메뉴 건너뛰기




Volumn 33, Issue 4, 1999, Pages 439-445

Optimal scheduling of the 3-machine assembly-type flow shop

Author keywords

Assembly type production; Branch and bound; Flow shop; Scheduling

Indexed keywords


EID: 0346932895     PISSN: 03990559     EISSN: None     Source Type: Journal    
DOI: 10.1051/ro:1999120     Document Type: Article
Times cited : (39)

References (8)
  • 1
    • 0030123267 scopus 로고    scopus 로고
    • Two Branch and Bound algorithms for the Permutation Flow Shop Problem
    • J. CARLIEK and I. REBAÏ, Two Branch and Bound algorithms for the Permutation Flow Shop Problem, European J. Oper. Res., 1996, 90, no 2, p. 238-251.
    • (1996) European J. Oper. Res. , vol.90 , Issue.2 , pp. 238-251
    • Carliek, J.1    Rebaï, I.2
  • 2
    • 0003899269 scopus 로고    scopus 로고
    • A Heuristic for the Two-Stage Hybrid How Shop Problem
    • M. HAOUARI and R. M'HALLAH, A Heuristic for the Two-Stage Hybrid How Shop Problem, Oper. Res. Lett., 1997, 21, no 1, p. 43-53.
    • (1997) Oper. Res. Lett. , vol.21 , Issue.1 , pp. 43-53
    • Haouari, M.1    M'Hallah, R.2
  • 3
    • 0003075019 scopus 로고
    • Optimal Two and Three-Stage Production Schedule with Setup Times Included
    • S. M. JOHNSON, Optimal Two and Three-Stage Production Schedule with Setup Times Included, Naval Res. Logist. Quart., 1954, 1, p. 61-68.
    • (1954) Naval Res. Logist. Quart. , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 4
    • 0002973186 scopus 로고
    • Les problèmes d'ordonnancement
    • GOTHA, Les problèmes d'ordonnancement. RAIRO-Oper. Res., 1993, 27, p. 77-150.
    • (1993) RAIRO-Oper. Res. , vol.27 , pp. 77-150
  • 6
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
    • C. Y. LEE, T. C. E. CHENG and B. M. T. LIN, Minimizing the makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem. Management Sci., 1993, 39, p. 616-625.
    • (1993) Management Sci. , vol.39 , pp. 616-625
    • Lee, C.Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 7
    • 0346799684 scopus 로고
    • Two-stage Flowshop Scheduling with a Common Second-Stage Machine
    • Los Angeles, May
    • C. OGUZ, and T. C. E. CHENG, Two-stage Flowshop Scheduling with a Common Second-Stage Machine, INFORMS Meeting, Los Angeles, May 1995.
    • (1995) INFORMS Meeting
    • Oguz, C.1    Cheng, T.C.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.