
, Issue.3
, pp. 296-320
-
-
Kelley, J.E.1
-
3
-
-
0040069749
-
Precedence diagramming method: Some unusual characteristics and their implications for project managers
-
Wiest J.D. Precedence diagramming method: Some unusual characteristics and their implications for project managers J. Operat. Manage. 1 3 1981 121-130
-
(1981)
J. Operat. Manage.
, vol.1
, Issue.3
, pp. 121-130
-
-
Wiest, J.D.1
-
5
-
-
0001215033
-
The analysis of activity networks under generalized precedence relations (GPRs)
-
Elmaghraby S.E. Kamburowski J. The analysis of activity networks under generalized precedence relations (GPRs) Manage. Sci. 38 9 1992 1245-1263
-
(1992)
Manage. Sci.
, vol.38
, Issue.9
, pp. 1245-1263
-
-
Elmaghraby, S.E.1
Kamburowski, J.2
-
6
-
-
0029635345
-
Activity nets: A guided tour through some recent developments
-
Elmaghraby S.E. Activity nets: A guided tour through some recent developments Eur. J. Operat. Res. 82 3 1995 383-408
-
(1995)
Eur. J. Operat. Res.
, vol.82
, Issue.3
, pp. 383-408
-
-
Elmaghraby, S.E.1
-
8
-
-
0001303226
-
Some properties of schedules for large projects with limited resources
-
Wiest J.D. Some properties of schedules for large projects with limited resources Operat. Res. 12 3 1964 395-418
-
(1964)
Operat. Res.
, vol.12
, Issue.3
, pp. 395-418
-
-
Wiest, J.D.1
-
10
-
-
0033701652
-
Interpreting float in resource constrained projects
-
Bowers J.A. Interpreting float in resource constrained projects Int. J. Project Manage. 18 6 2000 385-392
-
(2000)
Int. J. Project Manage.
, vol.18
, Issue.6
, pp. 385-392
-
-
Bowers, J.A.1
-
12
-
-
38249030739
-
Identifying the critical sequence in a resource constrained project
-
Woodworth B.M. Shanahan S. Identifying the critical sequence in a resource constrained project Int. J. Project Manage. 6 2 1988 89-96
-
(1988)
Int. J. Project Manage.
, vol.6
, Issue.2
, pp. 89-96
-
-
Woodworth, B.M.1
Shanahan, S.2
-
13
-
-
0024700526
-
Is resource-constrained project management software reliable?
-
Woodworth B.M. Is resource-constrained project management software reliable? Cost Eng. 31 7 1989 7-11
-
(1989)
Cost Eng.
, vol.31
, Issue.7
, pp. 7-11
-
-
Woodworth, B.M.1
-
14
-
-
0029220230
-
Criticality in resource constrained networks
-
Bowers J.A. Criticality in resource constrained networks J. Operat. Res. Soc. 46 1 1995 80-91
-
(1995)
J. Operat. Res. Soc.
, vol.46
, Issue.1
, pp. 80-91
-
-
Bowers, J.A.1
-
15
-
-
0030216997
-
Effect of resource constraints on float calculations in project network
-
Raz T. Marshall B. Effect of resource constraints on float calculations in project network Int. J. Project Manage. 14 4 1996 241-248
-
(1996)
Int. J. Project Manage.
, vol.14
, Issue.4
, pp. 241-248
-
-
Raz, T.1
Marshall, B.2
-
16
-
-
2442630815
-
Take the path that is really critical
-
Uyttewaal E. Take the path that is really critical PM Network 13 12 1999 37-39
-
(1999)
PM Network
, vol.13
, Issue.12
, pp. 37-39
-
-
Uyttewaal, E.1
-
17
-
-
0003926816
-
-
Great Barrington (MA): The North River Press
-
Goldratt E.M. Critical chain 1997 The North River Press Great Barrington (MA)
-
(1997)
Critical Chain
-
-
Goldratt, E.M.1
-
18
-
-
0035480172
-
On the merits and pitfalls of critical chain scheduling
-
Herroelen W.S. Leus R. On the merits and pitfalls of critical chain scheduling J. Operat. Manage. 19 5 2001 559-577
-
(2001)
J. Operat. Manage.
, vol.19
, Issue.5
, pp. 559-577
-
-
Herroelen, W.S.1
Leus, R.2
|