메뉴 건너뛰기




Volumn 135, Issue 4, 2009, Pages 330-339

Lean comparison using process charts of complex seismic retrofit projects

Author keywords

Base isolation; Constructability; Fees; Lean construction; Procurement; Seismic design; Structural design

Indexed keywords

PRODUCT DESIGN; RETROFITTING; SEISMOLOGY; STRUCTURAL DESIGN;

EID: 62549162187     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:4(330)     Document Type: Article
Times cited : (9)

References (31)
  • 1
    • 84869261524 scopus 로고    scopus 로고
    • Asian Art Museum (AAM).. "." 〈〉 (April 2, 2006).
    • Asian Art Museum (AAM). (2006). " AAM website.." 〈 http://www.asianart.org/building.htm 〉 (April 2, 2006).
    • (2006) AAM Website
  • 2
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. dissertation, The Univ. of Birmingham, Birmingham, U.K..
    • Ballard, G. (2000a). " The Last Planner system of production control.." Ph.D. dissertation, The Univ. of Birmingham, Birmingham, U.K., 18-20.
    • (2000) The Last Planner System of Production Control , pp. 18-20
    • Ballard, G.1
  • 4
    • 69949106420 scopus 로고    scopus 로고
    • The St. Olaf college fieldhouse project: A case study in designing to target cost
    • Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
    • Ballard, G., and Reiser, P. (2004). " The St. Olaf college fieldhouse project: A case study in designing to target cost.." Proc., 12th Ann. Conf. of the Int. Group for Lean Construction (IGLC 12), Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
    • (2004) Proc., 12th Ann. Conf. of the Int. Group for Lean Construction (IGLC 12)
    • Ballard, G.1    Reiser, P.2
  • 5
    • 85053272542 scopus 로고    scopus 로고
    • Lean construction tools and techniques
    • ", R. Best and G. de Valence, eds., Cha, Butterworth Heinem, Elsevier Science Ltd., Amsterdam, The Netherlands.
    • Ballard, G., Tommelein, I., Koskela, L., and Howell, G. (2002). " Lean construction tools and techniques.." Design and construction: Building in value, R. Best, and, G. de Valence, eds., Chap., Butterworth Heinem, Elsevier Science Ltd., Amsterdam, The Netherlands, 227-255.
    • (2002) Design and Construction: Building in Value , pp. 227-255
    • Ballard, G.1    Tommelein, I.2    Koskela, L.3    Howell, G.4
  • 6
    • 0344047211 scopus 로고    scopus 로고
    • Managing with power: Strategies for improving value appropriation from supply relationships
    • Cox, A. (2001). " Managing with power: Strategies for improving value appropriation from supply relationships.." J. Supply Chain Manage., 37 (2), 42-47.
    • (2001) J. Supply Chain Manage. , vol.37 , Issue.2 , pp. 42-47
    • Cox, A.1
  • 8
    • 84869242641 scopus 로고    scopus 로고
    • Earthquake Protection Systems (EPS).. "." 〈〉 (March 17, 1996).
    • Earthquake Protection Systems (EPS). (2006). " EPS website.." 〈 http://www.earthquakeprotection.com 〉 (March 17, 1996).
    • (2006) EPS Website
  • 9
    • 0031393171 scopus 로고    scopus 로고
    • Historic upgrades in San Francisco
    • ".
    • Elsesser, E., Jokherst, M., and Naaseh, S. (1997). " Historic upgrades in San Francisco.." Civ. Eng. (N.Y.), 67 (10), 50-53.
    • (1997) Civ. Eng. (N.Y.) , vol.67 , Issue.10 , pp. 50-53
    • Elsesser, E.1    Jokherst, M.2    Naaseh, S.3
  • 10
    • 0027805668 scopus 로고
    • Interaction between sub-cycles: One key to improved methods
    • ".
    • Howell, G., Laufer, A., and Ballard, G. (1993). " Interaction between sub-cycles: One key to improved methods.." J. Constr. Eng. Manage., 119 (4), 714-728.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 714-728
    • Howell, G.1    Laufer, A.2    Ballard, G.3
  • 11
    • 0003656231 scopus 로고
    • Technical Re No. 72, Center for Integrated Faculty Engineering (CIFE), Stanford Univ., Stanford, Calif.
    • Koskela, L. (1992). " Application of the new production philosophy to construction.." Technical Rep. No. 72, Center for Integrated Faculty Engineering (CIFE), Stanford Univ., Stanford, Calif.
    • (1992) Application of the New Production Philosophy to Construction
    • Koskela, L.1
  • 12
    • 84869260810 scopus 로고    scopus 로고
    • An exploration into a production theory and its application to construction
    • VTT Building Technology, Espoo, Finland, 〈
    • Koskela, L. (2000). " An exploration into a production theory and its application to construction.." Publication No. 408, VTT Building Technology, Espoo, Finland, 〈 http://www.inf.vtt.fi/pdf/publications/2000/ P408.pdf 〉.
    • (2000) Publication No. 408
    • Koskela, L.1
  • 13
    • 34250664260 scopus 로고    scopus 로고
    • Making do- the eighth category of waste
    • Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
    • Koskela, L. (2004). " Making do- The eighth category of waste.." Proc., 12th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 12), Elsinore, Denmark, Lean Construction Denmark, Helsingor, Denmark.
    • (2004) Proc., 12th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 12)
    • Koskela, L.1
  • 14
    • 85056052718 scopus 로고    scopus 로고
    • The foundations of lean construction
    • ", R. Best and G. de Valence, eds., Cha, Butterworth Heinem, Elsevier Science, Ltd., Amsterdam, the Netherlands.
    • Koskela, L., Howell, G., Ballard, G., and Tommelein, I. (2002). " The foundations of lean construction.." Design and construction-Building in value, R. Best, and, G. de Valence, eds., Chap., Butterworth Heinem, Elsevier Science, Ltd., Amsterdam, the Netherlands, 211-226.
    • (2002) Design and Construction-Building in Value , pp. 211-226
    • Koskela, L.1    Howell, G.2    Ballard, G.3    Tommelein, I.4
  • 15
    • 12344306945 scopus 로고    scopus 로고
    • The prevalent theory of construction is a hindrance for innovation
    • Science and Technology Policy Research, Brighton, U.K.
    • Koskela, L., and Vrijhoef, R. (2000). " The prevalent theory of construction is a hindrance for innovation.." Proc., 8th Ann. Conf. of the Int. Group for Lean Construction (IGLC 8), Science and Technology Policy Research, Brighton, U.K.
    • (2000) Proc., 8th Ann. Conf. of the Int. Group for Lean Construction (IGLC 8)
    • Koskela, L.1    Vrijhoef, R.2
  • 16
    • 84869246088 scopus 로고    scopus 로고
    • The multiple roles of specification in lean construction
    • ", The Professional Activities Centre, Faculty of Engineering, National University of Singapore, Singapore.
    • Lam, P., Kumaraswamy, M., and Ng, S. (2001). " The multiple roles of specification in lean construction.." Proc., 9th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 9), The Professional Activities Centre, Faculty of Engineering, National University of Singapore, Singapore.
    • (2001) Proc., 9th Ann. Conf. of the Int. Group for Lean Constr. (IGLC 9)
    • Lam, P.1    Kumaraswamy, M.2    Ng, S.3
  • 18
    • 62549135546 scopus 로고    scopus 로고
    • Lean Construction Institute, Berkeley, Calif., Project Production Systems Laboratory, Berkeley, Calif.
    • Mar, D. (2005). Proc., Lean Design Forum, Lean Construction Institute, Berkeley, Calif., Project Production Systems Laboratory, Berkeley, Calif.
    • (2005) Proc., Lean Design Forum
    • Mar, D.1
  • 19
    • 9144248650 scopus 로고    scopus 로고
    • Engineering the procurement process to achieve best value
    • Molenaar, K., and Johnson, D. (2003). " Engineering the procurement process to achieve best value.." Leadership Manage. Eng., 3 (3), 137-141.
    • (2003) Leadership Manage. Eng. , vol.3 , Issue.3 , pp. 137-141
    • Molenaar, K.1    Johnson, D.2
  • 20
    • 84869259427 scopus 로고    scopus 로고
    • Nova. "." 2000 Nova Award Winner, Nomination 8, 〈〉 (April 15, 2008).
    • Nova (2000). " Friction pendulum seismic isolation bearings.." 2000 Nova Award Winner, Nomination 8, 〈 http://www.cif.org/Nom2000/Nom08- 00.PDF 〉 (April 15, 2008).
    • (2000) Friction Pendulum Seismic Isolation Bearings
  • 23
    • 84869255578 scopus 로고    scopus 로고
    • Pasadena City Hall (PCH).. "." 〈〉 (April 2, 2008).
    • Pasadena City Hall (PCH). (2008). " Pasadena City Hall seismic upgrade & rehabilitation project.." 〈 http://www.ci.pasadena.ca. us/cityhall/ 〉 (April 2, 2008).
    • (2008) Pasadena City Hall Seismic Upgrade & Rehabilitation Project
  • 24
    • 0001817489 scopus 로고    scopus 로고
    • Toyota's principles of set-based concurrent engineering
    • ".
    • Sobek, D., Ward, A., and Liker, S. (1999). " Toyota's principles of set-based concurrent engineering.." Sloan Manage. Rev., 40 (2), 67-83.
    • (1999) Sloan Manage. Rev. , vol.40 , Issue.2 , pp. 67-83
    • Sobek, D.1    Ward, A.2    Liker, S.3
  • 25
    • 33644582698 scopus 로고
    • Tavistock Institute.., London.
    • Tavistock Institute. (1966). Independence and uncertainty, London.
    • (1966) Independence and Uncertainty
  • 26
    • 0000012732 scopus 로고    scopus 로고
    • Pull driven scheduling for pipe-spool installation: Simulation of a lean construction technique
    • Tommelein, I. D. (1998). " Pull driven scheduling for pipe-spool installation: Simulation of a lean construction technique.." J. Constr. Eng. Manage., 124 (4), 279-288.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 27
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • ".
    • Tommelein, I. D., Riley, D., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.." J. Constr. Eng. Manage., 125 (5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.2    Howell, G.A.3
  • 28
    • 13944269909 scopus 로고    scopus 로고
    • Work structuring to achieve integrated product-process design
    • ".
    • Tsao, C. C. Y., Tommelein, I. D., Swanlund, E., and Howell, G. A. (2004). " Work structuring to achieve integrated product-process design.." J. Constr. Eng. Manage., 130 (6), 780-789.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.6 , pp. 780-789
    • Tsao, C.C.Y.1    Tommelein, I.D.2    Swanlund, E.3    Howell, G.A.4
  • 30
    • 0002533915 scopus 로고
    • The second Toyota paradox: How delaying decisions can make better cars
    • ".
    • Ward, A., Liker, J., Cristiano, J., and Sobek, D. (1995). " The second Toyota paradox: How delaying decisions can make better cars.." Sloan Manage. Rev., 36 (3), 43-61.
    • (1995) Sloan Manage. Rev. , vol.36 , Issue.3 , pp. 43-61
    • Ward, A.1    Liker, J.2    Cristiano, J.3    Sobek, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.