-
1
-
-
0030123267
-
Two Branch and Bound algorithms for the Permutation Flow Shop Problem
-
J. CARLIEK and I. REBAÏ, Two Branch and Bound algorithms for the Permutation Flow Shop Problem, European J. Oper. Res., 1996, 90, no 2, p. 238-251.
-
(1996)
European J. Oper. Res.
, vol.90
, Issue.2
, pp. 238-251
-
-
Carliek, J.1
Rebaï, I.2
-
2
-
-
0003899269
-
A Heuristic for the Two-Stage Hybrid How Shop Problem
-
M. HAOUARI and R. M'HALLAH, A Heuristic for the Two-Stage Hybrid How Shop Problem, Oper. Res. Lett., 1997, 21, no 1, p. 43-53.
-
(1997)
Oper. Res. Lett.
, vol.21
, Issue.1
, pp. 43-53
-
-
Haouari, M.1
M'Hallah, R.2
-
3
-
-
0003075019
-
Optimal Two and Three-Stage Production Schedule with Setup Times Included
-
S. M. JOHNSON, Optimal Two and Three-Stage Production Schedule with Setup Times Included, Naval Res. Logist. Quart., 1954, 1, p. 61-68.
-
(1954)
Naval Res. Logist. Quart.
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
4
-
-
0002973186
-
Les problèmes d'ordonnancement
-
GOTHA, Les problèmes d'ordonnancement. RAIRO-Oper. Res., 1993, 27, p. 77-150.
-
(1993)
RAIRO-Oper. Res.
, vol.27
, pp. 77-150
-
-
-
5
-
-
0345901561
-
Sequencing and Scheduling: Algorithms and Complexity
-
North-Holland, Amsterdam
-
E. L. LAWLER, J. K. LENSTRA, A. H. G. RINNOOY KAN and D. B. SHMOYS, Sequencing and Scheduling: Algorithms and Complexity, in: Operations Research and Management Science, Vol. 4: Logistics of Production and Inventory, North-Holland, Amsterdam, 1993, p. 445-522.
-
(1993)
Operations Research and Management Science, Vol. 4: Logistics of Production and Inventory
, vol.4
, pp. 445-522
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
6
-
-
0027590319
-
Minimizing the makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
-
C. Y. LEE, T. C. E. CHENG and B. M. T. LIN, Minimizing the makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem. Management Sci., 1993, 39, p. 616-625.
-
(1993)
Management Sci.
, vol.39
, pp. 616-625
-
-
Lee, C.Y.1
Cheng, T.C.E.2
Lin, B.M.T.3
-
7
-
-
0346799684
-
Two-stage Flowshop Scheduling with a Common Second-Stage Machine
-
Los Angeles, May
-
C. OGUZ, and T. C. E. CHENG, Two-stage Flowshop Scheduling with a Common Second-Stage Machine, INFORMS Meeting, Los Angeles, May 1995.
-
(1995)
INFORMS Meeting
-
-
Oguz, C.1
Cheng, T.C.E.2
-
8
-
-
0000655488
-
The Two-Stage Assembly Scheduling Problem: Complexity and Approximation
-
C. N. POTTS, S. V. SEVASTJANOV, V. A. STRUSEVICH, L. N. VAN WASSENHOVE and C. M. ZWANEVALD, The Two-Stage Assembly Scheduling Problem: Complexity and Approximation. Oper. Res., 1995, 43, p. 346-355.
-
(1995)
Oper. Res.
, vol.43
, pp. 346-355
-
-
Potts, C.N.1
Sevastjanov, S.V.2
Strusevich, V.A.3
Van Wassenhove, L.N.4
Zwanevald, C.M.5
|