메뉴 건너뛰기




Volumn 1, Issue 2, 2007, Pages 182-199

Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups

Author keywords

bio inspired division of labour; dynamic job shop scheduling; multiagent coordination; parameter setting; response threshold hold

Indexed keywords


EID: 84969452433     PISSN: 17515254     EISSN: 17515262     Source Type: Journal    
DOI: 10.1504/EJIE.2007.014108     Document Type: Article
Times cited : (14)

References (36)
  • 1
    • 0035279073 scopus 로고    scopus 로고
    • An agent-based approach for scheduling multiple machines
    • Akkiraju, R., Keskinocak, P., Murthy, S. and Wu, F. (2001) ‘An agent-based approach for scheduling multiple machines’, Applied Intelligence, Vol. 14, No. 2, pp.135–144.
    • (2001) Applied Intelligence , vol.14 , Issue.2 , pp. 135-144
    • Akkiraju, R.1    Keskinocak, P.2    Murthy, S.3    Wu, F.4
  • 2
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A., Gupta, J.N.D. and Aldowaisan, T. (1999) ‘A review of scheduling research involving setup considerations’, Omega, Vol. 27, pp.219–239.
    • (1999) Omega , vol.27 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 6
    • 0003666510 scopus 로고    scopus 로고
    • Adaptive task allocation inspired by a model of division of labor in social insects
    • D. Lundh and B. Olsson (Eds) World Scientific
    • Bonabeau, E., Sobkowski, A., Theraulaz, G. and Deneubourg, J.L. (1997) ‘Adaptive task allocation inspired by a model of division of labor in social insects’, in D. Lundh and B. Olsson (Eds). BioComputation and Emergent Computing, World Scientific, pp.36–45.
    • (1997) BioComputation and Emergent Computing , pp. 36-45
    • Bonabeau, E.1    Sobkowski, A.2    Theraulaz, G.3    Deneubourg, J.L.4
  • 8
    • 23044528187 scopus 로고    scopus 로고
    • Dynamic scheduling and division of labor in social insects
    • Campos, M., Bonabeau, E., Theraulaz, G. and Deneubourg, J-L. (2000) ‘Dynamic scheduling and division of labor in social insects’, Adaptive Behavior, Vol. 8, No. 2, pp.83–96.
    • (2000) Adaptive Behavior , vol.8 , Issue.2 , pp. 83-96
    • Campos, M.1    Bonabeau, E.2    Theraulaz, G.3    Deneubourg, J.-L.4
  • 12
    • 84969452487 scopus 로고    scopus 로고
    • IJCAI-01 Workshop on Artificial Intelligence and Manufacturing: New AI Paradigms for Manufacturing, August
    • Cicirello, V. and Smith, S. (2001d) ‘Insect societies and manufacturing’, IJCAI-01 Workshop on Artificial Intelligence and Manufacturing: New AI Paradigms for Manufacturing, August.
    • (2001) Insect societies and manufacturing
    • Cicirello, V.1    Smith, S.2
  • 13
    • 0034834190 scopus 로고    scopus 로고
    • Wasp nests for self-configurable factories
    • J.P. Muller, E. Andre, S. Sen and C. Frasson (Eds) Montreal, Quebec, Canada: ACM Press
    • Cicirello, V. and Smith, S. (2001e) ‘Wasp nests for self-configurable factories’, in J.P. Muller, E. Andre, S. Sen and C. Frasson (Eds). Proceedings of the Fifth International Conference on Autonomous Agents, Montreal, Quebec, Canada: ACM Press, pp.473–480.
    • (2001) Proceedings of the Fifth International Conference on Autonomous Agents , pp. 473-480
    • Cicirello, V.1    Smith, S.2
  • 16
    • 0035128384 scopus 로고    scopus 로고
    • Using experimental design to find effective parameter settings for heuristics
    • Coy, S.P., Golden, B.L., Runger, G.C. and Wasil, E.A. (2001) ‘Using experimental design to find effective parameter settings for heuristics’, Journal of Heuristics, Vol. 7, No. 1, pp.77–97.
    • (2001) Journal of Heuristics , vol.7 , Issue.1 , pp. 77-97
    • Coy, S.P.1    Golden, B.L.2    Runger, G.C.3    Wasil, E.A.4
  • 18
    • 0032668814 scopus 로고    scopus 로고
    • Scheduling in job shops with machine breakdowns: an experimental study
    • Holthaus, O. (1999) ‘Scheduling in job shops with machine breakdowns: an experimental study’, Computer and Industrial Engineering, Vol. 36, No. 1, pp.137–162.
    • (1999) Computer and Industrial Engineering , vol.36 , Issue.1 , pp. 137-162
    • Holthaus, O.1
  • 19
    • 58149109362 scopus 로고    scopus 로고
    • Do ants paint trucks better than chickens? Market versus response thresholds for distributed dynamic scheduling
    • Canberra, Australia, 8–12 December
    • Kittithreerapronchai, O. and Anderson, C. (2003) ‘Do ants paint trucks better than chickens? Market versus response thresholds for distributed dynamic scheduling’, Proceedings of the 2003 IEEE Congress on Evolutionary Computation, Canberra, Australia, 8–12 December.
    • (2003) Proceedings of the 2003 IEEE Congress on Evolutionary Computation
    • Kittithreerapronchai, O.1    Anderson, C.2
  • 22
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • Lin, G. and Solberg, J. (1992) ‘Integrated shop floor control using autonomous agents’, IIE Transactions: Design and Manufacturing, Vol. 24, pp.57–71.
    • (1992) IIE Transactions: Design and Manufacturing , vol.24 , pp. 57-71
    • Lin, G.1    Solberg, J.2
  • 25
    • 85008031856 scopus 로고    scopus 로고
    • Performance evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems (Special Issue on Intelligent Manufacturing Planning and Shop floor Control)
    • Saad, A., Kawamura, K. and Biswas, G. (1997) ‘Performance evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems (Special Issue on Intelligent Manufacturing Planning and Shop floor Control)’, International Journal of Automation and Soft Computing, Vol. 3, No. 3, pp.229–248.
    • (1997) International Journal of Automation and Soft Computing , vol.3 , Issue.3 , pp. 229-248
    • Saad, A.1    Kawamura, K.2    Biswas, G.3
  • 26
    • 0035195362 scopus 로고    scopus 로고
    • Real-time manipulation of alternative routings in flexible manufacturing systems: a simulation study
    • Saygin, C., Chen, F.F. and Singh, J. (2001) ‘Real-time manipulation of alternative routings in flexible manufacturing systems: a simulation study’, International Journal of Advanced Manufacturing Technology, Vol. 18, No. 10, pp.755–763.
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , Issue.10 , pp. 755-763
    • Saygin, C.1    Chen, F.F.2    Singh, J.3
  • 27
    • 0028452796 scopus 로고
    • Improved approximation algorithms for shop scheduling problems
    • Shmoys, D.B., Stein, C. and Wein, J. (1994) ‘Improved approximation algorithms for shop scheduling problems’, SIAM Journal on Computing, Vol. 23, No. 3, pp.617–632.
    • (1994) SIAM Journal on Computing , vol.23 , Issue.3 , pp. 617-632
    • Shmoys, D.B.1    Stein, C.2    Wein, J.3
  • 28
    • 1342287300 scopus 로고    scopus 로고
    • Auction-based distributed scheduling and control scheme for flexible manufacturing systems
    • Siwamogsatham, T. and Saygin, C. (2004) ‘Auction-based distributed scheduling and control scheme for flexible manufacturing systems’, International Journal of Production Research, Vol. 42, No. 3, pp.547–572.
    • (2004) International Journal of Production Research , vol.42 , Issue.3 , pp. 547-572
    • Siwamogsatham, T.1    Saygin, C.2
  • 30
    • 33749558532 scopus 로고    scopus 로고
    • Exploiting the flexibility of multiple job routes in a dynamic job shop
    • Subramaniam, V., Ramesh, T. and Raheja, A.S. (2002) ‘Exploiting the flexibility of multiple job routes in a dynamic job shop’, Studies in Informatics and Control, Vol. 11, No. 2, Available at: http://www.ici.ro/ici/revista/sic2002_2/art1.html.
    • (2002) Studies in Informatics and Control , vol.11 , Issue.2
    • Subramaniam, V.1    Ramesh, T.2    Raheja, A.S.3
  • 32
    • 0031118685 scopus 로고    scopus 로고
    • Evaluation of alternate routing policies in scheduling a job-shop type FMS
    • Tunali, S. (1997) ‘Evaluation of alternate routing policies in scheduling a job-shop type FMS’, Computers Industrial Engineering, Vol. 32, No. 2, pp.243–250.
    • (1997) Computers Industrial Engineering , vol.32 , Issue.2 , pp. 243-250
    • Tunali, S.1
  • 33
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: a framework of strategies, policies and methods
    • Vieira, G.E., Herrmann, J.W. and Lin, E. (2003) ‘Rescheduling manufacturing systems: a framework of strategies, policies and methods’, Journal of Scheduling, Vol. 6, pp.39–62.
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 34
    • 33749565932 scopus 로고    scopus 로고
    • An agent-based approach for flexible routing in dynamic job shop scheduling
    • 19–22 May, Orlando, FL
    • Wang, Y.C. and Usher, J.M. (2002) ‘An agent-based approach for flexible routing in dynamic job shop scheduling’, Proceedings of Industrial Engineering Research Conference, 19–22 May, Orlando, FL.
    • (2002) Proceedings of Industrial Engineering Research Conference
    • Wang, Y.C.1    Usher, J.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.