-
1
-
-
84869261524
-
-
Asian Art Museum (AAM).. "." 〈〉 (April 2, 2006).
-
Asian Art Museum (AAM). (2006). " AAM website.." 〈 http://www.asianart.org/building.htm 〉 (April 2, 2006).
-
(2006)
AAM Website
-
-
-
2
-
-
0004011301
-
-
Ph.D. dissertation, The Univ. of Birmingham, Birmingham, U.K..
-
Ballard, G. (2000a). " The Last Planner system of production control.." Ph.D. dissertation, The Univ. of Birmingham, Birmingham, U.K., 18-20.
-
(2000)
The Last Planner System of Production Control
, pp. 18-20
-
-
Ballard, G.1
-
4
-
-
69949106420
-
The St. Olaf college fieldhouse project: A case study in designing to target cost
-
Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
-
Ballard, G., and Reiser, P. (2004). " The St. Olaf college fieldhouse project: A case study in designing to target cost.." Proc., 12th Ann. Conf. of the Int. Group for Lean Construction (IGLC 12), Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
-
(2004)
Proc., 12th Ann. Conf. of the Int. Group for Lean Construction (IGLC 12)
-
-
Ballard, G.1
Reiser, P.2
-
5
-
-
85053272542
-
Lean construction tools and techniques
-
", R. Best and G. de Valence, eds., Cha, Butterworth Heinem, Elsevier Science Ltd., Amsterdam, The Netherlands.
-
Ballard, G., Tommelein, I., Koskela, L., and Howell, G. (2002). " Lean construction tools and techniques.." Design and construction: Building in value, R. Best, and, G. de Valence, eds., Chap., Butterworth Heinem, Elsevier Science Ltd., Amsterdam, The Netherlands, 227-255.
-
(2002)
Design and Construction: Building in Value
, pp. 227-255
-
-
Ballard, G.1
Tommelein, I.2
Koskela, L.3
Howell, G.4
-
6
-
-
0344047211
-
Managing with power: Strategies for improving value appropriation from supply relationships
-
Cox, A. (2001). " Managing with power: Strategies for improving value appropriation from supply relationships.." J. Supply Chain Manage., 37 (2), 42-47.
-
(2001)
J. Supply Chain Manage.
, vol.37
, Issue.2
, pp. 42-47
-
-
Cox, A.1
-
8
-
-
84869242641
-
-
Earthquake Protection Systems (EPS).. "." 〈〉 (March 17, 1996).
-
Earthquake Protection Systems (EPS). (2006). " EPS website.." 〈 http://www.earthquakeprotection.com 〉 (March 17, 1996).
-
(2006)
EPS Website
-
-
-
9
-
-
0031393171
-
Historic upgrades in San Francisco
-
".
-
Elsesser, E., Jokherst, M., and Naaseh, S. (1997). " Historic upgrades in San Francisco.." Civ. Eng. (N.Y.), 67 (10), 50-53.
-
(1997)
Civ. Eng. (N.Y.)
, vol.67
, Issue.10
, pp. 50-53
-
-
Elsesser, E.1
Jokherst, M.2
Naaseh, S.3
-
10
-
-
0027805668
-
Interaction between sub-cycles: One key to improved methods
-
".
-
Howell, G., Laufer, A., and Ballard, G. (1993). " Interaction between sub-cycles: One key to improved methods.." J. Constr. Eng. Manage., 119 (4), 714-728.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
11
-
-
0003656231
-
-
Technical Re No. 72, Center for Integrated Faculty Engineering (CIFE), Stanford Univ., Stanford, Calif.
-
Koskela, L. (1992). " Application of the new production philosophy to construction.." Technical Rep. No. 72, Center for Integrated Faculty Engineering (CIFE), Stanford Univ., Stanford, Calif.
-
(1992)
Application of the New Production Philosophy to Construction
-
-
Koskela, L.1
-
12
-
-
84869260810
-
An exploration into a production theory and its application to construction
-
VTT Building Technology, Espoo, Finland, 〈
-
Koskela, L. (2000). " An exploration into a production theory and its application to construction.." Publication No. 408, VTT Building Technology, Espoo, Finland, 〈 http://www.inf.vtt.fi/pdf/publications/2000/ P408.pdf 〉.
-
(2000)
Publication No. 408
-
-
Koskela, L.1
-
13
-
-
34250664260
-
Making do- the eighth category of waste
-
Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
-
Koskela, L. (2004). " Making do- The eighth category of waste.." Proc., 12th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 12), Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
-
(2004)
Proc., 12th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 12)
-
-
Koskela, L.1
-
14
-
-
85056052718
-
The foundations of lean construction
-
", R. Best and G. de Valence, eds., Cha, Butterworth Heinem, Elsevier Science, Ltd., Amsterdam, the Netherlands.
-
Koskela, L., Howell, G., Ballard, G., and Tommelein, I. (2002). " The foundations of lean construction.." Design and construction-Building in value, R. Best, and, G. de Valence, eds., Chap., Butterworth Heinem, Elsevier Science, Ltd., Amsterdam, the Netherlands, 211-226.
-
(2002)
Design and Construction-Building in Value
, pp. 211-226
-
-
Koskela, L.1
Howell, G.2
Ballard, G.3
Tommelein, I.4
-
15
-
-
12344306945
-
The prevalent theory of construction is a hindrance for innovation
-
Science and Technology Policy Research, Brighton, U.K.
-
Koskela, L., and Vrijhoef, R. (2000). " The prevalent theory of construction is a hindrance for innovation.." Proc., 8th Ann. Conf. of the Int. Group for Lean Construction (IGLC 8), Science and Technology Policy Research, Brighton, U.K.
-
(2000)
Proc., 8th Ann. Conf. of the Int. Group for Lean Construction (IGLC 8)
-
-
Koskela, L.1
Vrijhoef, R.2
-
16
-
-
84869246088
-
The multiple roles of specification in lean construction
-
", The Professional Activities Centre, Faculty of Engineering, National University of Singapore, Singapore.
-
Lam, P., Kumaraswamy, M., and Ng, S. (2001). " The multiple roles of specification in lean construction.." Proc., 9th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 9), The Professional Activities Centre, Faculty of Engineering, National University of Singapore, Singapore.
-
(2001)
Proc., 9th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 9)
-
-
Lam, P.1
Kumaraswamy, M.2
Ng, S.3
-
18
-
-
62549135546
-
-
Lean Construction Institute, Berkeley, Calif., Project Production Systems Laboratory, Berkeley, Calif.
-
Mar, D. (2005). Proc., Lean Design Forum, Lean Construction Institute, Berkeley, Calif., Project Production Systems Laboratory, Berkeley, Calif.
-
(2005)
Proc., Lean Design Forum
-
-
Mar, D.1
-
19
-
-
9144248650
-
Engineering the procurement process to achieve best value
-
Molenaar, K., and Johnson, D. (2003). " Engineering the procurement process to achieve best value.." Leadership Manage. Eng., 3 (3), 137-141.
-
(2003)
Leadership Manage. Eng.
, vol.3
, Issue.3
, pp. 137-141
-
-
Molenaar, K.1
Johnson, D.2
-
20
-
-
84869259427
-
-
Nova. "." 2000 Nova Award Winner, Nomination 8, 〈〉 (April 15, 2008).
-
Nova (2000). " Friction pendulum seismic isolation bearings.." 2000 Nova Award Winner, Nomination 8, 〈 http://www.cif.org/Nom2000/Nom08- 00.PDF 〉 (April 15, 2008).
-
(2000)
Friction Pendulum Seismic Isolation Bearings
-
-
-
22
-
-
84866094800
-
Proof-of-concept of set-based design for reinforced concrete structures
-
", Michigan State Universiy Printing Services, East Lansing, Mich.
-
Parrish, K., Wong, J.-M., Tommelein, I. D., and Stojadinovic, B. (2007). " Proof-of-concept of set-based design for reinforced concrete structures.." Proc., 15th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 15), Michigan State Universiy Printing Services, East Lansing, Mich.
-
(2007)
Proc., 15th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 15)
-
-
Parrish, K.1
Wong, J.-M.2
Tommelein, I.D.3
Stojadinovic, B.4
-
24
-
-
0001817489
-
Toyota's principles of set-based concurrent engineering
-
".
-
Sobek, D., Ward, A., and Liker, S. (1999). " Toyota's principles of set-based concurrent engineering.." Sloan Manage. Rev., 40 (2), 67-83.
-
(1999)
Sloan Manage. Rev.
, vol.40
, Issue.2
, pp. 67-83
-
-
Sobek, D.1
Ward, A.2
Liker, S.3
-
25
-
-
33644582698
-
-
Tavistock Institute.., London.
-
Tavistock Institute. (1966). Independence and uncertainty, London.
-
(1966)
Independence and Uncertainty
-
-
-
26
-
-
0000012732
-
Pull driven scheduling for pipe-spool installation: Simulation of a lean construction technique
-
Tommelein, I. D. (1998). " Pull driven scheduling for pipe-spool installation: Simulation of a lean construction technique.." J. Constr. Eng. Manage., 124 (4), 279-288.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
27
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
".
-
Tommelein, I. D., Riley, D., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.." J. Constr. Eng. Manage., 125 (5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
28
-
-
13944269909
-
Work structuring to achieve integrated product-process design
-
".
-
Tsao, C. C. Y., Tommelein, I. D., Swanlund, E., and Howell, G. A. (2004). " Work structuring to achieve integrated product-process design.." J. Constr. Eng. Manage., 130 (6), 780-789.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.6
, pp. 780-789
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.3
Howell, G.A.4
-
29
-
-
62549119882
-
Asian art museum retrofit
-
Monterey, Calif., Mira Digital Publishing, Vancouver.
-
Tuholski, S. J., and Rodler, P. E. (2004). " Asian art museum retrofit.." Proc., 73rd Ann. Convention, Structural Engineers Association of Northern California (SEAONC), Monterey, Calif., Mira Digital Publishing, Vancouver.
-
(2004)
Proc., 73rd Ann. Convention, Structural Engineers Association of Northern California (SEAONC)
-
-
Tuholski, S.J.1
Rodler, P.E.2
-
30
-
-
0002533915
-
The second Toyota paradox: How delaying decisions can make better cars
-
".
-
Ward, A., Liker, J., Cristiano, J., and Sobek, D. (1995). " The second Toyota paradox: How delaying decisions can make better cars.." Sloan Manage. Rev., 36 (3), 43-61.
-
(1995)
Sloan Manage. Rev.
, vol.36
, Issue.3
, pp. 43-61
-
-
Ward, A.1
Liker, J.2
Cristiano, J.3
Sobek, D.4
-
31
-
-
0003463029
-
-
HarperCollins, New York.
-
Womack, J. P., Jones, D. T., and Roos, D. (1990). The machine that changed the world, HarperCollins, New York.
-
(1990)
The Machine That Changed the World
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
|